Documente Academic
Documente Profesional
Documente Cultură
PROYECTO DE AULA
UNIVERSIDAD DE LA COSTA
BARRANQUILLA -- 2017
1. PRELIMINARES
CAPITULO ITEM - DESCRIPCIÓN UNIDAD % DESPERDICIO VALOR UNITARIO VR. SUBTOTAL
1.1 Descapote m2 $ 471,831.25 $481,268
1.2 Replanteo m2 1.02 $ 91,500.00 $93,330
1.3 Cerramiento m2 $ 563,494.40 $574,764
TOTAL $1,149,362
2. EXCAVACIONES
CAPITULO ITEM - DESCRIPCIÓN UNIDAD % DESPERDICIO VALOR UNITARIO VR. SUBTOTAL
2.1 Zapata m3 $ 373,665.56 $381,139
1.02
2.2 Viga de Amarre m3 $ 2,452,413.03 $2,501,461
TOTAL $2,882,600
3. CIMENTACIÓN
CAPITULO ITEM - DESCRIPCIÓN UNIDAD % DESPERDICIO VALOR UNITARIO VR. SUBTOTAL
3.1 Zapata m3 $ 36,934,554.91 $ 37,673,246
3.2 Pedestal m3 1.02 $ 1,010,216.04 $ 1,030,420.36
3.3 Viga de Amarre m $ 11,464,260.84 $ 11,693,546.05
TOTAL $50,397,212
4. ESTRUCTURA
CAPITULO ITEM - DESCRIPCIÓN UNIDAD % DESPERDICIO VALOR UNITARIO VR. SUBTOTAL
4.1 Columnas m3 $ 11,667,192 $ 11,900,536
4.2 Vigas ml 1.02 $ 10,107,257.29 $ 10,309,402
4.3 Losa m3 $ 21,308,758 $ 21,734,933
TOTAL $43,944,872
5. MAMPOSTERIA
CAPITULO ITEM - DESCRIPCIÓN UNIDAD % DESPERDICIO VALOR UNITARIO VR. SUBTOTAL
5.1 Muro m2 $ 30,971.55 $ 31,591
1.02
5.2 Pañete m2 $ 8,747.37 $ 8,922
TOTAL $40,513
5.1 MAPOSTERIA
CAPITULO ITEM - DESCRIPCIÓN UNIDAD CANTIDAD % DESPERDICIO VALOR UNITARIO VR. SUBTOTAL
5.1.1 muro m2 1 1.02 $ 22,398.58 $ 22,846.55
5.1.2 mano de obra h.h 0.5 1 $ 16,250 $ 8,125.00
total $ 30,971.55
5.2 PAÑETE (m2)
CAPITULO ITEM - DESCRIPCIÓN UNIDAD CANTIDAD % DESPERDICIO VALOR UNITARIO VR. SUBTOTAL
5.2.1 mortero m3 0.0024 1.02 $ 254,234.17 $ 622.37
5.2.2 mano de obra h.h 0.5 1 $ 16,250 $ 8,125.00
total $ 8,747.37
DETALLE DE EXCAVACION ZAPATA
ITEM CANTIDAD ANCHO LARGO PROFUNDIDAD TOTAL M3
ZAPATA DE 1.4 X 1.4 2 1.4 1.4 1.5 5.88
ZAPATA DE 1 X 1 18 1 1 1.5 27
32.88
DETALLE DE EXCAVACION VIGA AMARRE
ITEM CANTIDAD ANCHO LARGO PROFUNDIDAD TOTAL M3
VIGA 0.25 X 0.30 1 0.3 182.84 1.5 82.278
82.278
DETALLE DE CIMENTACION ZAPATA
ITEM CANTIDAD ANCHO LARGO ESPESOR TOTAL M3
ZAPATA DE 1.4 X 1.4 3 1.4 1.4 0.3 1.764
ZAPATA DE 1 X 1 18 1 1 0.3 5.4
7.164
DETALLE DE CIMENTCION DE PEDESTAL
ITEM CANTIDAD LARGO ANCHO ALTO TOTAL M3
PEDESTAL 21 0.45 0.45 0.6 2.5515
2.5515
DETALLE DE CIMENTACION VIGA AMARRE (TOTAL)
ITEM CANTIDAD ANCHO LARGO ALTO TOTAL M3
VIGA 0.25 X 0.30 1 0.3 182.84 0.25 13.713
13.713
DETALLE DE COLUMNA
ITEM CANTIDAD ANCHO LARGO ALTO TOTAL M3
COLUMNA 1 0.3 0.3 5.72 0.5148
0.5148
DETALLE DE VOLUMEN VIGA AMARRE (M3)
ITEM CANTIDAD ANCHO LARGO ALTO TOTAL M3
VIGA 0.25 X 0.30 1 0.3 6.3 0.25 0.4725
0.4725
DETALLE DE ACERO DE VIGA DE AMARRE (X M3 DE VIGA)
ITEM CANTIDAD LARGO PESO KG/M TOTAL Kg/M3
ACERO 5/8" 4 6.15 1.55 80.70
ACERO 3/8" 32 0.8 0.56 30.71
111.40
DETALLE DE ACERO DE COLUMNA (X M3 DE VIGA)
ITEM CANTIDAD LARGO PESO KG/M TOTAL Kg/M3
ACERO 5/8" 4 10.87 1.55 130.91
ACERO 3/8" 50 1 0.56 54.57
ACERO 1/2" 2 10.87 0.996 42.06
DETALLE DE ACERO DE ZAPATA DE 1.4 X 1.4
ITEM CANTIDAD LARGO PESO KG/M TOTAL Kg
ACERO 5/8" 14 1.51 1.55 32.767
32.767
DETALLE DE ACERO DE ZAPATA DE 1 X 1
ITEM CANTIDAD LARGO PESO KG/M TOTAL Kg
ACERO 5/8" 14 1.11 1.55 24.087
24.087
1.1.1 DESCAPOTE (M2)
CAPITULO ITEM - DESCRIPCIÓN UNIDAD CANTIDAD % DESPERDICIO VALOR UNITARIO VR. SUBTOTAL
1.1.1.2 M. de Obra H.h 5 1 $ 18,873.25 $ 94,366.25
TOTAL $ 94,366.25
1.1.2 REPLANTEO
CAPITULO ITEM - DESCRIPCIÓN UNIDAD CANTIDAD % DESPERDICIO VALOR UNITARIO VR. SUBTOTAL
1.1.2.1 Topografia Dia 1 1 $ 91,500.00 $ 91,500.00
TOTAL $ 91,500.00
3.2.1 ACERO-(Kg)
CAPITULO ITEM - DESCRIPCIÓN UNIDAD CANTIDAD % DESPERDICIO VALOR UNITARIO VR. SUBTOTAL
3.2.1.1 acero 5/8'' kg 1 1 $ 2,901.60 $ 2,901.60
TOTAL $ 2,901.60