Sunteți pe pagina 1din 4

99444 67132

V.Stalin Over
BE 18 Years Experience in the Valve & Automobile Industries
stalin.qm@gmail.com

QC, QA & MR
Foundry, Machine Shop & Valve Assembly Divisions

Objective

To join an organization that will recognize and utilize my skills fully where continuous growth and learning
are a way to life.

Education Qualification

Board/ Year of
Course Institution Marks %
University completion
Anna
B.E (PT) -MECH Coimbatore Institute of Technology Oct - 2012 63.4
University
DME S.R.V. Polytechnic, Nagapattinam (Dist). DOTE Apr - 2001 90.8

HSC Govt. High. Sec. School. Koothanallur State Board Apr - 1998 50

SSLC Govt. High. Sec. School. Koothanallur State Board Apr - 1996 61

Additional Qualification

Total Quality Management with Certification

 Internal Auditor in ISO 9001-2015


 Quality Management System – QMS
 Failure Mode and Effect Analysis – FMEA
 Cost of Quality – COQ

Non-Destructive Testing

 Magnetic Particle Testing - MPT


 Liquid Penetrant Testing – LPT
 Visual Testing – VT

CAD & CAM

 Auto CAD (Certification)


 CNC Programming and Operations (Certification)
 Solid Works
CERTIFICATION EXPERIENCE

 ISO 9001
 TS 16949
 ISI
 IBR
 Welder Qualification

For the Post of Page 1


99444 67132
V.Stalin BE stalin.qm@gmail.com

IMPLEMENTED BUSINESS SOFTWARE

 ERP

Project in Valves

 Cryogenic Project for Wedge Gate & Ball Valve – BS 6364 : 1984
 Fire Safe Project for Swing Check Valve – API 6FD
 Fire Safe Project for Ball Valve – API 607 : 2005

EMPLOYER & EXPERIENCE DETAIL

WORKING DESIGNATION & IMPORTANT


EMPLOYERS DETAIL PRODUCT DETAIL
PERIOD DEPARTMENT CUSTOMERS
7. Bright Sun Engineering and Jan 2019 to
Sheet Metal Products Till Dates
Mgr – QMS & ERP Direct Marketing
Fabrications
Industrial Valve
6. Castlegate Industrial Holdings Jun 2018 to GTN, KSB, MMD,
Castings & Mn Steel Jan 2019
Mgr - QC Propel, Soteco-USA
(P) Limited
Castings
Industrial Valves – NTPC, BWSSB, SREE
Oct 2015 to Manager – QA &
5. V-TORK Controls KGV, BV, WGV, Jun 2018
CEMENT, JSW,
QC, ERP HINDALCO, ISRO
BfV-DO, CV, etc
Defense Vehicle, Earth BEML, Faiveley-
Apr 2011 to Dy. Mgr - QA & QC,
4. UR Castings & Alloys (P) Ltd Mover & Railway Oct 2015
India, BHEL, Hydro
ISO Co-Ordinator
Component Prokav
QC HOD – M/c
Industrial Valves –
3. Sri Ranganathar Valves (P) Aug 2004 to Shop, Flow Serve, Tyco,
WGV, GLV, SCV, BV, Apr 2011 Cameron, Lee, Dezurik
Ltd IA & ISO Co-
KGV, BfV
Ordinator
Automobile Feb 2003 to
2. Sathya Component Center Mar 2004
QC Inspector RANE Madras
Component
Dec 2001 to Tech. Apprentice -
1. Chennai Petroleum Corp. Ltd Petroleum Products Dec 2002
Government
Purchase & Stores

EMPLOYER & EXPERIENCE DETAIL

QUALITY ASSURANCE

 QMS - Preparation, Monitoring & Control.


-Like Manual, Procedures, Data Sheets, Instructions & Process Modules etc.
 Internal Auditing & MRM - Plan, Organize & Documentation.
 Objective – Implementation, Monitoring & Control.
 Action Plan for Shortfall of objective through mandatory communication system.
 Feasibility Study – Related to Inspection, QC & QA Activities in Foundry, M/c Shop & Assembly.
 PPAP, FMEA, Quality Control Plan - Preparation, Monitoring & Documentation.
 Problem Solving (NC Management) – 8D for External.
 IBR Documentation Follow-up.
 ISI Approval & Certification follow-up.
 Customer Handling related to Technical Subjects, Needs & Expectation about Quality.

For the Post of Page 2


99444 67132
V.Stalin BE
 Customer Satisfaction Survey – Analysis & Improvement Methodology.
stalin.qm@gmail.com

 Kaizen - Continuous Improvement Follow up.


 Supplier Management - Audit, Ratting & Qualification.
 Welding – Qualification & Documentation.
 Implementation, Monitoring & Control -Risk Matrix, Internal & External Issues.
 Handling of Interested Parties.
 Implementation of Quality Pillars of TPM.
 Awareness about all Quality Standards and Parameters.
 Good Man Management Skill.

QUALITY CONTROL (Foundry, Machine Shop & Assembly)

 Managing, Monitoring & Controlling of Suppliers Quality.


 Statistical Process Control – SPC using 7QC Tools.
 Second (Customer) & Third Party Inspection Handling.
 In charge for Calibration of MMD.
 Rejection & Rework Analysis – Problem Solving -8D (Internal) & Reduce Internal Rejection.
 R & R Study.
 Poka Yoke - Mistake Proofing Analysis.
 Controlling Cost of Quality & Cost of Poor Quality..
 In charge of Lab Activities – Chemical, Mechanical & Physical Property Analysis.
 In charge of Heat Treatment – Annealing, Normalizing, Tempering & Hardening, etc.
 Sample Development.
 Customer Property Control (Drgs, Gauges, Specification, etc).
 Gauge Preparation & Control.
 Part & Valve Assembly Drawing Verification & Approval.
 Pareto diagram for line rejections & analyze the defects.
 Cause & Effective Diagram Analysis – for 4M (Man, Machine, Method & Material).
 To maintain the records of rework, scrap & salvage.
 To Manage Daily Entry in MIS.
 To display the visual defects on line.
 To impart Training to Quality inspectors.
 Dispatch Documents – Verification, Approval & Distribution.
 Working in Valve Special Testing Processes like – Cryogenic & Fire Safe Test Process.
 Follow the Out-Sourcing NABL Lab Process Activities – Hardenability Test, Micro Structure, etc.

INSPECTION ACTIVITIES (Foundry, Machine Shop & Assembly)

 Preparation of Inspection Plan.


 Pattern – Marking & Inspection.
 Foundry Process Control with Sand Analysis.
 Incoming Raw Material Inspection & Control in Foundry Stage like Scrap, Sand & others.
 Mechanical & Impact Testing.
 Micro Structure Analysis.
 Spectro Analysis.
 First & Second Stage Casting Visual & Dimensional Inspection.
 Casting Final Visual & Dimensional Inspection.
 Machining Process Inspection – All type Valve & Engineering Components.
 Receiving Inspection Control – M/c Components, Ferrous & Nonferrous Components, Non Metallic
Products like Rubbers, etc.
 Final & Valve Assembly Inspection like GV, GLV, CV, BV (2, 3, 4), BfV, KGV, etc.
 NDT – Non Destructive Testing (LPT, MPT, VT).
 Valve Hydro Testing Inspection.
For the Post of Page 3
99444 67132
V.Stalin BE
 Painting & Powder Coating Inspection.
stalin.qm@gmail.com

 Knowledge about the Process of Zinc Coating & Electro Plating.


 Knowledge about the Process of Hardening, Blackening.

OTHER SKILL

 ERP – Implementation Knowledge in all Departments.


 Production Planning – Monthly & Weekly Plan
 Inventory Maintenance & Preservation of Product
 Well known about Stores Control
 Knowledge about the Purchase Activities

Personal Profile:

Fathers Name : M.Veerasamy

Date of Birth : 07/11/1980.

Gender : Male.

Nationality : Indian.

Marital Status : Married.

Linguistic Proficiency : Tamil, English

Permanent Address : #32, Sriram Nagar,


Kurumpapalayam Pirivu,
Madukkarai Market
Coimbatore – 641 105

I V. STALIN hereby declare that the information furnished in the resume is true to the best of my knowledge and belief.

Date: Yours Sincerely

Place: Coimbatore.
V.STALIN

For the Post of Page 4

S-ar putea să vă placă și