TOWER

BERSAMA
GROUP

SITE ID : 2314711007

SITE NAME :

TOWER HEIGHT : POLE CAMUFLASE 23 M

SHELTER TYPE : BTS OUTDOOR

ADDRESS : JL. Manunggal Bhakti 30 rt11 Kelurahan Nunukan


Timur Kecamatan Nunukan Kabupaten Nunukan
Provinsi Kalimantan Utara

COORDINAT :
ACKNOWLEDGE BY
PT. Three Hutchison indonesia

TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

PT. TOWER BERSAMA GROUP

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

REMARK
MATERIAL SPECIFICATON
1. SPECIFIED COMPRESSIVE STRENGTH OF REINFORCEMENT
K-225 kg/cm2
2. SPECIFIED YIELD STRENGTH OF REINFORCEMENT
Fy = 240 Mpa for Dia. < 12mm (PLAN BAR)
Fy = 390 Mpa for Dia. > 13mm (DEFORMED BAR)

ANALYSIS & DESIGN GUARANTEED BY

PT. SARMAG KONSULTAN NUSANTARA

MUHAMMAD AMMAR
ENGINEERING MANAGER

PROJECT NAME

B2S - TBIG

SITE ID 2314711007
SITE NAME NUNUKAN EX GUNUNG BUBS BPN
SITE ADDRESS JL. Manunggal Bhakti 30 rt11 Kelurahan
Nunukan Timur Kecamatan Nunukan
Kab. Nunukan Prov. Kalimantan Utara
AS PLAN DRAWING NAME

DRAWING LIST

REVISE

NO DATE ITEM SIGNED

THIS DRAWING IS FULLY PROPERTIES OF


PT. TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY PT. TOWER BERSAMA GROUP

NAME DATE SIGNED

DRAWN

CHECKED

APPROVED

SHEET NO. TOTAL SHEET

01 18
ACKNOWLEDGE BY
PT. Three Hutchison indonesia

PARIT
PARIT TOWER
BERSAMA
PARIT GROUP

5000
ACKNOWLEDGE BY

4000
PT. TOWER BERSAMA GROUP

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

LAMPU CONTROL
GUYED MAST
TAMAN BOX

7000
REMARK

5000
BTS OUTDOOR 1,7M x 3,7M
MATERIAL SPECIFICATON
POLE CAMUFLASE 23M 1. SPECIFIED COMPRESSIVE STRENGTH OF REINFORCEMENT
K-225 kg/cm2
2. SPECIFIED YIELD STRENGTH OF REINFORCEMENT
Fy = 240 Mpa for Dia. < 12mm (PLAN BAR)
Fy = 390 Mpa for Dia. > 13mm (DEFORMED BAR)

ANALYSIS & DESIGN GUARANTEED BY


KWH METER
PT. SARMAG KONSULTAN NUSANTARA

2000 5000
MUHAMMAD AMMAR
ENGINEERING MANAGER

PROJECT NAME
5800

B2S - TBIG

SITE ID 2314711007
SITE NAME NUNUKAN EX GUNUNG BUBS BPN
SITE ADDRESS JL. Manunggal Bhakti 30 rt11 Kelurahan
Nunukan Timur Kecamatan Nunukan
Kab. Nunukan Prov. Kalimantan Utara
AS PLAN DRAWING NAME

SITE MAP
3000
JALAN MANUNGGAL BAKTI JALAN MANUNGGAL BAKTI NO DATE
REVISE

ITEM SIGNED

THIS DRAWING IS FULLY PROPERTIES OF


PT. TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY PT. TOWER BERSAMA GROUP

SITE MAPS LOCATION DRAWN


NAME DATE SIGNED

SCALE : NTS CHECKED

APPROVED

SHEET NO. TOTAL SHEET

02 18
ACKNOWLEDGE BY
PT. Three Hutchison indonesia

A B C D E
- - - - - 5
-
TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

1750
PT. TOWER BERSAMA GROUP
4
-
HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY
1750

3
-
7000

REMARK
MATERIAL SPECIFICATON
1. SPECIFIED COMPRESSIVE STRENGTH OF REINFORCEMENT
K-225 kg/cm2
2. SPECIFIED YIELD STRENGTH OF REINFORCEMENT
1750

Fy = 240 Mpa for Dia. < 12mm (PLAN BAR)

2 Fy = 390 Mpa for Dia. > 13mm (DEFORMED BAR)

- ANALYSIS & DESIGN GUARANTEED BY

PT. SARMAG KONSULTAN NUSANTARA

MUHAMMAD AMMAR
ENGINEERING MANAGER
1750

1 PROJECT NAME

- B2S - TBIG

SITE ID 2314711007
SITE NAME NUNUKAN EX GUNUNG BUBS BPN
SITE ADDRESS JL. Manunggal Bhakti 30 rt11 Kelurahan
1750 1750 1750 1750 Nunukan Timur Kecamatan Nunukan
Kab. Nunukan Prov. Kalimantan Utara
AS PLAN DRAWING NAME
7000
CONTOUR LAYOUT

REVISE

COUNTOUR SITE LOCATION NO DATE ITEM SIGNED

SCALE NTS

THIS DRAWING IS FULLY PROPERTIES OF


CUTTING SOIL :-M PT. TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY PT. TOWER BERSAMA GROUP
FILL SOIL :-M NAME DATE SIGNED

DRAWN

CHECKED

APPROVED

SHEET NO. TOTAL SHEET

03 18
A B C D E A B C D E
+1.50 M +1.50 M
ACKNOWLEDGE BY
PT. Three Hutchison indonesia
+1.00 M +1.00 M

+0.50 M +0.50 M

-0.50 M -0.50 M
TOWER
-1.00 M -1.00 M
BERSAMA
-1.50 M -1.50 M GROUP
ACKNOWLEDGE BY

-2.00 M -2.00 M PT. TOWER BERSAMA GROUP


1750 1750 1750 1750 1750 1750 1750 1750
7000 7000

SECTION 1 SECTION 4 HASPRIYALDI


PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

A B C D E A B C D E
+1.50 M +1.50 M

+1.00 M +1.00 M

+0.50 M +0.50 M
REMARK
MATERIAL SPECIFICATON
1. SPECIFIED COMPRESSIVE STRENGTH OF REINFORCEMENT
K-225 kg/cm2
-0.50 M -0.50 M 2. SPECIFIED YIELD STRENGTH OF REINFORCEMENT
Fy = 240 Mpa for Dia. < 12mm (PLAN BAR)
Fy = 390 Mpa for Dia. > 13mm (DEFORMED BAR)
-1.00 M -1.00 M
ANALYSIS & DESIGN GUARANTEED BY
-1.50 M -1.50 M PT. SARMAG KONSULTAN NUSANTARA

-2.00 M -2.00 M
1750 1750 1750 1750 1750 1750 1750 1750
7000 7000 MUHAMMAD AMMAR
ENGINEERING MANAGER

PROJECT NAME
SECTION 2 SECTION 5
B2S - TBIG
A B C D E SITE ID 2314711007
+1.50 M
SITE NAME NUNUKAN EX GUNUNG BUBS BPN
SITE ADDRESS JL. Manunggal Bhakti 30 rt11 Kelurahan
+1.00 M Nunukan Timur Kecamatan Nunukan
Kab. Nunukan Prov. Kalimantan Utara
AS PLAN DRAWING NAME
+0.50 M
CUT AND FILL

REVISE

-0.50 M NO DATE ITEM SIGNED

-1.00 M

-1.50 M
THIS DRAWING IS FULLY PROPERTIES OF
PT. TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
-2.00 M WITHOUT PERMISSION BY PT. TOWER BERSAMA GROUP

1750 1750 1750 1750 NAME DATE SIGNED

DRAWN

7000 CHECKED

APPROVED

SECTION 3 SHEET NO. TOTAL SHEET

03A 18
1 2 3 4 5 1 2 3 4 5
+1.50 M +1.50 M
ACKNOWLEDGE BY
PT. Three Hutchison indonesia
+1.00 M +1.00 M

+0.50 M +0.50 M

-0.50 M -0.50 M
TOWER
-1.00 M -1.00 M BERSAMA
-1.50 M -1.50 M GROUP
ACKNOWLEDGE BY

PT. TOWER BERSAMA GROUP


-2.00 M -2.00 M
1750 1750 1750 1750 1750 1750 1750 1750
7000 7000

SECTION A SECTION D HASPRIYALDI


PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

1 2 3 4 5 1 2 3 4 5
+1.50 M +1.50 M

+1.00 M +1.00 M

+0.50 M +0.50 M
REMARK
MATERIAL SPECIFICATON
1. SPECIFIED COMPRESSIVE STRENGTH OF REINFORCEMENT
K-225 kg/cm2
-0.50 M -0.50 M 2. SPECIFIED YIELD STRENGTH OF REINFORCEMENT
Fy = 240 Mpa for Dia. < 12mm (PLAN BAR)
Fy = 390 Mpa for Dia. > 13mm (DEFORMED BAR)
-1.00 M -1.00 M
ANALYSIS & DESIGN GUARANTEED BY

-1.50 M -1.50 M PT. SARMAG KONSULTAN NUSANTARA

-2.00 M -2.00 M
1750 1750 1750 1750 1750 1750 1750 1750
MUHAMMAD AMMAR
7000 7000 ENGINEERING MANAGER

PROJECT NAME
SECTION B SECTION E
B2S - TBIG
1 2 3 4 5 SITE ID 2314711007
+1.50 M SITE NAME NUNUKAN EX GUNUNG BUBS BPN
SITE ADDRESS JL. Manunggal Bhakti 30 rt11 Kelurahan
+1.00 M Nunukan Timur Kecamatan Nunukan
Kab. Nunukan Prov. Kalimantan Utara
AS PLAN DRAWING NAME
+0.50 M
CUT AND FILL

REVISE

-0.50 M NO DATE ITEM SIGNED

-1.00 M

-1.50 M THIS DRAWING IS FULLY PROPERTIES OF


PT. TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY PT. TOWER BERSAMA GROUP
-2.00 M
1750 1750 1750 1750 NAME DATE SIGNED

DRAWN

7000 CHECKED

APPROVED

SECTION C SHEET NO. TOTAL SHEET

03B 18
7000 ACKNOWLEDGE BY

4700 1700 600 PT. Three Hutchison indonesia

3500 3500
1400 4200 1400
100 2200 2400 2200 100

100

100
TOWER
BERSAMA

1400
GROUP
ACKNOWLEDGE BY

PT. TOWER BERSAMA GROUP

2200

2200

2700
3500
LAMPU CONTROL
TAMAN BOX HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY
5800
2400

2400
4200
7000

7000
REMARK
MATERIAL SPECIFICATON

BTS OUTDOOR 1,7M x 3,7M


1. SPECIFIED COMPRESSIVE STRENGTH OF REINFORCEMENT
K-225 kg/cm2
2. SPECIFIED YIELD STRENGTH OF REINFORCEMENT
Fy = 240 Mpa for Dia. < 12mm (PLAN BAR)
POLE CAMUFLASE 23M Fy = 390 Mpa for Dia. > 13mm (DEFORMED BAR)

3700
ANALYSIS & DESIGN GUARANTEED BY

PT. SARMAG KONSULTAN NUSANTARA

3500
2000

MUHAMMAD AMMAR

2200
ENGINEERING MANAGER

PROJECT NAME

1400
KWH METER B2S - TBIG
1200

2314711007

600
SITE ID
50

SITE NAME NUNUKAN EX GUNUNG BUBS BPN

100
SITE ADDRESS JL. Manunggal Bhakti 30 rt11 Kelurahan
Nunukan Timur Kecamatan Nunukan
250

3500 50 1675 1675 100 Kab. Nunukan Prov. Kalimantan Utara


AS PLAN DRAWING NAME
250 3000 250 3500
7000 SITE LAYOUT

REVISE

NO DATE ITEM SIGNED


5800

SITE LAYOUT
SCALE NTS
THIS DRAWING IS FULLY PROPERTIES OF
PT. TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY PT. TOWER BERSAMA GROUP

NAME DATE SIGNED

DRAWN

CHECKED

APPROVED

3000 SHEET NO. TOTAL SHEET

04 18
ACKNOWLEDGE BY
PT. Three Hutchison indonesia

100 2200 2400 2200 100

100
100
TOWER
BERSAMA
2200 GROUP

2200
ACKNOWLEDGE BY

PT. TOWER BERSAMA GROUP

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

REMARK
2400

2400
7000
MATERIAL SPECIFICATON
1. SPECIFIED COMPRESSIVE STRENGTH OF REINFORCEMENT
K-225 kg/cm2
2. SPECIFIED YIELD STRENGTH OF REINFORCEMENT
Fy = 240 Mpa for Dia. < 12mm (PLAN BAR)
Fy = 390 Mpa for Dia. > 13mm (DEFORMED BAR)

ANALYSIS & DESIGN GUARANTEED BY

PT. SARMAG KONSULTAN NUSANTARA

MUHAMMAD AMMAR
ENGINEERING MANAGER

PROJECT NAME

B2S - TBIG
2000

2200
SITE ID 2314711007
SITE NAME NUNUKAN EX GUNUNG BUBS BPN
SITE ADDRESS JL. Manunggal Bhakti 30 rt11 Kelurahan
Nunukan Timur Kecamatan Nunukan
Kab. Nunukan Prov. Kalimantan Utara
AS PLAN DRAWING NAME

LAYOUT FOUNDATION FENCE


50

100
REVISE

NO DATE ITEM SIGNED


250

250 3000 250 1675 1675 100


50
7000 THIS DRAWING IS FULLY PROPERTIES OF
PT. TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY PT. TOWER BERSAMA GROUP
LAYOUT FOUNDATION FENCE NAME DATE SIGNED

SCALE NTS DRAWN

CHECKED

APPROVED

SHEET NO. TOTAL SHEET

04 18
ACKNOWLEDGE BY
PT. Three Hutchison indonesia

POLE CAMUFLASE 23M

TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

PT. TOWER BERSAMA GROUP

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

REMARK
MATERIAL SPECIFICATON
1. SPECIFIED COMPRESSIVE STRENGTH OF REINFORCEMENT
K-225 kg/cm2
2. SPECIFIED YIELD STRENGTH OF REINFORCEMENT
Fy = 240 Mpa for Dia. < 12mm (PLAN BAR)
Fy = 390 Mpa for Dia. > 13mm (DEFORMED BAR)
kWH METER PANEL 16,5 kVA

+ 2.65 ANALYSIS & DESIGN GUARANTEED BY

PT. SARMAG KONSULTAN NUSANTARA

500
+ 2.15

MUHAMMAD AMMAR
ENGINEERING MANAGER

PROJECT NAME

B2S - TBIG

1950
SITE ID 2314711007
SITE NAME NUNUKAN EX GUNUNG BUBS BPN
SITE ADDRESS JL. Manunggal Bhakti 30 rt11 Kelurahan
Nunukan Timur Kecamatan Nunukan
Kab. Nunukan Prov. Kalimantan Utara
AS PLAN DRAWING NAME

+ 0.20 VIEW A

200
REVISE

NO DATE ITEM SIGNED

3500 3500
7000
VIEW A THIS DRAWING IS FULLY PROPERTIES OF
PT. TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
SCALE NTS WITHOUT PERMISSION BY PT. TOWER BERSAMA GROUP

NAME DATE SIGNED

DRAWN

CHECKED

APPROVED

SHEET NO. TOTAL SHEET

06 18
ACKNOWLEDGE BY
PT. Three Hutchison indonesia

POLE CAMUFLASE 23M

TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

PT. TOWER BERSAMA GROUP

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

REMARK
MATERIAL SPECIFICATON
1. SPECIFIED COMPRESSIVE STRENGTH OF REINFORCEMENT
K-225 kg/cm2
2. SPECIFIED YIELD STRENGTH OF REINFORCEMENT
Fy = 240 Mpa for Dia. < 12mm (PLAN BAR)
Fy = 390 Mpa for Dia. > 13mm (DEFORMED BAR)

+ 2.65 ANALYSIS & DESIGN GUARANTEED BY

PT. SARMAG KONSULTAN NUSANTARA

500
+ 2.15

MUHAMMAD AMMAR
ENGINEERING MANAGER

PROJECT NAME

B2S - TBIG

1950
SITE ID 2314711007
SITE NAME NUNUKAN EX GUNUNG BUBS BPN
SITE ADDRESS JL. Manunggal Bhakti 30 rt11 Kelurahan
Nunukan Timur Kecamatan Nunukan
Kab. Nunukan Prov. Kalimantan Utara
AS PLAN DRAWING NAME

+ 0.20 VIEW B

200
REVISE

NO DATE ITEM SIGNED

3500 3500
7000
VIEW B THIS DRAWING IS FULLY PROPERTIES OF
PT. TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
SCALE NTS WITHOUT PERMISSION BY PT. TOWER BERSAMA GROUP

NAME DATE SIGNED

DRAWN

CHECKED

APPROVED

SHEET NO. TOTAL SHEET

07 18
ACKNOWLEDGE BY

POLE CAMUFLASE 23M PT. Three Hutchison indonesia

TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

PT. TOWER BERSAMA GROUP

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

+ 2.65

500
+ 2.15 REMARK
MATERIAL SPECIFICATON
1. SPECIFIED COMPRESSIVE STRENGTH OF REINFORCEMENT
K-225 kg/cm2
2. SPECIFIED YIELD STRENGTH OF REINFORCEMENT
Fy = 240 Mpa for Dia. < 12mm (PLAN BAR)
Fy = 390 Mpa for Dia. > 13mm (DEFORMED BAR)

1950
ANALYSIS & DESIGN GUARANTEED BY

PT. SARMAG KONSULTAN NUSANTARA

+ 0.20 MUHAMMAD AMMAR

200
ENGINEERING MANAGER

PROJECT NAME

B2S - TBIG

SITE ID 2314711007
SITE NAME NUNUKAN EX GUNUNG BUBS BPN
SITE ADDRESS JL. Manunggal Bhakti 30 rt11 Kelurahan
Nunukan Timur Kecamatan Nunukan
Kab. Nunukan Prov. Kalimantan Utara
AS PLAN DRAWING NAME

SECTION 1

REVISE

NO DATE ITEM SIGNED

1400 4200 1400


3500 3500
THIS DRAWING IS FULLY PROPERTIES OF
4700 1700 600 PT. TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY PT. TOWER BERSAMA GROUP
7000
NAME DATE SIGNED

SECTION 1-1 DRAWN

CHECKED
Scale NTS
APPROVED

SHEET NO. TOTAL SHEET

08 18
ACKNOWLEDGE BY
POLE CAMUFLASE 23M PT. Three Hutchison indonesia

TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

PT. TOWER BERSAMA GROUP

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

+ 2.65

500
+ 2.15 REMARK
MATERIAL SPECIFICATON
1. SPECIFIED COMPRESSIVE STRENGTH OF REINFORCEMENT
K-225 kg/cm2
2. SPECIFIED YIELD STRENGTH OF REINFORCEMENT
Fy = 240 Mpa for Dia. < 12mm (PLAN BAR)
Fy = 390 Mpa for Dia. > 13mm (DEFORMED BAR)

1950
ANALYSIS & DESIGN GUARANTEED BY

PT. SARMAG KONSULTAN NUSANTARA

+ 0.20 MUHAMMAD AMMAR

200
ENGINEERING MANAGER

PROJECT NAME

B2S - TBIG

SITE ID 2314711007
SITE NAME NUNUKAN EX GUNUNG BUBS BPN
SITE ADDRESS JL. Manunggal Bhakti 30 rt11 Kelurahan
Nunukan Timur Kecamatan Nunukan
Kab. Nunukan Prov. Kalimantan Utara
AS PLAN DRAWING NAME

SECTION 2

REVISE

NO DATE ITEM SIGNED

1400 4200 1400


3500 3500
600 3700 2700 THIS DRAWING IS FULLY PROPERTIES OF
PT. TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY PT. TOWER BERSAMA GROUP
7000
NAME DATE SIGNED

SECTION 2-2 DRAWN

Scale NTS CHECKED

APPROVED

SHEET NO. TOTAL SHEET

09 18
4200
2100 2100 ACKNOWLEDGE BY
PT. Three Hutchison indonesia

9 D16(spacer)

900
1450
1300
50109 109 109 109 109 109 109 109 109 109 10950 TOWER
BERSAMA

50109 109 109 109 109 109 109 109 109 109 10950
TOP BAR D16-200
44-D16 GROUP

1200
ACKNOWLEDGE BY
BOTTOM BAR D16-200
PT. TOWER BERSAMA GROUP
A A
- - PENGIKAT ANGKUR
4200

4200
1300

1300
HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

BOTTOM BAR D16-200

1200
TOP BAR D16-200
IMPLEMENTATION BY
1450

900
REMARK
MATERIAL SPECIFICATON
1. SPECIFIED COMPRESSIVE STRENGTH OF REINFORCEMENT
K-225 kg/cm2
2. SPECIFIED YIELD STRENGTH OF REINFORCEMENT
900 1200 1200 900 Fy = 240 Mpa for Dia. < 12mm (PLAN BAR)
Fy = 390 Mpa for Dia. > 13mm (DEFORMED BAR)

4200 ANALYSIS & DESIGN GUARANTEED BY

FOUNDATION LAYOUT PT. SARMAG KONSULTAN NUSANTARA


SCALE NTS
2100 2100
MUHAMMAD AMMAR
1450 1300 1450 ENGINEERING MANAGER

PROJECT NAME
44-D16 EL.(+) 0.70
B2S - TBIG
700

GRAVEL GRAVEL SITE ID 2314711007


SITE NAME NUNUKAN EX GUNUNG BUBS BPN
ELEVASI RENCANA SITE ADDRESS JL. Manunggal Bhakti 30 rt11 Kelurahan
Nunukan Timur Kecamatan Nunukan
Kab. Nunukan Prov. Kalimantan Utara
AS PLAN DRAWING NAME
2700

BACK FILL SOIL BACK FILL SOIL TOWER FOUNDATION


1650

(COMPACTED) (COMPACTED)
REVISE

NO DATE ITEM SIGNED

9 D16(SPACER) TOP BAR


D16-200
EL.(-) 1.65
350

THIS DRAWING IS FULLY PROPERTIES OF


PT. TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
EL.(-) 2.00 WITHOUT PERMISSION BY PT. TOWER BERSAMA GROUP

NAME DATE SIGNED

DRAWN
4200 CHECKED

APPROVED

SHEET NO. TOTAL SHEET

10 18
ACKNOWLEDGE BY
PT. Three Hutchison indonesia

TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

PT. TOWER BERSAMA GROUP

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

REMARK
MATERIAL SPECIFICATON
1. SPECIFIED COMPRESSIVE STRENGTH OF REINFORCEMENT
K-225 kg/cm2
2. SPECIFIED YIELD STRENGTH OF REINFORCEMENT
Fy = 240 Mpa for Dia. < 12mm (PLAN BAR)
Fy = 390 Mpa for Dia. > 13mm (DEFORMED BAR)

ANALYSIS & DESIGN GUARANTEED BY

PT. SARMAG KONSULTAN NUSANTARA

MUHAMMAD AMMAR
ENGINEERING MANAGER

PROJECT NAME

B2S - TBIG

SITE ID 2314711007
SITE NAME NUNUKAN EX GUNUNG BUBS BPN
SITE ADDRESS JL. Manunggal Bhakti 30 rt11 Kelurahan
Nunukan Timur Kecamatan Nunukan
Kab. Nunukan Prov. Kalimantan Utara
AS PLAN DRAWING NAME

BARBENDING SCHEDULE

REVISE

NO DATE ITEM SIGNED

THIS DRAWING IS FULLY PROPERTIES OF


PT. TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY PT. TOWER BERSAMA GROUP

NAME DATE SIGNED

DRAWN

CHECKED

APPROVED

SHEET NO. TOTAL SHEET

11 18
ACKNOWLEDGE BY
PT. Three Hutchison indonesia

TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

PT. TOWER BERSAMA GROUP

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

REMARK
MATERIAL SPECIFICATON
1. SPECIFIED COMPRESSIVE STRENGTH OF REINFORCEMENT
K-225 kg/cm2
2. SPECIFIED YIELD STRENGTH OF REINFORCEMENT
Fy = 240 Mpa for Dia. < 12mm (PLAN BAR)
Fy = 390 Mpa for Dia. > 13mm (DEFORMED BAR)

ANALYSIS & DESIGN GUARANTEED BY

PT. SARMAG KONSULTAN NUSANTARA

MUHAMMAD AMMAR
ENGINEERING MANAGER

PROJECT NAME

B2S - TBIG

SITE ID 2314711007
SITE NAME NUNUKAN EX GUNUNG BUBS BPN
SITE ADDRESS JL. Manunggal Bhakti 30 rt11 Kelurahan
Nunukan Timur Kecamatan Nunukan
Kab. Nunukan Prov. Kalimantan Utara
AS PLAN DRAWING NAME

STANDARD CIVIL B2S

REVISE

NO DATE ITEM SIGNED

THIS DRAWING IS FULLY PROPERTIES OF


PT. TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY PT. TOWER BERSAMA GROUP

NAME DATE SIGNED

DRAWN

CHECKED

APPROVED

SHEET NO. TOTAL SHEET

12 18
B
ACKNOWLEDGE BY
PT. Three Hutchison indonesia

TOWER
BERSAMA
TOP VIEW
SIDE VIEW SIDE GROUP
ACKNOWLEDGE BY

PT. TOWER BERSAMA GROUP

HASPRIYALDI
1 PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

DETAIL 2 REMARK
DETAIL B MATERIAL SPECIFICATON
DETAIL 1 1. SPECIFIED COMPRESSIVE STRENGTH OF REINFORCEMENT
K-225 kg/cm2
2. SPECIFIED YIELD STRENGTH OF REINFORCEMENT
Fy = 240 Mpa for Dia. < 12mm (PLAN BAR)
Fy = 390 Mpa for Dia. > 13mm (DEFORMED BAR)

ANALYSIS & DESIGN GUARANTEED BY

PT. SARMAG KONSULTAN NUSANTARA

MUHAMMAD AMMAR
ENGINEERING MANAGER

PROJECT NAME
SCALE = 1 : 5 - A4

B2S - TBIG

SITE ID 2314711007
SITE NAME NUNUKAN EX GUNUNG BUBS BPN
SITE ADDRESS JL. Manunggal Bhakti 30 rt11 Kelurahan
Nunukan Timur Kecamatan Nunukan
Kab. Nunukan Prov. Kalimantan Utara
AS PLAN DRAWING NAME
SCALE = 1 : 5 - A4

STANDARD MECHANICAL - B2S


SCALE = 1 : 8 - A4

REVISE

NO DATE ITEM SIGNED

SCALE = 1 : 5 - A4

THIS DRAWING IS FULLY PROPERTIES OF


SCALE = 1 : 8 - A4
PT. TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY PT. TOWER BERSAMA GROUP

NAME DATE SIGNED

DRAWN

CHECKED

APPROVED

SHEET NO. TOTAL SHEET

SCALE = 1 : 8 - A4 13 18
ACKNOWLEDGE BY
PT. Three Hutchison indonesia

TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

PT. TOWER BERSAMA GROUP

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

REMARK
MATERIAL SPECIFICATON
1. SPECIFIED COMPRESSIVE STRENGTH OF REINFORCEMENT
K-225 kg/cm2
2. SPECIFIED YIELD STRENGTH OF REINFORCEMENT
Fy = 240 Mpa for Dia. < 12mm (PLAN BAR)
Fy = 390 Mpa for Dia. > 13mm (DEFORMED BAR)

ANALYSIS & DESIGN GUARANTEED BY

PT. SARMAG KONSULTAN NUSANTARA

MUHAMMAD AMMAR
ENGINEERING MANAGER

PROJECT NAME

B2S - TBIG

SITE ID 2314711007
SITE NAME NUNUKAN EX GUNUNG BUBS BPN
SITE ADDRESS JL. Manunggal Bhakti 30 rt11 Kelurahan
Nunukan Timur Kecamatan Nunukan
Kab. Nunukan Prov. Kalimantan Utara
AS PLAN DRAWING NAME

STANDARD ELECTRICAL - B2S

REVISE

NO DATE ITEM SIGNED

THIS DRAWING IS FULLY PROPERTIES OF


PT. TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY PT. TOWER BERSAMA GROUP

NAME DATE SIGNED

DRAWN

CHECKED

APPROVED

SHEET NO. TOTAL SHEET

14 18
ACKNOWLEDGE BY
PT. Three Hutchison indonesia

TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

PT. TOWER BERSAMA GROUP

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

REMARK
MATERIAL SPECIFICATON
1. SPECIFIED COMPRESSIVE STRENGTH OF REINFORCEMENT
K-225 kg/cm2
2. SPECIFIED YIELD STRENGTH OF REINFORCEMENT
Fy = 240 Mpa for Dia. < 12mm (PLAN BAR)
Fy = 390 Mpa for Dia. > 13mm (DEFORMED BAR)

ANALYSIS & DESIGN GUARANTEED BY

PT. SARMAG KONSULTAN NUSANTARA

MUHAMMAD AMMAR
ENGINEERING MANAGER

PROJECT NAME

B2S - TBIG

SITE ID 2314711007
SITE NAME NUNUKAN EX GUNUNG BUBS BPN
SITE ADDRESS JL. Manunggal Bhakti 30 rt11 Kelurahan
Nunukan Timur Kecamatan Nunukan
Kab. Nunukan Prov. Kalimantan Utara
AS PLAN DRAWING NAME

STANDARD ELECTRICAL - B2S

REVISE

NO DATE ITEM SIGNED

THIS DRAWING IS FULLY PROPERTIES OF


PT. TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY PT. TOWER BERSAMA GROUP

NAME DATE SIGNED

DRAWN

CHECKED

APPROVED

SHEET NO. TOTAL SHEET

15 18
ACKNOWLEDGE BY
PT. Three Hutchison indonesia

TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

PT. TOWER BERSAMA GROUP

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

REMARK
MATERIAL SPECIFICATON
1. SPECIFIED COMPRESSIVE STRENGTH OF REINFORCEMENT
K-225 kg/cm2
2. SPECIFIED YIELD STRENGTH OF REINFORCEMENT
Fy = 240 Mpa for Dia. < 12mm (PLAN BAR)
Fy = 390 Mpa for Dia. > 13mm (DEFORMED BAR)

ANALYSIS & DESIGN GUARANTEED BY

PT. SARMAG KONSULTAN NUSANTARA

MUHAMMAD AMMAR
ENGINEERING MANAGER

A PROJECT NAME

B2S - TBIG

SITE ID 2314711007
SITE NAME NUNUKAN EX GUNUNG BUBS BPN
SITE ADDRESS JL. Manunggal Bhakti 30 rt11 Kelurahan
Nunukan Timur Kecamatan Nunukan
Kab. Nunukan Prov. Kalimantan Utara
AS PLAN DRAWING NAME

STANDARD GROUNDING - B2S

REVISE

NO DATE ITEM SIGNED

THIS DRAWING IS FULLY PROPERTIES OF


PT. TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY PT. TOWER BERSAMA GROUP

NAME DATE SIGNED

DRAWN

CHECKED

APPROVED

SHEET NO. TOTAL SHEET

16 18
ACKNOWLEDGE BY
PT. Three Hutchison indonesia

TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

PT. TOWER BERSAMA GROUP

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

REMARK
MATERIAL SPECIFICATON
1. SPECIFIED COMPRESSIVE STRENGTH OF REINFORCEMENT
K-225 kg/cm2
2. SPECIFIED YIELD STRENGTH OF REINFORCEMENT
Fy = 240 Mpa for Dia. < 12mm (PLAN BAR)
Fy = 390 Mpa for Dia. > 13mm (DEFORMED BAR)

ANALYSIS & DESIGN GUARANTEED BY

PT. SARMAG KONSULTAN NUSANTARA

MUHAMMAD AMMAR
ENGINEERING MANAGER

PROJECT NAME

B2S - TBIG

SITE ID 2314711007
SITE NAME NUNUKAN EX GUNUNG BUBS BPN
SITE ADDRESS JL. Manunggal Bhakti 30 rt11 Kelurahan
Nunukan Timur Kecamatan Nunukan
Kab. Nunukan Prov. Kalimantan Utara
AS PLAN DRAWING NAME

STD. MOUNT. BRACKET FOR HCPT

REVISE

NO DATE ITEM SIGNED

THIS DRAWING IS FULLY PROPERTIES OF


PT. TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY PT. TOWER BERSAMA GROUP

NAME DATE SIGNED

DRAWN

CHECKED

APPROVED

SHEET NO. TOTAL SHEET

17 18
ACKNOWLEDGE BY
PT. Three Hutchison indonesia

TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

PT. TOWER BERSAMA GROUP

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

REMARK
MATERIAL SPECIFICATON
1. SPECIFIED COMPRESSIVE STRENGTH OF REINFORCEMENT
K-225 kg/cm2
2. SPECIFIED YIELD STRENGTH OF REINFORCEMENT
Fy = 240 Mpa for Dia. < 12mm (PLAN BAR)
Fy = 390 Mpa for Dia. > 13mm (DEFORMED BAR)

ANALYSIS & DESIGN GUARANTEED BY

PT. SARMAG KONSULTAN NUSANTARA

MUHAMMAD AMMAR
ENGINEERING MANAGER

PROJECT NAME

B2S - TBIG

SITE ID 2314711007
SITE NAME NUNUKAN EX GUNUNG BUBS BPN
SITE ADDRESS JL. Manunggal Bhakti 30 rt11 Kelurahan
Nunukan Timur Kecamatan Nunukan
Kab. Nunukan Prov. Kalimantan Utara
AS PLAN DRAWING NAME

STD. MOUNT. BRACKET FOR HCPT

REVISE

NO DATE ITEM SIGNED

THIS DRAWING IS FULLY PROPERTIES OF


PT. TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY PT. TOWER BERSAMA GROUP

NAME DATE SIGNED

DRAWN

CHECKED

APPROVED

SHEET NO. TOTAL SHEET

18 18