Introduction
Project background
Solar resource metrics
Characterization of power output fluctuations
Impact on the system stability
Fault-Ride Through
Part of the IRENA Islands Initiative project to assist islands in the Pacific
Region with their planning for renewable energy integration, especially the
grid stability assessment and identification of specific technology solutions
Objectives
Develop a methodology of assessing the impact of different levels of
variable generation on power quality (focus on frequency stability)
Set up a simulation model to assess the dynamic stability of the system
(pilot project: the system of Palau island has been chosen)
Identify the amount of renewable generation that the system can
accommodate without affecting the power quality
Identify specific technology solutions (like for instance storage) where
required
Next steps:
Validation of dynamic data
Collection and verification of missing data:
Load shedding scheme (incl. tripping times)
Contingency reserve
Voltage/Frequency dependency of loads
Investigate voltage stability and transient stability (contingent on
receiving the necessary dynamic data)
Delivery of the study report including results, conclusions and
recommendations.
Characterization of PV power
output fluctuations
Power fluctuations for four ramp rate intervals of a 1MW PV plant (at STC) and
the existing PV plants in Palau (installed capacity 770 kW)
5.0
1 hour
10 m
4.0
Relative Frequency (%)
1m
10 s
3.0
Palau (1 hour)
2.0
1.0
0.0
-60 -40 -20 0 20 40 60
Power Fluctuation (% of PV rating)
DIgSILENT
1.55E+4
1.30E+4
1.05E+4
8.00E+3
5.50E+3
3.00E+3
0,000 33,20 66,40 99,60 132,8 [-] 166,0
Dispatch Merit Order: Net load in kW
Dispatch Merit Order: Minimum dispatch pow er in kW
Dispatch Merit Order: Maximum dispatch pow er in kW
Dispatch Merit Order: Required dispatch pow er in kW
1.60E+4 800,00
1.40E+4 600,00
1.20E+4 400,00
1.00E+4 200,00
8.00E+3 0,00
6.00E+3 -200,00
0,000 33,20 66,40 99,60 132,8 [-] 166,0
Dispatch Merit Order: Net load in kW Dispatch Merit Order: Renew able generation in kW
Dispatch Merit Order: Required dispatch pow er in kW
DIgSILENT
6,00
5,00
4,00
3,00
2,00
1,00
0,000 33,20 66,40 99,60 132,8 [-] 166,0
Dispatch Merit Order: Number of dispatched generators
6000,00
5000,00
4000,00
3000,00
2000,00
1000,00
0,000 33,20 66,40 99,60 132,8 [-] 166,0
MALAKAL_Site\NIIGATA1: Active Pow er in kW
MALAKAL_Site\NIIGATA2: Active Pow er in kW
1.6E+3
1.2E+3
8.0E+2
4.0E+2
0.0E+0
-4.0E+2
0,000 33,20 66,40 99,60 132,8 [-] 166,0
MALAKAL_Site\MIT13: Active Pow er in kW
MALAKAL_Site\MIT12: Active Pow er in kW
As dynamic data of diesel generators is not available, model has been set up
using standard controllers and parameters.
DIgSILENT
60,50
60,00
59.5 Hz
59,50
59,00 0.702 s
58.475 p.u.
58,50
1st Underf requency Relay @58.2 Hz
58,00
0,00 4,00 8,00 12,00 16,00 [s] 20,00
MALAKAL_Site\PP-MALAKAL-BUS4: Electrical Frequency in p.u. (base: 0,02 )
6,00
5,00
4,00
3,00
2,00
1,00
0,00 4,00 8,00 12,00 16,00 [s] 20,00
MALAKAL_Site\MIT13: Positive-Sequence, Active Pow er in MW
MALAKAL_Site\NIIGATA1: Positive-Sequence, Active Pow er in MW
MALAKAL_Site\NIIGATA2: Positive-Sequence, Active Pow er in MW
8,00
6,00
0.005 s
2.561 MW
4,00
2,00
0,00
-2,00
0,00 4,00 8,00 12,00 16,00 [s] 20,00
Base Load: Total A ctive Pow er in MW
Variable Load: Total Active Pow er in MW
DIgSILENT
2.20E+4
1.80E+4
1.40E+4
1.00E+4
6.00E+3
2.00E+3
0,000 33,20 66,40 99,60 132,8 [-] 166,0
Dispatch Merit Order: Net load in kW
Dispatch Merit Order: Minimum dispatch pow er in kW
Dispatch Merit Order: Maximum dispatch pow er in kW
Dispatch Merit Order: Required dispatch pow er (incl. PV reserve) in kW
1.65E+4 5.0E+3
1.40E+4 3.8E+3
1.15E+4 2.5E+3
9.00E+3 1.3E+3
6.50E+3 0.0E+0
4.00E+3 -1.3E+3
0,000 33,20 66,40 99,60 132,8 [-] 166,0
Summary Grid: General Load, A ctive Pow er in kW Dispatch Merit Order: Renew able generation in kW
Dispatch Merit Order: Required dispatch pow er (incl. PV reserve) in kW
Dispatch Merit Order: Required dispatch pow er (w /o PV reserve) in kW
DIgSILENT
X = 60,000
6,00
5,00
4,00
3.000
3,00
2,00
1,00
0,000 33,20 66,40 99,60 132,8 [-] 166,0
Dispatch Merit Order: Number of dispatched generators
6000,00
5000,00
4000,00
3000,00
2000,00
1000,00
0,000 33,20 66,40 99,60 132,8 [-] 166,0
MALAKAL_Site\NIIGATA1: Active Pow er in kW
MALAKAL_Site\NIIGATA2: Active Pow er in kW
4.0E+3
3.0E+3
2.0E+3
1.0E+3
0.0E+0
-1.0E+3
0,000 33,20 66,40 99,60 132,8 [-] 166,0
AIMELLIK_Site\New Unit-1: Active Pow er in kW
AIMELLIK_Site\New Unit-2: Active Pow er in kW
DIgSILENT
X = -3,500 s X = 20,000 s
60,30
60.000 p.u.
59,90
59,50
59.130 p.u.
59,10
58,70
58,30 Y = 58,200 p.u.
-5,000 2,000 9,000 16,00 23,00 [s] 30,00
MALAKAL_Site\NIIGATA1: Frequency Output in p.u. (base: 0,02 p.u.)
X = -3,500 s X = 20,000 s
4,00
3,00 3.523 MW
2,00
1,00
0.000 MW
0,00
-1,00
-5,000 2,000 9,000 16,00 23,00 [s] 30,00
Total PV Generation: Total PV Generation in MW
X = -3,500 s X = 20,000 s
6,25
5,00 4.646 MW
3.432 MW 3.743 MW
3,75
2,50 2.000 MW
1.354 MW
1,25 0.800 MW
0,00
-5,000 2,000 9,000 16,00 23,00 [s] 30,00
MALAKAL_Site\NIIGATA1: Positive-Sequence, Active Pow er in MW
MALAKAL_Site\NIIGATA2: Positive-Sequence, Active Pow er in MW
MALAKAL_Site\WA RT1: Positive-Sequence, A ctive Pow er in MW
X = -3,500 s X = 20,000 s
9800,00
9700,00
9610.513 kW
9600,00 9566.671 kW
9500,00
9400,00
9300,00
-5,000 2,000 9,000 16,00 23,00 [s] 30,00
Summary Grid: General Load, A ctive Pow er in kW
Frequency stability
DIgSILENT
2.00E+4
1.60E+4
1.20E+4
8.00E+3
4.00E+3
0.00E+0
0,000 33,20 66,40 99,60 132,8 [-] 166,0
Dispatch Merit Order: Net load in kW
Dispatch Merit Order: Minimum dispatch pow er in kW
Dispatch Merit Order: Maximum dispatch pow er in kW
Dispatch Merit Order: Required dispatch pow er (incl. PV reserve) in kW
1.60E+4 1.0E+4
1.30E+4 7.5E+3
1.00E+4 5.0E+3
7.00E+3 2.5E+3
4.00E+3 0.0E+0
1.00E+3 -2.5E+3
0,000 33,20 66,40 99,60 132,8 [-] 166,0
Dispatch Merit Order: Net load in kW Dispatch Merit Order: Renew able generation in kW
Dispatch Merit Order: Required dispatch pow er (incl. PV reserve) in kW
Dispatch Merit Order: Required dispatch pow er (w /o PV reserve) in kW
DIgSILENT
5,00
4,00
3,00
2,00
1,00
0,00
0,000 33,20 66,40 99,60 132,8 [-] 166,0
Dispatch Merit Order: Number of dispatched generators
6000,00
5000,00
4000,00
3000,00
2000,00
1000,00
0,000 33,20 66,40 99,60 132,8 [-] 166,0
MALAKAL_Site\NIIGATA1: Active Pow er in kW
MALAKAL_Site\NIIGATA2: Active Pow er in kW
4.0E+3
3.0E+3
2.0E+3
1.0E+3
0.0E+0
-1.0E+3
0,000 33,20 66,40 99,60 132,8 [-] 166,0
AIMELLIK_Site\New Unit-1: Active Pow er in kW
2.0E+3
1.0E+3
0.0E+0
-1.0E+3
-2.0E+3
-3.0E+3
0,000 33,20 66,40 99,60 132,8 [-] 166,0
Storage: Active Pow er in kW
Storage technologies
Freewheels (discharge time ~ seconds to few minutes, power rating <
1MW)
Li-Ion and Lead-Acid Batteries (discharge time ~ minutes, power rating
< 1MW)
DIgSILENT
X = -2,000 s X = 20,000 s
60,30
60.000 p.u.
59,80
59,30
58.993 p.u.
58,80
58,30 58.200 p.u. 58.200 p.u. Y = 58,200 p.u.
57,80
-5,000 2,000 9,000 16,00 23,00 [s] 30,00
MALAKAL_Site\NIIGATA1: Frequency Output in p.u. (base: 0,02 p.u.)
X = -2,000 s X = 20,000 s
9,00
8,00
7.321 MW
7,00
6,00
5.246 MW
5,00
4,00
-5,000 2,000 9,000 16,00 23,00 [s] 30,00
Total PV Generation: Total PV Generation in MW
X = -2,000 s X = 20,000 s
5,00
4,00 3.560 MW
3,00
2.132 MW
2,00 1.441 MW
1,00 0.800 MW
0,00
-5,000 2,000 9,000 16,00 23,00 [s] 30,00
MALAKAL_Site\NIIGATA1: Positive-Sequence, Active Pow er in MW
MALAKAL_Site\WA RT1: Positive-Sequence, A ctive Pow er in MW
X = -2,000 s X = 20,000 s
1.01E+4
10094.035 kW 10086.038 kW
1.01E+4
1.00E+4
9.96E+3
9.91E+3
9.86E+3
-5,000 2,000 9,000 16,00 23,00 [s] 30,00
Summary Grid: General Load, A ctive Pow er in kW
DIgSILENT
2.00E+4
1.60E+4
1.20E+4
8.00E+3
4.00E+3
0.00E+0
0,000 33,20 66,40 99,60 132,8 [-] 166,0
Dispatch Merit Order: Net load in kW
Dispatch Merit Order: Minimum dispatch pow er in kW
Dispatch Merit Order: Maximum dispatch pow er in kW
Dispatch Merit Order: Required dispatch pow er in kW
1.60E+4 1.0E+4
1.30E+4 7.5E+3
1.00E+4 5.0E+3
7.00E+3 2.5E+3
4.00E+3 0.0E+0
1.00E+3 -2.5E+3
0,000 33,20 66,40 99,60 132,8 [-] 166,0
Dispatch Merit Order: Net load in kW Dispatch Merit Order: Renew able generation in kW
Dispatch Merit Order: Required dispatch pow er in kW
DIgSILENT
5,00
4,00
3,00
2,00
1,00
0,00
0,000 33,20 66,40 99,60 132,8 [-] 166,0
Dispatch Merit Order: Number of dispatched generators
5.0E+3
3.8E+3
2.5E+3
1.3E+3
0.0E+0
-1.3E+3
0,000 33,20 66,40 99,60 132,8 [-] 166,0
MALAKAL_Site\NIIGATA1: Active Pow er in kW
MALAKAL_Site\NIIGATA2: Active Pow er in kW
4.0E+3
3.0E+3
2.0E+3
1.0E+3
0.0E+0
-1.0E+3
0,000 33,20 66,40 99,60 132,8 [-] 166,0
AIMELLIK_Site\New Unit-1: Active Pow er in kW
2.0E+3
1.0E+3
-2.3E-1..
-1.0E+3
-2.0E+3
-3.0E+3
0,000 33,20 66,40 99,60 132,8 [-] 166,0
Storage: Active Pow er in kW
DIgSILENT
X = -2,000 s X = 25,000 s
60,20
60.001 p.u.
59,90
59,60
59,30 59.158 p.u.
59,00
58,70
-5,000 2,000 9,000 16,00 23,00 [s] 30,00
MALAKAL_Site\NIIGATA1: Frequency Output in p.u. (base: 0,02 p.u.)
X = -2,000 s X = 25,000 s
7,80
7.606 MW
7,50
7,20
6,90
6,60
6.410 MW
6,30
-5,000 2,000 9,000 16,00 23,00 [s] 30,00
Total PV Generation: Total PV Generation in MW
X = -2,000 s X = 25,000 s
4,00
3,70 3.841 MW
3,40
3,10
2,80 2.652 MW
2,50
-5,000 2,000 9,000 16,00 23,00 [s] 30,00
MALAKAL_Site\NIIGATA1: Positive-Sequence, Active Pow er in MW
X = -2,000 s X = 25,000 s
1.01E+4
10092.506 kW 10084.094 kW
1.01E+4
1.00E+4
9.96E+3
9.91E+3
9.86E+3
-5,000 2,000 9,000 16,00 23,00 [s] 30,00
Summary Grid: General Load, A ctive Pow er in kW
After a Fault
DIgSILENT
60,60
60,40
60,20
60,00
59,80
59,60
0,00 2,00 4,00 6,00 8,00 [s] 10,00
MALAKAL_Site\NIIGATA1: Frequency Output in p.u. (base: 0,02 p.u.)
1,25
1,00
0,75
0,50
0,25
0,00
0,00 2,00 4,00 6,00 8,00 [s] 10,00
MALAKAL_Site\NIIGATA1: Terminal Voltage in p.u.
MALAKAL_Site\PP-MALAKAL-BUS4: Voltage, Magnitude in p.u.
F-AIRAI-10: Voltage, Magnitude in p.u.
1,00
0,80
0,60
0,40
0,20
0,00
0,00 2,00 4,00 6,00 8,00 [s] 10,00
Total PV Generation: Total PV Generation in MW
DIgSILENT
60,90
60,60
60,30
60,00
59,70
59,40
0,00 2,00 4,00 6,00 8,00 [s] 10,00
MALAKAL_Site\NIIGATA1: Frequency Output in p.u. (base: 0,02 p.u.)
MALAKAL_Site\NIIGATA1: Frequency Output in p.u. (base: 0,02 p.u.)
1,20
0,90
0,60
0,30
0,00
-0,30
0,00 2,00 4,00 6,00 8,00 [s] 10,00
MALAKAL_Site\NIIGATA1: Terminal Voltage in p.u.
MALAKAL_Site\PP-MALAKAL-BUS4: Voltage, Magnitude in p.u.
F-AIRAI-10: Voltage, Magnitude in p.u.
5,00
4,00
3,00
2,00
1,00
0,00
0,00 2,00 4,00 6,00 8,00 [s] 10,00
Total PV Generation: Total PV Generation in MW
MALAKAL_Site\NIIGATA1: Positive-Sequence, Active Pow er in MW
MALAKAL_Site\WA RT1: Positive-Sequence, A ctive Pow er in MW
DIgSILENT
61,50
61,00
60,50
60,00
59,50
59,00
0,00 2,00 4,00 6,00 8,00 [s] 10,00
MALAKAL_Site\NIIGATA1: Frequency (considering Storage)
MALAKAL_Site\NIIGATA1: Frequency (w ithout Storage)
1,30
1,00
0,70
0,40
0,10
-0,20
0,00 2,00 4,00 6,00 8,00 [s] 10,00
MALAKAL_Site\NIIGATA1: Terminal Voltage in p.u.
MALAKAL_Site\PP-MALAKAL-BUS4: Voltage, Magnitude in p.u.
F-AIRAI-10: Voltage, Magnitude in p.u.
10,00
7,50
5,00
2,50
0,00
-2,50
0,00 2,00 4,00 6,00 8,00 [s] 10,00
Total PV Generation: Total PV Generation in MW
MALAKAL_Site\NIIGATA1: Positive-Sequence, Active Pow er in MW