REFERENCE
ITB 3.3(g)(2)(ii)(b) Works to be specified in layout plan8 for
Interception and Diversion Works:
1. Diversion Structure
2. Intercepting Sewer
and/orSewerage Network:
1. Primary and Trunk sewerage network
2. Secondary and collector lines on the sewerage network;
3. Sewage Pumping Station(s);
4. Inspection chambers and manholes;
5. Infrastructure, if any, proposed for reuse of treated effluent
ITB 3.3(h)(4)(ii)(b) Language capabilities for Bidder‘s Personnel: English
ITB 3.3(h)(4)(ii)(b), List of Key Staff to be deployed by the Operator for each town project
3.3(h)(5) (Danapur, Phulwarishariff & Fatuha) during the Design buildservices for
STP and Sewerage Network and/or Interception & Diversion Works as
stipulated in SCC 8.3 is reproduced here.