NO. MACAM PEKERJAAN PESAWAT PEMELIHARAAN HARI KERJA 1 Orientasi Hangar 3 UNIT TBW A330-300 Maintenance 1 Hari 2 Replace Seal Upstop at RH wing slat#5 A330-300 Maintenance 1 Hari
3 Remove Light Corrossion RCC Eng #2 A330-300 Maintenance 1 Hari
4 Replace Bonding at External Power Cable A330-300 Maintenance 1 Hari
5 Replace Filter Element at FWD Cargo A330-300 Maintenance 1 Hari 6 Replace CMC 1 A330-300 Maintenance 1 Hari 7 Remove Panel FWD Cargo A330-300 Maintenance 1 Hari
8 Remove Belly Fairing Panel at Rear Cargo A330-300 Maintenance 1 Hari
Replace Batteries 1 amd 2 At Avionic 9 A330-300 Maintenance 1 Hari Compartment 10 Replace Filter FWD Recirculation Fan A330-300 Maintenance 1 Hari
11 Replace Localizer Antenna A330-300 Maintenance 1 Hari
12 Replace Glidescope Antenna A330-300 Maintenance 1 Hari
13 A330-300 Maintenance 1 Hari
14 Install Battery 3 at Bulk Cargo A330-300 Maintenance 1 Hari
15 Install Belly Fairing Panel at Rear Cargo A330-300 Maintenance 2 Hari
16 Replace Trim Air Duct A330-300 Maintenance 1 Hari
17 Install Cockpit Voice Recorder A330-300 Maintenance 1 Hari
18 Install Arm Wiper A330-300 Maintenance 1 Hari
19 Remove Ice Detector A330-300 Maintenance 1 Hari 20 Remove Fan Extract at FWD Cargo A330-300 Maintenance 1 Hari
21 Remove Thermostat Control A330-300 Maintenance 1 Hari
22 Remove Actuator at RH Ram Air Inlet Door A330-300 Maintenance 1 Hari
23 Replace Bulb Dome Light at Avionic Compartment A330-300 Maintenance 1 Hari
24 Remove DU Video at Cockpit A330-300 Maintenance 1 Hari
25 Install Connector Heater Pitot A330-300 Maintenance 1 Hari
Replace Terminal Engine Generator Turbine at 26 A330-300 Maintenance 1 Hari Engine 2 Replace Sensor Brake Temperature Monitoring 27 A330-300 Maintenance 1 Hari Unit
28 Run Test Aircraft GARUDA PK-GPX to Customer A330-300 Maintenance 2 Hari
29 Realise Aircraft GARUDA PK-GPX to Customer A330-300 Maintenance 1 Hari
Remove Connector Fire Extinguisher 1 dan 2 at
30 A330-300 Maintenance 1 Hari Engine 2 31 Remove Panel Slat at Left Wing A330-300 Maintenance 1 Hari 32 Remove Floor Panel at AFT Cargo A330-300 Maintenance 1 Hari
Proses pembuatan laporan hingga dapat Approval
33 - - 6 Hari dari PT GMF AEROASIA Tbk. Tangerang, 31 Agustus 2019 Mengetahui kebenaran Rekapitulasi ini sesuai Dengan aslinya
SEKRETARIS KEGIATAN PRAKTIKAN
ARYA DIAN D., S.Psi., S.T., M.T. IRFAN MADJID WARDHANA