Sunteți pe pagina 1din 54

 

T MU MD 00009 F2

Form 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 
 

 
© State of NSW through Transport for NSW 2020 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

 
 
 
 
 
Important message 
 
This document is one of a set of standards developed solely and specifically for use on Transport Assets (as defined in the Asset Standards Authority 
Charter). It is not suitable for any other purpose. 
The copyright and any other intellectual property in this document will at all times remain the property of the State of New South Wales (Transport 
for NSW).  
You must not use or adapt this document or rely upon it in any way unless you are providing products or services to a NSW Government agency and 
that agency has expressly authorised you in writing to do so. If this document forms part of a contract with, or is a condition of approval by a NSW 
Government agency, use of the document is subject to the terms of the contract or approval. To be clear, the content of this document is not 
licensed under any Creative Commons Licence. 
This document may contain third party material. The inclusion of third party material is for illustrative purposes only and does not represent an 
endorsement by NSW Government of any third party product or service. 
If you use this document or rely upon it without authorisation under these terms, the State of New South Wales (including Transport for NSW) and 
its personnel does not accept any liability to you or any other person for any loss, damage, costs and expenses that you or anyone else may suffer or 
incur from your use and reliance on the content contained in this document. Users should exercise their own skill and care in the use of the 
document.  
This document may not be current and is uncontrolled when printed or downloaded. Standards may be accessed from the Asset Standards 
Authority website at www.asa.transport.nsw.gov.au 
 

© State of NSW through Transport for NSW 2020 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Standard governance

Owner:  Manager Authorisation, Asset Standards Authority 
Authoriser:  Director, Authorisation and Audit, Asset Standards Authority 
Approver:  Executive Director, Asset Standards Authority on behalf of the ASA Configuration Control 
Board 

Document history

Version  Summary of changes 
1.0  First issue 10 December 2014 
2.0  Second issue 
2.1  Draft issue 
2.2  Interim release to be used for Axess, Boleh Consulting 
2.3  Interim release to be used for applicants with ISA component from Oct 2018 onwards till 
superseded 

For queries regarding this document,  

please email the ASA at  

standards@transport.nsw.gov.au 

or visit www.asa.transport.nsw.gov.au 

 
© State of NSW through Transport for NSW 2020 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Preface 
The Asset Standards Authority (ASA) is a key strategic branch of Transport for NSW (TfNSW). 
As the network design and standards authority for NSW Transport Assets, as specified in the 
ASA Charter, the ASA identifies, selects, develops, publishes, maintains and controls a suite of 
requirements documents on behalf of TfNSW, the asset owner. 

The ASA deploys TfNSW requirements for asset and safety assurance by creating and managing 
TfNSW's governance models, documents and processes. To achieve this, the ASA focuses on 
four primary tasks: 

 publishing and managing TfNSW's process and requirements documents including TfNSW 
plans, standards, manuals and guides 

 deploying TfNSW's Authorised Engineering Organisation (AEO) framework 

 continuously improving TfNSW’s Asset Management Framework 

 collaborating with the Transport cluster and industry through open engagement 

The AEO framework authorises engineering organisations to supply and provide asset related 
products and services to TfNSW. It works to assure the safety, quality and fitness for purpose 
of those products and services over the asset's whole‐of‐life. AEOs are expected to 
demonstrate how they have applied the requirements of ASA documents, including TfNSW 
plans, standards and guides, when delivering assets and related services for TfNSW. 

Compliance with ASA requirements by itself is not sufficient to ensure satisfactory outcomes 
for NSW Transport Assets. The ASA expects that professional judgement be used by competent 
personnel when using ASA requirements to produce those outcomes. 

About this document

This form is to be completed by organisations applying for Authorised Engineering 
Organisation (AEO) assessment. 

 
© State of NSW through Transport for NSW 2020    Page 4 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Table of contents
1.  Introduction .................................................................................................................................... 6 
2.  Accompanying documents .......................................................................................................... 6 
3.  Terms and definitions ................................................................................................................... 6 
4.  Completing the checklist ............................................................................................................. 7 
5.  Assessors Response .................................................................................................................. 10 
 

 
© State of NSW through Transport for NSW 2020    Page 5 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

1. Introduction 
This form is to be completed by organisations applying for Authorised Engineering 
Organisation (AEO) assessment. 

It is completed after the initial meeting with the ASA authorisation facilitator as part of the 
application for the formal AEO assessment process. 

2. Accompanying documents 
The following documents provide additional information to assist in completing this form. 

T MU MD 00009 F1 AEO Engineering Services Matrix 

T MU MD 00009 F3 AEO Self‐assessment Tool 

T MU MD 00009 SP AEO Authorisation Model 

T MU MD 00009 ST AEO Authorisation Requirements 

T MU MD 20001 ST System Safety Standard for New or Altered Assets 

3. Terms and definitions 
The following terms and definitions apply in this document: 

AEO Authorised Engineering Organisation 

ASA Assets Standards Authority 

CMAAC TfNSW Configuration Management and Asset Assurance Committee 

Dep sys deployed system 

Doc sys documented system 

EMC electromagnetic compatibility 

EMI electromagnetic interference 

HF human factors 

ISA independent safety assessment 
 
© State of NSW through Transport for NSW 2020    Page 6 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

RAM reliability, availability and maintainability 

SFAIRP so far as is reasonably practicable 

TfNSW Transport for NSW 

4. Completing the checklist 
This checklist consists from two tables – the general AEO requirements table followed by the 
ISA requirements table. T MU MD 00009 ST AEO Authorisation Requirements document guides 
on general AEO requirements. T MU MD 00004 TI Independent Safety Assessor Requirements 
defines ISA specific requirements, and also provides guidance on the general AEO 
requirements applicability for the ISA scope. 

Responses in the general AEO requirements table cover the entire scope of application 
including the ISA part (as applicable for ISA). The responses are guided by T MU MD 00009 ST 
AEO Authorisation Requirements. In addition – the table directs on how to respond to each 
general AEO requirement in relation to the ISA scope.   

The table for ISA requirements is only used if ISA is within the scope of authorisation. For 
guidance in completing the ISA requirements table refer to T MU MD 00004 TI Independent 
Safety Assessor (ISA) Requirements.  

T MU MD 00004 TI also defines general AEO requirements applicability for the ISA scope of 
authorisation and is to be used together with the T MU MD 00009 ST AEO Authorisation 
Requirements when completing the general AEO requirement table in this form. The table 
includes guidance that is aligned with the T MU MD 00004 TI for convenience. 

To complete this form firstly replace <insert organisation> at the top of the form with the 
organisation's name.  

Then for each applicable requirement, complete the non‐shaded cells by following the steps: 

1. Elaborate on how the organisation meets the requirement in the 'Comments’ cell. The
comment must be applicable, concise and specific to the requirement. If the requirement is
not applicable to the scope, enter N/A in the ‘Comments’ cell.

 
© State of NSW through Transport for NSW 2020    Page 7 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

 
2. Provide a list of evidence which demonstrate the requirement in the 'Evidence' column. If
applicable, include reference to specific sections or pages within the document to indicate
where the information is located that demonstrates in meeting the requirement. The
evidence shall be grouped in documented or deployed.

Documented evidence is documentation relating to procedures, processes, work


instructions, quality (project/design/construction) plans, templates and forms.

Deployed evidence is documentation which demonstrates the use of the above


documented evidence or evidence in delivering the services/products to satisfy
requirement if there is no documented evidence.

Evidence listed in the documented and deployed evidence cells shall match the maturity
rating.

3. Enter a self-assessed maturity rating (0 – 5 as defined in

 
© State of NSW through Transport for NSW 2020    Page 8 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

4. Table 1) of the level of confidence in the organisation's documented systems and


organisation's deployment of its own documented processes in the 'Doc sys rating' and
‘Dep sys rating' column respectively. ‘Dep sys rating’ cannot be higher than the ‘Doc sys
rating’.

Note: A maturity rating of 4 or 5 is only possible if the optional ENM23 and ENM24
requirements are completed and that all applicable requirements’ maturity ratings are at
least 3.

If further clarification is needed, contact your authorisation facilitator.

 
© State of NSW through Transport for NSW 2020    Page 9 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Table 1 - Levels of maturity and description of rating levels

Rating level  Rating level description 
0 The organisation does not currently have or meet the requirement or 
capability. 
1 The requirement or capability is created or deployed unpredictably 
with poor control and is reactive. 
2 The requirement or capability is created or deployed on a case‐by‐case 
(project or service) basis and is often reactive. 
3 The requirement or capability is created or deployed at the 
organisational level and is tailored for projects or services accordingly. 
4 The requirement or capability is created or deployed at the 
organisational level and is actively measured and controlled within the 
organisation (only used at organisational or organisational unit level). 
5 The requirement or capability is created or deployed at the 
organisational level and continuously improved based on quantitative 
measurements (only used at organisational or organisational unit 
level). 
N/A  Not applicable  
 

5. Assessors Response 
A preliminary review will be conducted on the self‐assessment toolkit and if satisfactory, the 
ASA will request you submit the evidence before you are qualified for an assessment.  

When a preliminary review is undertaken, assessors will select the relevant checkbox: 

 N/A – requirement is not applicable for the scope applied 

 Accept – the evidence listed is satisfactory and can proceed to the assessment stage 

 Resubmit – the evidence listed is unsatisfactory to proceed to the assessment stage 
providing feedback comments for the applicant to address and resubmit for another 
review.  

On resubmission, the applicant makes the necessary changes to the comment, evidence 
and/or maturity rating by enabling tracked changes to the document. 
 
© State of NSW through Transport for NSW 2020    Page 10 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

The ASA can provide general comments such as maturity ratings or scope relating to the 
Engineering Services Matrix at the end of this document. 

 
© State of NSW through Transport for NSW 2020    Page 11 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

AEO self‐assessment checklist for <insert organisation> 
 
ASA 1st Initial Check Date:    ASA 2nd Initial Check Date:   

  
Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
1 – Engineering management process and planning 
ENM1 – An AEO shall have engineering management processes and methodologies appropriate to its engineering services and suitably aligned with ISO 9001 Quality 
management systems – Requirements, ISO 55000 Asset management ‐ Overview, principles and terminology, AS ISO 55001 Asset management – Management systems – 
Requirements and AS/NZS ISO 9001 Quality management systems – Requirements. 
Comments:  Documented Evidence:     
 < Applicable for the ISA scope. Refer to T MU MD 00004 TI for additional guidance. Provide brief   
general overview here. The additional specific to ISA details are elaborated in responses to the ‘ISA 
Deployed Evidence: 
requirements’ section in this checklist.> 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
 
© State of NSW through Transport for NSW 2020    Page 12 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
SME Name:      
SME Notes:  
 
    
ENM2 – Design AEOs shall have capability to provide design support during procurement, manufacturing, construction, integration, test and commissioning stages. 
Comments:  Documented Evidence:     
 < Not applicable if applying for the ISA scope only. >   
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    

 
© State of NSW through Transport for NSW 2020    Page 13 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
2 – Requirements management 
ENM3 – An AEO shall have requirements management arrangements that set out appropriate process, responsibilities, structure, tools and deliverables for 
management of stakeholder requirements applicable to the scope of engineering services provided across the system life cycle. 
Comments:  Documented Evidence:     
 < Applicable for the ISA scope. Refer to T MU MD 00004 TI for additional guidance. >   
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
3 – Service or solution engineering 
Interface management 

 
© State of NSW through Transport for NSW 2020    Page 14 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
ENM4 – An AEO shall have interface management arrangements that set out the processes, responsibilities, structures, tools and deliverables. 
Comments:   Documented Evidence:     
 < Do not respond for the ISA scope here. It is covered in the ISA checklist. Refer to T MU MD 00004   
TI. > 
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
Integration management 
ENM5 – An AEO shall demonstrate that it has suitable management arrangements to plan and carry out the integration of all the declared products or systems as 
appropriate to the scope of authorisation. 

 
© State of NSW through Transport for NSW 2020    Page 15 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
Comments:   Documented Evidence:     
< Do not respond for the ISA scope here, it is covered in the ISA checklist. Refer to T MU MD 00004 TI.   

Deployed Evidence: 
  
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
System architecture management 
ENM6 – A design AEO shall demonstrate that it has arrangements to manage the synthesis and development of system level requirements into a credible system 
architecture. 
Comments:  Documented Evidence:     
 < Not applicable if applying for the ISA scope only. >   

 
© State of NSW through Transport for NSW 2020    Page 16 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
Sustainability in design 
ENM7 – An AEO shall incorporate sustainability in design principles as relevant to the scope of the authorised engineering services. 
Comments:  Documented Evidence:     
 < Not applicable if applying for the ISA scope only. >   
Deployed Evidence: 
 

 
© State of NSW through Transport for NSW 2020    Page 17 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
RAM management 
ENM8 – An AEO shall demonstrate that it has RAM management arrangements in place, relevant to the engineering services or products provided. 
Comments:   Documented Evidence:     
< Do not respond for the ISA scope here. It is covered in the ISA9. Refer to T MU MD 00004 TI. >   
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  

 
© State of NSW through Transport for NSW 2020    Page 18 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
SME Name:      
SME Notes:  
 
    
Human factors integration 
ENM9 – An AEO shall manage all HF relevant to the scope of the authorised engineering services. 
Comments:   Documented Evidence:     
< Do not respond for the ISA scope here. It is covered in the ISA9. Refer to T MU MD 00004 TI. >   
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 

 
© State of NSW through Transport for NSW 2020    Page 19 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
    
Electromagnetic Compatibility (EMC) 
ENM10 – An AEO engaged by TfNSW to undertake engineering activities involving the specification, design, integration, testing and maintenance of electrical or 
electronic systems involving EMI emitters (threats) or receivers (victims) shall have arrangements for managing EMC. 
An AEO engaged by TfNSW to undertake engineering activities involving the specification, design, build, integration or modification of electrically conductive or 
magnetically permeative structures shall ensure that arrangements are in place for managing electromagnetic interference and electromagnetic compatibility. 
Comments:   Documented Evidence:     
< Do not respond for the ISA scope here. It is covered in the ISA9. Refer to T MU MD 00004 TI. >   
  Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
 
© State of NSW through Transport for NSW 2020    Page 20 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
4 – Assurance, verification and validation 
ENM11 – An AEO shall have arrangements for verification and validation management of the engineering services or products provided. 
Comments:   Documented Evidence:     
< Do not respond for the ISA scope here. It is covered in the ISA checklist. Refer to T MU MD 00004 TI.   

Deployed Evidence: 
  
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
ENM12 – An AEO shall demonstrate engineering assurance based on progressive stage gateway reviews. 
Comments:  Documented Evidence:     
 < Do not respond for the ISA scope here. It is covered in the ISA checklist. Refer to T MU MD 00004   

 
© State of NSW through Transport for NSW 2020    Page 21 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
TI. >  Deployed Evidence: 
   
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
ENM13 – AEOs shall apply a risk‐based approach to engineering assurance. 
Comments:   Documented Evidence:     
< Do not respond for the ISA scope here. It is covered in the ISA7. Refer to T MU MD 00004 TI. >   
Deployed Evidence: 
 

 
© State of NSW through Transport for NSW 2020    Page 22 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
Judgment of significance (JOS) 
ENM14 – An AEO shall establish arrangements for assessing the significance of proposed engineering changes arising from the delivery of its engineering services. 
Comments:   Documented Evidence:     
< Do not respond for the ISA scope here. It is covered in the ISA7. Refer to T MU MD 00004 TI. >    
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  

 
© State of NSW through Transport for NSW 2020    Page 23 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
SME Name:      
SME Notes:  
 
    
System safety assurance 
ENM15 – The AEO shall have system safety assurance arrangements in place relevant to the engineering services or products provided. These arrangements must 
include suitable planning activities and deliverables. They must also demonstrate suitable and sufficient integration into the engineering services. 
Comments:   Documented Evidence:     
< Do not respond for the ISA scope here. It is covered in the ISA1. Refer to T MU MD 00004 TI. >    
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
 
© State of NSW through Transport for NSW 2020    Page 24 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
    
ENM16 – The AEO's safety assurance arrangements must provide progressive assurance through the project or system life cycle. 
Comments:   Documented Evidence:     
< Do not respond for the ISA scope here. It is covered in the ISA checklist. Refer to T MU MD 00004 TI.   

Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
ENM17 – The AEO shall have arrangements for the identification and management of safety risks associated with the changes to be introduced. The process should 
follow a life cycle approach such that the granularity of risks and the level of analysis aligns with the progression through the engineering life cycle. It shall also support 
risk‐based decision‐making with records to show traceability of all decisions made. 

 
© State of NSW through Transport for NSW 2020    Page 25 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
Comments:   Documented Evidence:     
< Do not respond for the ISA scope here. It is covered in the ISA1. Refer to T MU MD 00004 TI. >     
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
ENM18 – The AEO shall have arrangements for delivering safety assurance arguments and supporting evidence (or input to such documentation) that describes how it 
has ensured safety SFAIRP and managed safety risks to tolerable and SFAIRP. The content of such documents should be aligned with the requirements of 
T MU MD 20001 ST so that they meet the requirements of the CMAAC process. 
Comments:   Documented Evidence:     
< Do not respond for the ISA scope here. It is covered in the ISA1 responses. Refer to T MU MD 00004   

 
© State of NSW through Transport for NSW 2020    Page 26 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
TI. >  Deployed Evidence: 
    
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
ENM19 – AEO safety engineering and assurance arrangements shall be subject to ISA, where it is responsible for the introduction of new or novel systems that affect the 
operational safety of the network or where the general scope and complexity of the project requires it. There shall be arrangements in place to support the 
appointment of an ISA organisation and to engage with an ISA organisation at all stages of the engineering activities being undertaken when required and in accordance 
with the relevant standards and best practice for the scope of works. 
Comments:   Documented Evidence:     
< Not applicable if applying for the ISA scope only. >   
   Deployed Evidence: 
 

 
© State of NSW through Transport for NSW 2020    Page 27 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
5 – Configuration management 
CFM1 – An AEO shall have a documented system that describes the management of the configuration of all proposed or existing configuration items under its control as 
relevant to the scope of the authorised engineering service. 
Comments:  Documented Evidence:     
< Applicable for the ISA scope. Refer to T MU MD 00004 TI section 8.1.13 for additional guidance. >   
   Deployed Evidence: 
 

 
© State of NSW through Transport for NSW 2020    Page 28 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
6 – Competence management 
CPM1 – An AEO shall have comprehensive arrangements and systems for managing the competence of its staff, contractors, sub‐contractors and other third party 
suppliers, relevant to the engineering services provided. 
Comments:  Documented Evidence:     
< Applicable for the ISA scope. Refer to T MU MD 00004 TI for additional guidance. >   
   Deployed Evidence: 
 

 
© State of NSW through Transport for NSW 2020    Page 29 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
CPM2 – An AEO shall consider relevant external qualification standards to benchmark the skills to be assessed and maintain evidence that relevant industry competence 
requirements, including TfNSW Standards, have been analysed and interpreted for the appropriate engineering services offered. 
Comments:  Documented Evidence:     
 < Applicable for the ISA scope. Refer to T MU MD 00004 TI for additional guidance. >   
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  

 
© State of NSW through Transport for NSW 2020    Page 30 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
SME Name:      
SME Notes:  
 
    
CPM3 – An AEO shall have arrangements in place to train, develop and assess the competence of staff using established methods and competence standards, including 
establishing training and development needs for staff delivering engineering services. 
Comments:  Documented Evidence:     
< Applicable for the ISA scope. Refer to T MU MD 00004 TI for additional guidance. >   
   Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
 
© State of NSW through Transport for NSW 2020    Page 31 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
CPM4 – An AEO shall provide for the planning, implementation, recording, assessment and recognition of relevant continuing professional development activities to 
enhance the knowledge and skills of staff and the organisation as a whole. 
Comments:  Documented Evidence:     
< Applicable for the ISA scope. Refer to T MU MD 00004 TI for additional guidance. >   
   Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
CPM5 – An AEO shall maintain competence management records that contain appropriate and up‐to‐date information about all competence aspects of a candidate. All 
records shall be maintained for audit purposes and must be stored in a secure location for the duration of the AEO certification validity period. 
Comments:  Documented Evidence:     
< Applicable for the ISA scope. Refer to T MU MD 00004 TI for additional guidance. >   
 
© State of NSW through Transport for NSW 2020    Page 32 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
   Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
CPM6 – An AEO shall establish and maintain a register of all engineering and other engineering‐related services provided by staff and their competences. 
Comments:  Documented Evidence:     
< Applicable for the ISA scope. Refer to T MU MD 00004 TI for additional guidance. >   
   Deployed Evidence: 
 

 
© State of NSW through Transport for NSW 2020    Page 33 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
CPM7 – An AEO shall maintain the competence of those managers and assessors implementing the competence management system and ensure that the managers and 
assessors understand their responsibilities. 
Comments:  Documented Evidence:     
< Applicable for the ISA scope. Refer to T MU MD 00004 TI for additional guidance. >   
   Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  

 
© State of NSW through Transport for NSW 2020    Page 34 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
SME Name:      
SME Notes:  
 
    
CPM8 – An AEO shall demonstrate its knowledge management capability as suitable to the scope of services and the sharing of industry relevant lessons learnt within 
the organisation and with the ASA. 
Comments:  Documented Evidence:     
< Applicable for the ISA scope. Refer to T MU MD 00004 TI for additional guidance. >   
   Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
 
© State of NSW through Transport for NSW 2020    Page 35 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
7 – Stakeholder management 
ENM20 – An AEO shall have arrangements in place to identify and manage internal and external stakeholders as appropriate to the scale and scope of engineering 
services being provided. 
Comments:   Documented Evidence:     
< Do not respond for the ISA scope here. It is covered in the ISA checklist. Refer to T MU MD 00004 TI.   
>  
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
8 – Resources management 

 
© State of NSW through Transport for NSW 2020    Page 36 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
ENM21 – An AEO shall have arrangements in place to ensure the required tangible and non‐tangible resources are available as necessary for the provision of the 
authorised scope of engineering services. 
Comments:  Documented Evidence:     
 < Do not respond for the ISA scope here. It is covered in the ISA checklist. Refer to T MU MD 00004   
TI. > 
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
9 – Supplier management 
ENM22 – An AEO shall have arrangements in place, appropriate to the scope of services, to manage selection, evaluation and monitoring of internal or external 
suppliers and to assure selection and acquisition of required products and services. 

 
© State of NSW through Transport for NSW 2020    Page 37 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
Comments:  Documented Evidence:     
 < Not applicable if applying for the ISA scope only. >   
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
10 – Performance measurement and evaluation 
ENM23 – An AEO shall periodically review key service delivery processes using established measurement processes, methods and defined quantitative performance 
criteria. 
Comments:  Documented Evidence:     
< Applicable for the ISA scope. Refer to T MU MD 00004 TI for additional guidance. >   

 
© State of NSW through Transport for NSW 2020    Page 38 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
11 – Continual improvement management 
ENM24 – An AEO shall have arrangements in place for continual and systematic process improvement based on measured processes performance. 
Comments:  Documented Evidence:     
 < Applicable for the ISA scope. Refer to T MU MD 00004 TI for additional guidance. >   
Deployed Evidence: 
 

 
© State of NSW through Transport for NSW 2020    Page 39 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 

Dep sys 
Doc sys 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or 

rating 

rating 
page) 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:      
SME Notes:  
 
    
Additional response to Self‐assessment Toolkit 
ASA additional comments (including maturity and scope) if applicable:  
 
 
 

   

 
© State of NSW through Transport for NSW 2020    Page 40 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

AEO self‐assessment checklist – ISA requirements for <insert organisation> 
Requirements  Evidence 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or page) 
ISA Organisation Competence and Capability 
ISA1 – The ISA organisation must demonstrate a high level of competence and capability within its management process and arrangements for ISA services in the 
following areas: 
– System safety assurance 
– Safety engineering 
– Safety risk management 
– Safety argumentation. 
Comments:  Documented Evidence: 
    
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  

 
© State of NSW through Transport for NSW 2020    Page 41 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or page) 
SME Name:  
SME Notes:  
 
    
Establishing and maintaining the assessment team 
ISA2 – The ISA organisation shall have a process for the definition of roles and responsibilities for ISA roles with technical skills and competence criteria defined for each 
ISA role recorded in a competency framework similar to IET (Refer to Appendix A). This should include Lead ISA role and proficiency levels required. When an ISA team is 
formed, the roles and responsibility for each team member and the internal reporting structure of the team should be clear. 
Comments:  Documented Evidence: 
    
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:  
SME Notes:  
 
 
© State of NSW through Transport for NSW 2020    Page 42 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or page) 
    
ISA3 – The ISA organisation shall have a process for assembling an ISA team covering all relevant disciplines associated with the scope of an ISA assignment. The process 
shall be supported by suitable and sufficient governance within the organisation. The ISA team shall be led by a lead assessor appointed through an appropriate process 
and authorised by the organisation’s senior management. The ISA organisation shall have a documented process to assure the competence of contracted ISA team 
members, including subject matter experts. 
Comments:  Documented Evidence: 
    
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:  
SME Notes:  
 
    

 
© State of NSW through Transport for NSW 2020    Page 43 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or page) 
ISA4 – The ISA organisation should have personnel policies and arrangements in place to ensure that the organisational capability is maintained in the subject matter 
expertise fields within the authorisation scope and with respect to ongoing ISA engagements. Gaps in capability due to new developments, staff turnover shall be 
proactively managed. The ISA process shall identify the management of gaps in competency. Evidence should include established commitment to training and 
professional development review. 
Comments:  Documented Evidence: 
    
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:  
SME Notes:  
 
    
Independence, impartiality and confidentiality 

 
© State of NSW through Transport for NSW 2020    Page 44 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or page) 
ISA5 – The ISA organisation shall have a process for managing, maintaining and demonstrating its independence and the independence of its employee’s. The ISA 
organisation shall not be influenced commercially, financially or otherwise that could compromise the ability of the ISA organisation to reach an independent and 
objective judgement without bias or the suggestion of any bias. 
Comments:  Documented Evidence: 
    
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:  
SME Notes:  
 
    
Assessment conduct 
ISA6 – The ISA organisation shall have a process for planning the assessment program using appropriate assessment, audit and other tools to assess the safety program 
that sets out the activities, reviews and other involvement as well as reporting methods and milestones progressively through the life cycle. Further information on ISA 
plans is provided in Section 9.3 of T MU MD 00003 GU Guidance to Independent Safety Assessment. 
 
© State of NSW through Transport for NSW 2020    Page 45 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or page) 
Comments:  Documented Evidence: 
    
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:  
SME Notes:  
 
    
ISA7 – The ISA organisation shall use a risk‐based approach to determine the areas of greatest focus within the scope of the assessment. The process for planning and 
conducting the assessment shall identify and record how the assessor reviews the scope of the assessment and identifies the key areas for assessment activities and the 
activities to be undertaken. The outcome of this process should be included in, and traceable to, the relevant ISA plans and ISA reports. 
Comments:  Documented Evidence: 
    
Deployed Evidence: 
 
 
© State of NSW through Transport for NSW 2020    Page 46 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or page) 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:  
SME Notes:  
 
    
ISA8 – The ISA organisation shall have an ISA plan for conducting their work, setting out its approach to proactive assessment and analysis of the customer's engineering 
process and life cycle as it is executed during system development. 
Comments:  Documented Evidence: 
    
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  

 
© State of NSW through Transport for NSW 2020    Page 47 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or page) 
SME Name:  
SME Notes:  
 
    
ISA9 – The ISA organisation shall include in its scope of assessment risks to safety, at minimum to include the following: 
• human factors, 
• RAM activities 
• verification and validation activities undertaken as part of the system assurance 
• interfaces in the assessment of systems 
• electromagnetic compatibility (EMC) risks to safety (where applicable). 
Comments:  Documented Evidence: 
    
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  

 
© State of NSW through Transport for NSW 2020    Page 48 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or page) 
SME Name:  
SME Notes:  
 
    
ISA10 – The ISA organisation shall have a management process to ensure that work carried out during ISA will support a final recommendation and judgement based on 
the arguments and evidence provided. It shall ensure that a coordinated set of activities lead to this judgement and that the judgement is reached independently of the 
organisation or organisations subject to assessment. 
Comments:  Documented Evidence: 
    
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:  
SME Notes:  
 
    
 
© State of NSW through Transport for NSW 2020    Page 49 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or page) 
ISA11 – The ISA Organisation shall have a project management capability and documented processes for managing ISA assignments. 
Comments:  Documented Evidence: 
    
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:  
SME Notes:  
 
    
Reporting 
ISA12 – The ISA organisation shall be able to demonstrate a process for reporting, managing and communicating comments, observations and issues that enable clear 
reporting and traceability and transparency through all stages of the assessment process, including facilitating their close out. 
Comments:  Documented Evidence: 
    

 
© State of NSW through Transport for NSW 2020    Page 50 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or page) 
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:  
SME Notes:  
 
    
Reporting 
ISA13 – The ISA organisation shall be able to provide progress reports, issues categorised for importance, and status summaries as required to support key project 
milestones and facilitate the proactive and early identification of issues and maintain regular interaction across stakeholders. Progress reports shall be provided at 
configuration management gates (a requirement of the T MU MD 20001 ST) as well as any other key assessment milestones either identified by the project, AEO or lead 
ISA. Status shall be reported against identified issues. 
Comments:  Documented Evidence: 
    
Deployed Evidence: 
 
 
© State of NSW through Transport for NSW 2020    Page 51 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or page) 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:  
SME Notes:  
 
    
Governance 
ISA14 – The ISA organisation shall have a process for the compilation, review and sign‐off of ISA reports and recommendations, including necessary governance and 
quality assurance measures. This shall include review from outside of the assessment team for key reports and high impact findings. 
Comments:  Documented Evidence: 
    
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  

 
© State of NSW through Transport for NSW 2020    Page 52 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or page) 
SME Name:  
SME Notes:  
 
    
ISA15 – The ISA organisation shall have a structure and process in place for managing engagement with the client and delivery AEO and its suppliers. This should include 
a communication framework that identifies the parties that can communicate at the AEO interface or interfaces and the TfNSW interface. 
Comments:  Documented Evidence: 
    
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:  
SME Notes:  
 
    

 
© State of NSW through Transport for NSW 2020    Page 53 of 54 

 
T MU MD 00009 F2 

ISA AEO Self‐assessment Checklist 

Version 2.3 

Issued date: xx xxx 2018 

Requirements  Evidence 
(for guidance refer to T MU MD 00009 ST AEO Authorisation Requirements)  (document number, title and relevant section or page) 
ISA16 – The ISA organisation shall have within its process a means of escalating issues that are not being appropriately resolved. This should initially be at the interface 
between the ISA and the AEO and ultimately at the interface between the ISA and TfNSW. 
Comments:  Documented Evidence: 
    
Deployed Evidence: 
 
ASA Initial Check: 1st Round  ☐ N/A  ☐ Accept ☐ Resubmit;  2nd Round  ☐ Accept ☐ Resubmit 
1st:  
2nd:  
SME Name:  
SME Notes:  
 
    
 

 
© State of NSW through Transport for NSW 2020    Page 54 of 54 