688(275)
Span 1-3 @ Support a=98.45mm
a=ßc
fc’=20MPa 98.45=0.85c
fy =275Mpa c=115.82mm
25mmØ
Mu=175.4kN/m3 Єt = 0.003
d-c c
Depth=base-steel covering-stirrupsØ-radius of =0.003(437.5-115.82)
steelbar 115.82
=500-40-10-12.5 Єt=0.008332 •TC
Depth=437.5mm
Єt=fs/Es
Mu=ɸbd2ρfy(1-ρfy/1.7fc’) fs=0.008332(200,000)
Assume Tension Controlled fs=1666.45MPa
fs>fy •Steel Yields
175.4x106=0.9(300)(437.5)2ρ(275)[1-275ρ/1.7(20)]
ρ =0.01391 Spacing=b-2(cover)-Øbars(N)-stirrups(2)
N-1
ρmax = 0.85fc’ß1(3) =300-2(40)-25(2)-10(2)
Fy(7) 2-1
Spacing=150mm
20MPa<28MPa
ß=0.85
ρmax =0.85(20)(0.85)(3)
275(7)
ρmax =0.02252
ρmax>ρ •SRB
ρmin =√fc’ =√20
4fy 4(275)
ρmin =0.00407
ρmin =1.4 = 1.4
fy 275
ρmin =0.00509
ρ>ρmin •Use ρ
As= ρbd
=(0.01391)(300)(437.5)
As=1825.688mm2
No. Of Bars=As/(π/4)Ø2
= 1825.688
π/4 (25)2
N=3.72≈ 4 bars
Roof deck Horizontal Sec. A (External)
Span 1-3 @ Midspan
fc’=20MPa
C1=T1 fy =275Mpa
25mmØ d-c c
Mu=121.35kN/m3 =0.003(437.5-76.85)
76.85
Depth=base-steel covering-stirrupsØ-radius of Єt=0.01407 •TC
steelbar
=500-40-10-12.5 Єt=fs/Es
Depth=437.5mm fs=0.01407(200,000)
fs=2815.74MPa
Mu=ɸbd2ρfy(1-ρfy/1.7fc’) fs>fy •Steel Yields
Assume Tension Controlled
Spacing=b-2(cover)-Øbars(N)-stirrups(2)
121.35x106=0.9(300)(437.5)2ρ(275)[1-275ρ/1.7(20)] N-1
ρ =0.00923 =300-2(40)-25(3)-10(2)
3-1
ρmax = 0.85fc’ß1(3) Spacing=62.5mm
Fy(7)
20MPa<28MPa
ß=0.85
ρmax =0.85(20)(0.85)(3)
275(7)
ρmax =0.02252
ρmax>ρ •SRB
ρmin =√fc’ =√20
4fy 4(275)
ρmin =0.00407
ρmin =1.4 = 1.4
fy 275
ρmin =0.00509
ρ>ρmin •Use ρ
As= ρbd
=(0.00923)(300)(437.5)
As=1211.438mm2
No. Of Bars=As/(π/4)Ø2
= 1211.438
π/4 (25)2 Roof deck Horizontal Sec. A (External)
N=2.47≈ 3 bars Span 1-3 @ End Support
fc’=20MPa
fy =275Mpa
C1=T1 25mmØ
0.85(20)a(300)=1211.438(275) Mu=102.23kN/m3
a=65.32mm
a=ßc Depth=base-steel covering-stirrupsØ-radius of
65.32=0.85c steelbar
c=76.85mm =500-40-10-12.5
Depth=437.5mm
Єt = 0.003
Mu=ɸbd2ρfy(1-ρfy/1.7fc’) fs>fy •Steel Yields
Assume Tension Controlled
Spacing=b-2(cover)-Øbars(N)-stirrups(2)
102.23x106=0.9(300)(437.5)2ρ(275)[1-275ρ/1.7(20)] N-1
ρ =0.00767 =300-2(40)-25(3)-10(2)
3-1
ρmax = 0.85fc’ß1(3) Spacing=62.5mm
Fy(7)
20MPa<28MPa
ß=0.85
ρmax =0.85(20)(0.85)(3)
275(7)
ρmax =0.02252
ρmax>ρ •SRB
ρmin =√fc’ =√20
4fy 4(275)
ρmin =0.00407
ρmin =1.4 = 1.4
fy 275
ρmin =0.00509
ρ>ρmin •Use ρ
As= ρbd
=(0.00767)(300)(437.5)
As=1006.688mm2
No. Of Bars=As/(π/4)Ø2
= 1006.688
π/4 (25)2
N=2.05≈ 3 bars Roof deck Horizontal Sec. A (External)
Span 4-5 @ Support
fc’=20MPa
C1=T1 fy =275Mpa
0.85(20)a(300)=1006.688(275) 25mmØ
a=54.28mm Mu=4.67kN/m3
a=ßc
54.28=0.85c Depth=base-steel covering-stirrupsØ-radius of
c=54.28mm steelbar
=500-40-10-12.5
Єt = 0.003 Depth=437.5mm
d-c c
=0.003(437.5-54.28) Mu=ɸbd2ρfy(1-ρfy/1.7fc’)
54.28 Assume Tension Controlled
Єt=0.017553 •TC
4.67x106=0.9(300)(437.5)2ρ(275)[1-275ρ/1.7(20)]
Єt=fs/Es ρ =0.00033
fs=0.017553(200,000)
fs=3510.55MPa
ρmax = 0.85fc’ß1(3) 2-1
Fy(7) Spacing=150mm
20MPa<28MPa
ß=0.85
ρmax =0.85(20)(0.85)(3)
275(7)
ρmax =0.02252
ρmax>ρ •SRB
ρmin =√fc’ =√20
4fy 4(275)
ρmin =0.00407
ρmin =1.4 = 1.4
fy 275
ρmin =0.00509
As= ρmin bd
=(0.00509)(300)(437.5)
As=668.063mm2
No. Of Bars=As/(π/4)Ø2
= 668.063
π/4 (25)2
N=1.36≈ 2 bars
C1=T1 fc’=20MPa
0.85(20)a(300)=668.063(275) fy =275Mpa
a=36.02mm 25mmØ
a=ßc Mu=26.73kN/m3
36.02=0.85c
c=42.38mm Depth=base-steel covering-stirrupsØ-radius of
steelbar
Єt = 0.003 =500-40-10-12.5
d-c c Depth=437.5mm
=0.003(437.5-42.38)
42.38 Mu=ɸbd2ρfy(1-ρfy/1.7fc’)
Єt=0.02797 •TC Assume Tension Controlled
Єt=fs/Es 26.73x106=0.9(300)(437.5)2ρ(275)[1-275ρ/1.7(20)]
fs=0.02797(200,000) ρ =0.00191
fs=5593.96MPa
fs>fy •Steel Yields ρmax = 0.85fc’ß1(3)
Fy(7)
Spacing=b-2(cover)-Øbars(N)-stirrups(2)
N-1 20MPa<28MPa
=300-2(40)-25(2)-10(2)
ß=0.85
ρmax =0.85(20)(0.85)(3)
275(7)
ρmax =0.02252
ρmax>ρ •SRB
ρmin =√fc’ =√20
4fy 4(275)
ρmin =0.00407
ρmin =1.4 = 1.4
fy 275
ρmin =0.00509
As= ρmin bd
=(0.00509)(300)(437.5)
As=668.063mm2
No. Of Bars=As/(π/4)Ø2
= 668.063
π/4 (25)2
N=1.36≈ 2 bars
ρmax =0.85(20)(0.85)(3)
275(7)
ρmax =0.02252
ρmax>ρ •SRB
ρmin =√fc’ =√20
4fy 4(275)
ρmin =0.00407
ρmin =1.4 = 1.4
fy 275
ρmin =0.00509
As= ρmin bd
=(0.00509)(300)(437.5)
As=668.063mm2
No. Of Bars=As/(π/4)Ø2
= 668.063
π/4 (25)2
N=1.36≈ 2 bars
C1=T1 fc’=20MPa
0.85(20)a(300)=668.063(275) fy =275Mpa
a=36.02mm 25mmØ
a=ßc Mu=4.67kN/m3
36.02=0.85c
c=42.38mm Depth=base-steel covering-stirrupsØ-radius of
steelbar
Єt = 0.003 =500-40-10-12.5
d-c c Depth=437.5mm
=0.003(437.5-42.38)
42.38 Mu=ɸbd2ρfy(1-ρfy/1.7fc’)
Єt=0.02797 •TC Assume Tension Controlled
Єt=fs/Es 4.67x106=0.9(300)(437.5)2ρ(275)[1-275ρ/1.7(20)]
fs=0.02797(200,000) ρ =0.00033
fs=5593.96MPa
fs>fy •Steel Yields ρmax = 0.85fc’ß1(3)
Fy(7)
Spacing=b-2(cover)-Øbars(N)-stirrups(2)
N-1 20MPa<28MPa
=300-2(40)-25(2)-10(2) ß=0.85
2-1
Spacing=150mm
ρmax =0.85(20)(0.85)(3)
275(7)
ρmax =0.02252
ρmax>ρ •SRB
ρmin =√fc’ =√20
4fy 4(275)
ρmin =0.00407
ρmin =1.4 = 1.4
fy 275
ρmin =0.00509
As= ρmin bd
=(0.00509)(300)(437.5)
As=668.063mm2
No. Of Bars=As/(π/4)Ø2
= 668.063
π/4 (25)2
N=1.36≈ 2 bars
As= ρbd
=(0.00923)(300)(437.5)
As=1211.438mm2
No. Of Bars=As/(π/4)Ø2
= 1211.438 Roof deck Horizontal Sec. A (External)
π/4 (25)2 Span 6-8 @ End Support
N=2.47≈ 3 bars
fc’=20MPa
fy =275Mpa
25mmØ
C1=T1 Mu=175.4kN/m3
0.85(20)a(300)=1211.438(275)
a=65.32mm Depth=base-steel covering-stirrupsØ-radius of
a=ßc steelbar
65.32=0.85c =500-40-10-12.5
c=76.85mm Depth=437.5mm
Єt = 0.003 Mu=ɸbd2ρfy(1-ρfy/1.7fc’)
d-c c Assume Tension Controlled
=0.003(437.5-76.85)
76.85 175.4x106=0.9(300)(437.5)2ρ(275)[1-275ρ/1.7(20)]
Єt=0.01407 •TC ρ =0.01391
ρmax = 0.85fc’ß1(3)
Fy(7)
20MPa<28MPa
ß=0.85
ρmax =0.85(20)(0.85)(3)
275(7)
ρmax =0.02252
ρmax>ρ •SRB
ρmin =√fc’ =√20
4fy 4(275)
ρmin =0.00407
ρmin =1.4 = 1.4
fy 275
ρmin =0.00509
ρ>ρmin •Use ρ
As= ρbd
=(0.01391)(300)(437.5)
As=1825.688mm2
No. Of Bars=As/(π/4)Ø2
= 1825.688
π/4 (25)2
N=3.72≈ 4 bars
C1=T1
0.85(20)a(300)=1825.688(275)
a=98.45mm
a=ßc
98.45=0.85c
c=115.82mm
Єt = 0.003
d-c c
=0.003(437.5-115.82)
115.82
Єt=0.008332 •TC
Єt=fs/Es
fs=0.008332(200,000)
fs=1666.45MPa
fs>fy •Steel Yields
Spacing=b-2(cover)-Øbars(N)-stirrups(2)
N-1
=300-2(40)-25(2)-10(2)
2-1
Spacing=150mm