Documente Academic
Documente Profesional
Documente Cultură
Home
INSTRUMENTATION & CONTROL
Instrumentation
Sensor & Transducer
Calibration
FOUNDATION™ Fieldbus
COMPRESSOR CONTROL SYSTEM
VIBRATION
DCS
CONTROL SYSTEM
Formulas(I&C)
control valve
E&I MS
PLC
ELECTRICAL & POWER
Electrical standard
Electrical Engineering
E&I MS
E&I Construction
PLUMBING
HVAC
TELECOM RF
GSM RF Optimization
3G/WCDMA RF Optimization
LTE RF Optimization
CIVIL ENGG
E&I QA QC
MECHANICAL
ARAMCO WPR
https://paktechpoint.com/instrumentation-loop-team-responsibilities/ 1/9
4/5/2020 INSTRUMENTATION LOOP TEAM RESPONSIBILITIES - PAKTECHPOINT
PAKTECHPOINT
INSTRUMENTATION FOLLOW:
Home
INSTRUMENTATION & CONTROL
Instrumentation
FOUNDATION™ Fieldbus
RESPONSIBILITIES
To search type and hit enter
COMPRESSOR CONTROL SYSTEM
VIBRATION
DCS
BY · PUBLISHED · UPDATED
CONTROL SYSTEM
Main keywords for this article are INSTRUMENTATION LOOP TEAM
Formulas(I&C)
RESPONSIBILITIES,
control valve loop team responsibilities, SIS function properly,
E&IInstrumentation
MS Engineer Responsibilities.
PLC
ELECTRICAL & POWER
Electrical standard
Electrical Engineering
E&I MS
E&I Construction
PLUMBING
https://paktechpoint.com/instrumentation-loop-team-responsibilities/ 2/9
4/5/2020 INSTRUMENTATION LOOP TEAM RESPONSIBILITIES - PAKTECHPOINT
HVAC
CATEGORIES
TELECOM RF
GSM RF Optimization CIVIL ENGG.
3G/WCDMA RF Optimization
LTE RF Optimization CONTROL SYSTEM
CIVIL ENGG
E&I QA QC E&I CONSTRUCTION
MECHANICAL
ARAMCO WPR E&I QA QC
International Standards & Codes
Cathodic Protection ELECTRICAL
ELECTRONICS
HVAC
INSTRUMENTATION LOOP TEAM RESPONSIBILITIES, loop team responsibilities
INSTRUMENTATION
Control Room PIB (Process Interface Building) Inside Person Measurement & Instrumentation
Isolate power from field device from the input/output electronics for new MECHANICAL
installations and ensure that the loop power fuses are removed or
PAINTING
disconnects in the CBJB or ICJB are open.
Reconnect power for the field device as required. Q/As CIVIL
Verify the instrument tag number and the 1/0 point on the instrument
schedule. Q/As Instrumentation
Assist the outside person, as required, in locating the instrument in the field.
https://paktechpoint.com/instrumentation-loop-team-responsibilities/ 3/9
4/5/2020 INSTRUMENTATION LOOP TEAM RESPONSIBILITIES - PAKTECHPOINT
Verify the instruments are terminated correctly (loop powered or field STRUCTURAL
powered).
Verify correct size and install instrument power fuse as required. TELECOM RF
Communicate the instrument range and fail safe position to the outside
Uncategorized
person in the field.
Stroke Analog and Digital outputs for field verification by the outside person VIDEOES
in the field.
Verify the correct fail action and operation of AO’s & DO’s according to the WORK PERMIT SYSTEM
work and distribute to the appropriate functions. PAKTECHPOINT on ARAMCO STANDARD SAES-P-
104 Wiring Methods and Materials
https://paktechpoint.com/instrumentation-loop-team-responsibilities/ 4/9
4/5/2020 INSTRUMENTATION LOOP TEAM RESPONSIBILITIES - PAKTECHPOINT
Use the instrument schedule or loop checklist to document each loop as it is Conditions Of SubContract Agreement -
verified. PAKTECHPOINT on GUARANTEES –
Document problems and changes as they are completed. SUBCONTRACT AGREEMENT
When the job is complete, deliver the completed documentation to the person
in charge.
SEARCH WEBSITE
1. Positively identify instruments in the field using the P&ID, IPCS graphics,
or instrument location plan. RECENT POSTS
2. Visually inspect instrument installation. Correct or record deficiencies (i. e.,
Receptacle Electrical Installation Details
conduit covers, plugs, flow direction, etc.).
3. Verify tag number and correct 1/0 number for the instrument.
4. Connect communicator and monitor power up.
5. Configure the instrument with the tag number and range information.
6. Verify fail direction of the instrument.
7. Perform zero/span trim to the IPCS graphics.
8. For pressure sensing devices, function check by driving instrument mid scale
by applying pressure (if possible) or with communicator or simulator.
9. Verify valve position, operation, and fail safe condition.
10. Verify motor I/O.
11. Electrical responsible for verifying proper motor operation and proper
rotation.
12. Perform minor troubleshooting tasks in the field (10-15 minutes) and
communicate all problems with inside person. If the problem cannot be
resolved, this item will be put on the problem punch list.
https://paktechpoint.com/instrumentation-loop-team-responsibilities/ 5/9
4/5/2020 INSTRUMENTATION LOOP TEAM RESPONSIBILITIES - PAKTECHPOINT
13. Mark the instrument with green tape when complete if everything is correct.
14. Mark instruments with red tape that need to be worked on.
15. Work with operations to verify (SIS) and SIS function properly.
paktechpoint.com
Share to Friends
Instrumentation Test Instrumentation Loop Test Instrument Loop Folders -
Procedure - Instrumentation Loop Checking Loop Check Preparation
Loops In "INSTRUMENTATION" In "INSTRUMENTATION"
In "INSTRUMENTATION"
Tags: Instrumentation
Methods of Weighing –
Load Cell System –
Instrumentation
https://paktechpoint.com/instrumentation-loop-team-responsibilities/ 6/9
4/5/2020 INSTRUMENTATION LOOP TEAM RESPONSIBILITIES - PAKTECHPOINT
LEAVE A REPLY
Comment
Name * Email *
Website
Post Comment
https://paktechpoint.com/instrumentation-loop-team-responsibilities/ 7/9
4/5/2020 INSTRUMENTATION LOOP TEAM RESPONSIBILITIES - PAKTECHPOINT
Home
INSTRUMENTATION & CONTROL
Instrumentation
Sensor & Transducer
Calibration
FOUNDATION™ Fieldbus
COMPRESSOR CONTROL SYSTEM
VIBRATION
DCS
CONTROL SYSTEM
Formulas(I&C)
https://paktechpoint.com/instrumentation-loop-team-responsibilities/ 8/9
4/5/2020 INSTRUMENTATION LOOP TEAM RESPONSIBILITIES - PAKTECHPOINT
control valve
E&I MS
PLC
ELECTRICAL & POWER
Electrical standard
Electrical Engineering
E&I MS
E&I Construction
PLUMBING
HVAC
TELECOM RF
GSM RF Optimization
3G/WCDMA RF Optimization
LTE RF Optimization
CIVIL ENGG
E&I QA QC
MECHANICAL
ARAMCO WPR
International Standards & Codes
Cathodic Protection
PAKTECHPOINT © 2020. All Rights Reserved.
Powered by - Designed with the Hueman theme
https://paktechpoint.com/instrumentation-loop-team-responsibilities/ 9/9