Sunteți pe pagina 1din 2

TECHNICAL DATA SHEET

FIRE WATER STORAGE TANK TK-2501

Document No. Sheet No


Client AZIKEL PETROLEUM LIMITED
MUCOG-1910502-FF-DS-001 1 of 2
Consultant MUC OIL & GAS ENGINEERING CONSULTANCY

Project AZIKEL PETROLEUM LIMITED 12,000 BPSD REFINING COMPLEX


0 10/11/2019 Issued For Tender NV MA IB
A 15/10/2019 Issued For Client Review NV MA IB
Project No. 1910502
Rev Date Description Prepared Checked Approved
1 GENERAL DATA 38 PROCESS DATA
2 Tag Number TK-2501 39 Products Fresh Water
3 Service Fire Water Storage 40 Specific Gravity 1
4 Number of Tanks (Nos) 1 41 Viscosity ( Cst ) 1 @ 20 oC
5 Dimensions (m) * Diameter x Height 24 x 20 (Note 18) 42 Flash Point (ºc) < -28
6 Roof Type Fixed Cone Roof 43 Vapour Pressure (Kpa) 7.4
7 Geometric Capacity (m³) 9047 44 Operating Pressure Atmospheric
3
8 Storage Capacity (m ) 8300* (Note 18) 45 Internal Design Pressure (Kpa) ATM + Full of Liquid
9 46 External Design Pressure (Kpa) N/A
10 DESIGN DATA 47 Design Temperature Max./Min.(ºc) 80 / 12
11 Design & Construction Code API-650, Latest Edition 48 Operating Temperature Ambient
12 Shell Design Method One Foot Method Variable-Design-Point 49 Design Liquid Sp. Gravity 1
13 Foundation Type * 50 Design Liquid Level (mm) Full Height
14 Minimum Thickness(mm) Shell- Note 15 Roof- * Bottom- Note 15 51 Filling Rate / Emptying Rate (m³/hr) */*
15 Corrosion Allowance Shell- 3 1.5 Roof- 1.5 Bottom- 1.5 52 Tank Refrigeration Required Not Required
16 Joint Efficiency As per Code 53 Heating Required Not Required
17 Tank Bottom Type Cone Down with Center Sump 54 Blanketing Required Not Required
18 Slope 1 : 100 Flat 55 Tank Mixing Required Not Required
19 Tank Roof Cone Dome 56 Tank Gauging Required Not Required
20 Shell Required Not Required 57 Leak Detection System Required Not Required
Insulation
21 Roof Required Not Required 58 Cathodic Protection Required Not Required
22 Stiffening Rings As Per Code Not Required 59 H2S Service Required Not Required
23 REMARKS 60 High High *
24 61 High *
Tank Liquid Level
25 62 Low *
26 63 Low Low *
27 SITE DATA 64 PAINTING, INSPECTION & TESTING
28 Site Conditions Refer Site Data Sheet 65 Painting (External Shell
As Per Project Painting Specification
29 Wind Speed 40 m/sec, 3 sec guest. 66 / Internal) Bottom & Roof
30 Seismic Zone Zone 2A 67 Hydro Test Level Design Liquid Level
31 WEIGHT 68 Radiography As Per Code Not Required
32 Total Empty Weight (MT) * 69 Non Destructive Testing (NDT) As Per Code Not Required
33 Operating Weight (MT) * 70 Galvanizing Of Structural items
Required Not Required
34 Hydraulic Test Weight (Full of Water) * 71 (Platform, Stair way & railing)
35 Insulation (MT) * 72 Hot Dip Galvanising for Anchor Bolts Required Not Required
36 73 Potable Water Rinse After Hydrotest Required Not Required
37 74 PHWT / Stress Relieving As Per Code Not Required
75 ACCESSORIES
76 Item Remarks 116 Item Remarks
77 Spiral Stairway Double Stringer Type 117 Side Entry Mixer
78 Tank Earthing Min. 4 no's Earthing lugs 118 Jet Mixer
79 Pipe Support Cleat 119 Level Switch
80 Lighting / Cable Support 120 Emergency Vent As per Code
81 Nitrogen Blanketing 121 PVRV
82 Foam System (NFPA) 122 Floating Suction
83 Clean Out Door 123 Level Transmitter As per Nozzle Index
84 Name Plate 124 Gauge Hatch (Spark Proof)
85 Landing Platform 125 Stilling Well (s) As per Nozzle Index
86 Flame Arrestor 126 Intermediate Platform Every 6m
87 Vortex Breaker Refer Nozzle Index 127 Rolling Ladder
88 Inlet Diffuser 128 All Around Roof Handrail
89 Water draw off sump 1 no's , As per Code 129 Suction Heater
90 Gauger's Platform 130 Drip Ring
106 MATERIAL OF CONSTRUCTION
107 Shell Plates A 36 131 Bolts A 193 Gr B7(Galv)
108 Bottom / annular Plates A 36 132 Nuts A 194 Gr 2H (Galv)
109 Bottom Sketch Plate A 36 133 Welding Fittings A 234 WPB
110 Roof Plates A 36 134 Gaskets SS 316 Spiral wound with graphite wire mesh
111 Shell Nozzles A 106 Gr.B 135 Insulation Supports Not Applicable
112 Shell Flanges A105 136 Stairs/Handrails/Platform A 36
113 Internal Piping A 106 Gr.B 137 Earthing Boss SS 316
114 Fittings A 234 WPB / A 105 138 Internal Piping A 106 Gr.B
115 Nozzles flanges A 105 139 RF. Pads. Shell/Roof A 36
116 Roof Flanges A 105 140 Bolts & Nuts (Internal) SS 316
117 Structural shapes A 36 141 Name Plate SS 316
118 Roof support str. A 36 142 Manhole Neck & Fab. Neck Shell/Roof A 36 or Equivalent
119 Heating Coils N/A 143 Anchor bolts A 36
120 IFR Pontoon / legs / Skin N/A 144 Cleats A 36
121
120 REMARKS
119
118
117

MUCOG-1910502-FF-DS-001 FIRE WATER STORAGE TANK TK-2501 Page1 of 2


TECHNICAL DATA SHEET

FIRE WATER STORAGE TANK TK-2501

Document No. Sheet No


Client AZIKEL PETROLEUM LIMITED
MUCOG-1910502-FF-DS-001 2 of 2
Consultant MUC OIL & GAS ENGINEERING CONSULTANCY

Project AZIKEL PETROLEUM LIMITED 12,000 BPSD REFINING COMPLEX


0 10/11/2019 Issued For Tender NV MA IB
A 15/10/2019 Issued For Client Review NV MA IB
Project No. 1910502
Rev Date Description Prepared Checked Approved
1 ROOF DESIGN
2 FIXED ROOF DESIGN
3 Open Top Yes No 11 Thickness *
4 Fixed Roof Type Fixed Cone Roof 12 Snow Load N/A
5 Roof Support Columns Required Not Required 13 Column Lateral Load N/A
6 Cone Slope As per Code 14 Normal Venting Device *
7 Dome or Umbrella Radius N/A 15 Emergency Venting Devices *
8 Weld Joints Lap Butt Others 16 Seal Weld Underside of Lap Joints Yes No
9 Gas - Tight Yes No As per code 17 Seal Weld Underside of Wind Girder
Yes No
10 Joint Efficiency As per Code 18 Joints
19 NOZZLE INDEX
20
Sl. No. Nozzle No. Service Qty Size (in) Rating / SCH Flange Type/ Facing Remarks
21
22 1 N1 Inlet 1 8 150# WNRF With Internal Float valve
23 2 N2 Outlet 1 18 150# WNRF With Vortex Breaker
24 3 N3 Drain 1 4 150# WNRF With Internal Flange & Piping to center sump
25 4 N4 A/B Level Switch - Low / High 2 2 150# WNRF
26 5 N5 Recirculation 1 12 150# WNRF With Deflector Plate
27 6 N6 Spare Nozzle 1 2 150# WNRF With Blind Flange
28 7 N7 Over Flow 1 8 150# WNRF With Pipe Extend to Storm Water Drain
29 8 MH-1 Shell Manhole 1 30 As per code As per code With Hing & Davit
30 9
31 10
32 13
33
34 ROOF NOZZLE
35 1 R1 Level Transmitter 1 4* 150# WNRF
36 2 R2 Vent 1 24* * * Free Vent with Bird Screen
37 3 MH-2 Roof Manhole 1 24 As per code As per code
38 4
39 5
40 6
41 7
42 8
43 9
44 INTERNAL FLOATING ROOF NOZZLES (N/A)
45
46
47
48
49
50
51
52 NOTES
53 * To be provided / confirmed during detailed engineering.
54 ** - Applicable
55 - Not Applicable
56 1 Contractor shall provide bolts & gasket for all manhole and nozzles with blind flange.
57 2 Potential sloshing of liquid damage due to seismic activity shall be taking in to consideration for the tank height during detailed engineering.
58 3 Flange Gasket face shall have serrated finish with concentric groove of 125 AARH finish
59 4 Manhole necks & nozzle necks 12" NPS & above shall be fabricated from plate and Long seams shall be 100% Radiographed
60 5 Any tank nozzle not connected to the piping system or appurtenance shall be closed with blind flange.
61 6 Flange dimension shall conform to ASME B16.5 upto 24" NPS except manhole (Manhole as per API 650) flange for nozzle above 24" shall conform to ASME B16.47
62 (Series-A Class 150) unless specified otherwise.
63 8 All requirements mentioned in the Project Technical Specification for Storage Tanks shall be complied.
64 9 Tank Calibration shall be performed in accordance with API- MPMS
65 10 Washers shall be provided under all nuts and bolt heads
66 11 All Structural items shall include 1.5mm Corrosion Allowance.
67 12 All attachments on the Tank/Roof Wall shall be same as that of the Tank/Roof material
68 13 Tank Fabricator to furnish and install 2" NB conduits for instrument cables
69 14 Unless otherwise specified the Grade of Stainless steel used shall be 316L
70 15 The minimum shell plate/bottom plate thickness shall be 8mm or code stipulated thickness which ever is maximum to ensure safe mechanical integrity of the tanks
71 16 The minimum wind girder plate thickness shall be 8 mm .
72 17 100 % redundancy shall be considered for the vents.
73 18 The provided dimension is preliminary only, It shall be finalized during detailed engineering based on the Fire Water Demand calculation.
74 19 Overflow nozzle to be provided with external discharge pipe till the bottom of the tank.
75