PRACTICA CALIFICADA 1
Curso: Estructuras 2
Grupo: 9
Integrantes:
Ciclo
2019-2
1
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
2
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
ÍNDICE
2. Solución pregunta A
3. Solución pregunta B
3
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
4
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
5
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
6
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
7
PARTE A
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Se pide metrar todas las columnas y vigas de la estructura (los nombres deben corresponder a los ejes).
METRADO DE
COLUMNAS
8
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
COLUMNAS ( 1° PLANTA)
EJE 5
Columna (A-5)
Carga muerta
Aligerado = 0.3x (1.875x1.375) = 0.773
p.t=0.1x(2x1.5) = 0.3
p.v= (0.25x0.5) x (1.613+1.2) x2.4 = 0.844
p.p= (0.25x0.6) x 3.2x 2.4= 1.152
Wm= 3.069
Carga viva
s/c corredor=0.4
Wv= 0.4 x (2x 1.5)
Wv= 1.2
Columna (B-5)
Carga muerta
Aligerado = 0.3x (3.75 x 1.375) = 1.547
p.t=0.1x(4x1.5)= 0.6
p.v= (0.25x0.5) x (1.613+1.375+ 1.7) x2.4 = 1.406
p.p= (0.25x0.6) x 3.2x 2.4= 1.152
Wm= 4.705
Carga viva
s/c corredor=0.4
s/c=0.2
Wv= (2x 1.5)x0.2 + (2x 1.5) x0.4=
Wv= 1.8
9
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Columna (C-5)
Carga muerta
Aligerado = 0.3x (4.75 x 1.375) = 1.959
p.t=0.1x(5x1.5) = 0.75
p.v= (0.25x0.5) x (4.4+1.375+ 1.7) x2.4 = 1.733
p.p= (0.25x0.6) x 3.2x 2.4= 1.152
Wm= 5.594
Carga viva
s/c=0.2
Wv= (5x 1.5)x0.2 =
Wv= 1.5
Columna (D-5)
Carga muerta
Aligerado = 0.3x (2.875 x 1.375) = 1.186
p.t=0.1x(3x1.5)= 0.45
p.v= (0.25x0.5) x (1.375+ 2.613) x2.4 = 1.196
p.p= (0.25x0.6) x 3.2x 2.4= 1.152
Wm= 3.984
Carga viva
s/c=0.2
Wv= (3x 1.5)x0.2
Wv= 0.9
10
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
EJE 4
Columna (A-4)
Carga muerta
Aligerado = 0.3x (3.25 x 1.875) = 1.828
p.t=0.1x(3.5x2)= 0.7
p.v= (0.25x0.5) x (1.2+ 1.875+1.875) x2.4 = 1.485
p.p= (0.25x0.6) x 3.2x 2.4= 1.152
Wm= 5.165
Carga viva
s/c corredor=0.4
Wv= (3.5x 1.5)x0.4
Wv= 2.8
EJE 2
Columna (A-2)
Carga muerta
Aligerado = 0.3x (0.825 x 1.875) = 0.464
L Maciza= 0.2 x 2.4x (1.875x 1.875) = 1.688
p.t=0.1x( 2.95x2 )= 0.59
p.v= (0.25x0.5) x (0.825+ 2+1.613) x2.4 = 1.33
p.p= (0.25x0.6) x 3.2x 2.4= 1.152
Wm= 5.225
Carga viva
s/c corredor=0.4
s/c=0.2
Wv= (0.95x 2)x0.4 + (2x2)x0.2
Wv= 1.56
Columna (B-2)
11
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Carga muerta
Aligerado = 0.3x (5.03) = 1.509 ton
Maciza = 2.4 x 0.2 x 6.563 = 3.150 ton
p.t=0.1 x (14.959) = 1.496 ton
p.v= 0.25 x 0.2 (1.438) x 2.4 = 0.173 +
0.25 x 0.50(1.569) x 2.4 = 0.471 +
= 0.644 ton
p.p= (0.25x0.6) x 3.2 x 2.4= 1.152 ton
Wm= 7.951 ton
Carga viva
s/c corredor=0.4
s/c habitaciones = 0.2
Wv= (9 x 0.4)+ (6.109 x 0.2) =
Wv= 4.823
Columna (C-2)
Carga muerta
Maciza = 2,4 x 0,2 x 17,994 = 8,637 ton
p.t=0.1 x (22.6) = 2.26 ton
p.v= 0,25 x 0,2 (1,688) x 2,4 = 0,203 +
0,25 x 0,5 (3,069) x 2,4 = 0,921 +
= 1,124 ton
p.p= (0.25x0.6) x 3.2x 2.4= 1.152 ton
Wm= 13,173 ton
Carga viva
s/c habitaciones = 0.2
Wv= (22.6 x 0.2) = 4.52 ton
Wv= 4.52 ton
12
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Columna (D-2)
Carga muerta
Maciza = 2,4 x 0,2 x 15 = 7 ton
p.t=0.1 x (14.85) = 1.485 ton
p.v= 0,25 x 0,2 (3,125) x 2,4 = 0,375 +
0,25 x 0,2 (1,75) x 2,4 = 0,21 +
0,25 x 0,5 (2,4) x 2,4 = 0,72 +
0,25 x 0,5 (2,75) x 2,4 = 0,825 +
= 2,13 ton
p.p= (0.25x0.6) x 3.2x 2.4= 1.152 ton
Wm= 11,767 ton
Carga viva
s/c habitaciones = 0.2
Wv= ((5,125 x 3,125) - (0,25 x 0,5)) x 0,2 = 3,178 ton
Wv= 3,178 ton
Carga viva
s/c corredor=0.4
Wv= 0.4 x (2x 1.5)
13
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Wv= 1.2
Columna (B-5)
Carga muerta
Aligerado = 0.3x (3.75 x 1.375) = 1.547
p.t=0.1x(4x1.5)= 0.6
p.v= (0.25x0.5) x (1.613+1.375+ 1.7) x2.4 = 1.406
p.p= (0.25x0.6) x 2.7x 2.4= 0.972
Wm= 4.525
Carga viva
s/c corredor=0.4
s/c=0.2
Wv= (2x 1.5)x0.2 + (2x 1.5) x0.4=
Wv= 1.8
Columna (C-5)
Carga muerta
Aligerado = 0.3x (4.75 x 1.375) = 1.959
p.t=0.1x(5x1.5)= 0.75
p.v= (0.25x0.5) x (4.4+1.375+ 1.7) x2.4 = 1.733
p.p= (0.25x0.6) x 2.7x 2.4= 0.972
Wm= 5.414
Carga viva
s/c=0.2
Wv= (5x 1.5)x0.2 =
Wv= 1.5
14
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Columna (D-5)
Carga muerta
Aligerado = 0.3x (2.875 x 1.375) = 1.186
p.t=0.1x(3x1.5)= 0.45
p.v= (0.25x0.5) x (1.375+ 2.613) x2.4 = 1.196
p.p= (0.25x0.6) x 2.7x 2.4= 0.972
Wm= 3.804
Carga viva
s/c=0.2
Wv= (3x 1.5)x0.2 =
Wv= 0.9
EJE 4
Columna (A-4)
Carga muerta
Aligerado = 0.3x (3.25 x 1.875) = 1.828
p.t=0.1x(3.5x2)= 0.7
p.v= (0.25x0.5) x (1.2+ 1.875+1.875) x2.4 = 1.485
p.p= (0.25x0.6) x 2.7x 2.4= 0.972
Wm= 4.985
Carga viva
s/c corredor=0.4
Wv= (3.5x 1.5)x0.4 =
Wv= 2.8
EJE 2
15
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Columna (A-2)
Carga muerta
Aligerado = 0.3x (0.825 x 1.875) = 0.464
L Maciza= 0.2 x 2.4x (1.875x 1.875) = 1.688
p.t=0.1x( 2.95x2 )= 0.59
p.v= (0.25x0.5) x (0.825+ 2+1.613) x2.4 = 1.33
p.p= (0.25x0.6) x 2.7x 2.4= 0.972
Wm= 5.045
Carga viva
s/c corredor=0.4
s/c=0.2
Wv= (0.95x 2)x0.4 + (2x2)x0.2 =
Wv= 1.56
Columna (B-2)
Carga muerta
Aligerado = 0.3x (5.03) = 1.509 ton
Maciza = 2.4 x 0.2 x 6.563 = 3.150 ton
p.t=0.1 x (14.959) = 1.496 ton
p.v= 0.25 x 0.2 (1.438) x 2.4 = 0.173 +
0.25 x 0.50(1.569) x 2.4 = 0.471 +
= 0.644 ton
p.p= (0.25x0.6) x 2,7x 2.4= 0.972 ton
Wm= 7.771 ton
Carga viva
s/c corredor=0.4
s/c habitaciones = 0.2
Wv= (9 x 0.4)+ (6.109 x 0.2) =
Wv= 4.823 ton
16
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Columna (C-2)
Carga muerta
Maciza = 2,4 x 0,2 x 17,994 = 8,637 ton
p.t=0.1 x (22.6) = 2.26 ton
p.v= 0,25 x 0,2 (1,688) x 2,4 = 0,203 +
0,25 x 0,5 (3,069) x 2,4 = 0,921 +
= 1,124 ton
p.p= (0.25x0.6) x 2.7x 2.4= 0.972 ton
Wm= 12.993 ton
Carga viva
s/c habitaciones = 0.2
Wv= (22.6 x 0.2) = 4.52 ton
Wv= 4.52ton
Columna (D-2)
Carga muerta
Maciza = 2,4 x 0,2 x 15 = 7 ton
p.t=0.1 x (14.85) = 1.485 ton
p.v= 0,25 x 0,2 (3,125) x 2,4 = 0,375 +
0,25 x 0,2 (1,75) x 2,4 = 0,21 +
0,25 x 0,5 (2,4) x 2,4 = 0,72 +
0,25 x 0,5 (2,75) x 2,4 = 0,825 +
= 2,13 ton
p.p= (0.25x0.6) x 2.7x 2.4= 0.972 ton
Wm= 11,587 ton
Carga viva
s/c habitaciones = 0.2
17
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Wv= ((5,125 x 3,125) - (0,25 x 0,5)) x 0,2 = 3,178 ton
Wv= 3,178 ton
COLUMNAS (3 ° PLANTA-TERRAZA)
EJE 2
Columna (A-2)
Carga muerta
Aligerado = 0.3x (0.825 x 1.875) = 0.464
L Maciza= 0.2 x 2.4x (1.875x 1.875) = 1.688
p.t=0.1 x (2.95x2 )= 0.59
p.v= (0.25x0.5) x (0.825+ 2+1.613) x2.4 = 1.33
p.p= (0.25x0.6) x 2.7x 2.4= 0.972
Wm= 5.045
Carga viva
s/c corredor=0.4
s/c azotea=0.1
Wv= (0.95x 2)x0.4 + (2x2)x0.1 =
Wv= 1.16
Columna (B-2)
Carga muerta
Aligerado = 0.3x (5.03) = 1.509 ton
Maciza = 2.4 x 0.2 x 6.563 = 3.150 ton
p.t=0.1 x (14.959) = 1.496 ton
p.v= 0.25 x 0.2 (1.438) x 2.4 = 0.173 +
0.25 x 0.50(1.569) x 2.4 = 0.471 +
= 0.644 ton
p.p= (0.25x0.6) x 2,7x 2.4= 0.972 ton
Wm= 7.771 ton
18
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Carga viva
s/c corredor=0.4
s/c azotea = 0.1
Wv= (9 x 0.4)+ (6.109 x 0.1) =
Wv= 4.211 ton
Columna (C-2)
Carga muerta
Maciza = 2,4 x 0,2 x 17,994 = 8,637 ton
p.t=0.1 x (22.6) = 2.26 ton
p.v= 0,25 x 0,2 (1,688) x 2,4 = 0,203 +
0,25 x 0,5 (3,069) x 2,4 = 0,921 +
= 1,124 ton
p.p= (0.25x0.6) x 2.7x 2.4= 0.972 ton
Wm= 12.993 ton
Carga viva
s/c habitaciones = 0.2
Wv= (22.6 x 0.1) = 2.26 ton
Wv= 2.26 ton
Columna (D-2)
Carga muerta
Maciza = 2,4 x 0,2 x 15 = 7 ton
p.t=0.1 x (14.85) = 1.485 ton
p.v= 0,25 x 0,2 (3,125) x 2,4 = 0,375 +
0,25 x 0,2 (1,75) x 2,4 = 0,21 +
0,25 x 0,5 (2,4) x 2,4 = 0,72 +
0,25 x 0,5 (2,75) x 2,4 = 0,825 +
= 2,13 ton
19
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
p.p= (0.25x0.6) x 2.7x 2.4= 0.972 ton
Wm= 11,587 ton
Carga viva
s/c habitaciones = 0.2
Wv= ((5,125 x 3,125) - (0,25 x 0,5)) x 0,1 = 1.589 ton
Wv= 1.589 ton
COLUMNAS (4 ° PLANTA-AZOTEA)
EJE 5
Columna (A-5)
Carga muerta
Aligerado = 0.3x (1.875x1.375) = 0.773
p.t=0.1x(2x1.5)= 0.3
p.v= (0.25x0.5) x (1.613+1.2) x2.4 = 0.844
p.p= (0.25x0.6) x 2.7x 2.4= 0.972
Wm= 2.889
Carga viva
s/c corredor=0.1
Wv= 0.1 x (2x 1.5) Wv= 0.3
Columna (B-5)
Carga muerta
Aligerado = 0.3x (3.75 x 1.375) = 1.547
p.t=0.1x(4x1.5)= 0.6
p.v= (0.25x0.5) x (1.613+1.375+ 1.7) x2.4 = 1.406
p.p= (0.25x0.6) x 2.7x 2.4= 0.972
Wm= 4.525
Carga viva
20
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
s/c azotea=0.1
Wv= (4x 1.5)x0.1=
Wv= 0.6
Columna (C-5)
Carga muerta
Aligerado = 0.3x (4.75 x 1.375) = 1.959
p.t=0.1x(5x1.5)= 0.75
p.v= (0.25x0.5) x (4.4+1.375+ 1.7) x2.4 = 1.733
p.p= (0.25x0.6) x 2.7x 2.4= 0.972
Wm= 5.414
Carga viva
s/c=0.1
Wv= (5x 1.5)x0.1 =
Wv= 0.75
Columna (D-5)
Carga muerta
Aligerado = 0.3x (2.875 x 1.375) = 1.186
p.t=0.1x(3x1.5)= 0.45
p.v= (0.25x0.5) x (1.375+ 2.613) x2.4 = 1.196
p.p= (0.25x0.6) x 2.7x 2.4= 0.972
Wm= 3.804
Carga viva
s/c=0.2
Wv= (3x 1.5)x0.1 =
Wv= 0.45
21
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
EJE 4
Columna (A-4)
Carga muerta
Aligerado = 0.3x (3.25 x 1.875) = 1.828
p.t=0.1x(3.5x2)= 0.7
p.v= (0.25x0.5) x (1.2+ 1.875+1.875) x2.4 = 1.485
p.p= (0.25x0.6) x 2.7x 2.4= 0.972
Wm= 4.985
Carga viva
s/c corredor=0.4
Wv= (3.5x 1.5)x0.1 =
Wv= 0.525
EJE 2
Columna (A-2)
Carga muerta
Aligerado = 0.3x (0.825 x 1.875) = 0.464
p.t=0.1x( 0.95x2 )= 0.19
p.v= (0.25x0.5) x (0.825+1.613) x2.4 = 0.731
p.p= (0.25x0.6) x 2.7x 2.4= 0.972
Wm= 2.757
Carga viva
s/c azotea=0.1
Wv= (0.95x 2)x0.1 =
Wv= 0.19
22
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Columna (B-2)
Carga muerta
Aligerado = 0.3x (6.563) = 1.509 ton
p.t=0.1 x ( 6,522) = 0,652 ton
p.v= 0,25 x 0,5 (0,719) x 2,4 = 0,216 +
0,25 x 0,5 (0,531) x 2,4 = 0,159 +
= 0,375 ton
p.p= (0.25x0.6) x 2,7x 2.4= 0.972 ton
Wm= 3.508 ton
Carga viva
s/c azotea = 0.1
Wv= (9 x 0.1) =
Wv= 0.9 ton
CONCLUSIÓN
Escogimos las columnas B-2 y C-2 para el pre dimensionamiento debido a que
son las que probablemente reciben la mayor carga por el tamaño de sus áreas
de influencia.
23
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
B-2
Niveles Pm(t) PV(t)
P1 7.951 4.823
P2 7.771 4.823
P3 7.771 4.211
P4 3.508 0.9
27.001 14.757
Carga total en servicio = 41.758
Ag = 41.758 / (0.4) * (2100 t/m2) = 0.0497
√0.0497 = 0.223
Concluimos que las columnas actuales están cumpliendo con el área minina
que deberían tener. Sin embargo, están un poco sobredimensionadas; por esta
razón, proponemos que las columnas de 30 x 30 cm ahorraría material, pero
para evitar la sección cuadrada por temas de diseño, se podría emplear
columnas de 25 x 40 cm.
24
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
25
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
METRADO DE
VIGAS
26
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
27
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
EJES HORIZONTALES
VIGAS (1° Y 2 ° PLANTA)
EJE 1
Tramo A-B
Carga muerta
Carga viva
s/c = 0.2
Tramo B-C
Carga muerta
Carga viva
s/c = 0.2
Tramo C-D
28
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Carga muerta
Losa : 0.2 x (2.4) = 0.48 tn/m2
p.t : 0.1 tn/m2
p.p: 0.25 x (0.2) x (2.4) = 0.12 tn/ml
wm1= 0.58 x 0.875 = 0.5075 tn/ml
Carga viva:
s/c = 0.2
Wv = 0.2 x 0.875 = 0.175 tn/ml
EJE 2
Tramo A-B
Carga muerta
Carga viva
s/c = 0.2
29
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Tramo B-C:
Carga muerta
Losa: 0.2 x (2.4) = 0.48 tn/m2
p.t: 0.1 tn/m2
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
wm1= 0.58 x 0.875 = 0.5075 tn/ml
Carga viva
s/c = 0.2
Wv = 0.2 x 0.875 = 0.175 tn/ml
Tramo C-D
Carga muerta:
Wm2=
x 0.58 x 0.875 = 0.5075 tn/ml
Carga viva:
s/c = 0.2
Wv1
x = 0.2 x 2.875 = 0.575 tn/ml
Wv2=
x 0.2 x 0.875 = 0.175 tn/ml
EJE 3
30
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Tramo A-B
Carga muerta
Losa: 0.3 x (1.875) = 0.5625 tn/ml
p.t : 0.1 x ( 2.125) = 0.2125 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
Wm= 1.075 tn/ml
Carga viva:
s/c = 0.4
Wv = 0.4 x 1.875 = 0.75 tn/ml
Tramo C-D
Carga muerta
Carga viva
s/c = 0.2
wv1 = 0.2 x 1.875 = 0.375 tn/ml
Carga muerta
31
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Losa : 0.3 x (3.25) = 0.975 tn/ml
p.t : 0.1 x (3.5) = 0.35 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
wm = 1.625 tn/ml
Carga viva
s/c = 0.4
wv = 0.4 x 3.25 = 1.3 tn/ml
Tramo C-D
Carga muerta:
Losa : 0.3 x (3.25) = 0.975 tn/ml
p.t : 0.1 x (3.5) = 0.35 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
wm = 1.625 tn/ml
Carga viva
s/c = 0.2
wv = 0.2 x 3.25 = 0.65 tn/ml
EJE 5
Tramo A-B
Carga muerta:
Losa : 0.3 x (1.375) = 0.4125 tn/ml
p.t : 0.1 x (1.625) = 0.1625 tn/ml
32
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Carga viva:
s/c = 0.4
wcv = 0.4 x 1.375 = 0.55 tn/ml
Tramo C-D
Carga muerta
Losa : 0.3 x (1.375) = 0.4125 tn/ml
p.t : 0.1 x (1.625) = 0.1625 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
wcm = 0.875 tn/ml
Carga viva
s/c = 0.2
wcv = 0.2 x 1.375 = 0.275 tn/ml
VIGAS (3 ° PLANTA)
EJE 1
Tramo A-B
Carga muerta
Carga viva
s/c = 0.1
33
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Tramo B-C
Carga muerta
Carga viva
s/c = 0.1
Tramo C-D
Carga muerta
Losa : 0.2 x (2.4) = 0.48 tn/m2
p.t : 0.1 tn/m2
p.p: 0.25 x (0.2) x (2.4) = 0.12 tn/ml
wm1= 0.58 x 0.875 = 0.5075 tn/ml
Carga viva:
s/c = 0.1
Wv = 0.1 x 0.875 = 0.0875 tn/ml
EJE 2
Tramo A-B
Carga muerta
34
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
p.t : 0.1 tn/m2
Carga viva
s/c = 0.1
Tramo B-C:
Carga muerta
Losa: 0.2 x (2.4) = 0.48 tn/m2
p.t: 0.1 tn/m2
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
wm1= 0.58 x 0.875 = 0.5075 tn/ml
Carga viva
s/c = 0.1
Wv = 0.1 x 0.875 = 0.0875 tn/ml
Tramo C-D
Carga muerta:
35
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
Wm1= 0.58 x 2.875 = 1.6675 tn/ml
x
Wm2=
x 0.58 x 0.875 = 0.5075 tn/ml
Carga viva:
s/c = 0.1
Wv1
x = 0.1 x 2.875 = 0.2875 tn/ml
Wv2=
x 0.1 x 0.875 = 0.0875 tn/ml
EJE 3
Tramo A-B
Carga muerta
Losa: 0.3 x (1.875) = 0.5625 tn/ml
p.t : 0.1 x ( 2.125) = 0.2125 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
Wm= 1.075 tn/ml
Carga viva:
s/c = 0.4
Wv = 0.4 x 1.875 = 0.75 tn/ml
Tramo C-D
Carga muerta
36
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Losa 2: 0.2 x 2.4 = 0.48 tn/m2
p.t : 0.1 tn/m2
Carga viva
s/c 1= 0.2
s/c 2= 0.1
wv1 = 0.2 x 1.875 = 0.375 tn/ml
Carga muerta
Losa : 0.3 x (3.25) = 0.975 tn/ml
p.t : 0.1 x (3.5) = 0.35 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
wm = 1.625 tn/ml
Carga viva
s/c = 0.4
wv = 0.4 x 3.25 = 1.3 tn/ml
Tramo C-D
Carga muerta:
Losa : 0.3 x (3.25) = 0.975 tn/ml
p.t : 0.1 x (3.5) = 0.35 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
37
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
wm = 1.625 tn/ml
Carga viva
s/c = 0.2
wv = 0.2 x 3.25 = 0.65 tn/ml
EJE 5
Tramo A-B
Carga muerta:
Losa : 0.3 x (1.375) = 0.4125 tn/ml
p.t : 0.1 x (1.625) = 0.1625 tn/ml
Carga viva:
s/c = 0.4
wcv = 0.4 x 1.375 = 0.55 tn/ml
Tramo C-D
Carga muerta
Losa : 0.3 x (1.375) = 0.4125 tn/ml
p.t : 0.1 x (1.625) = 0.1625 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
wcm = 0.875 tn/ml
Carga viva
s/c = 0.2
wcv = 0.2 x 1.375 = 0.275 tn/ml
38
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
VIGAS ( 4° PLANTA)
EJE 3
Tramo A-B
Carga muerta
Losa: 0.3 x (1.875) = 0.5625 tn/ml
p.t : 0.1 x ( 2.125) = 0.2125 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
Wm= 1.075 tn/ml
Carga viva:
s/c = 0.1
Wv = 0.1 x 1.875 = 0.1875 tn/ml
Tramo C-D
Carga muerta
Carga viva
s/c = 0.1
wv1 = 0.1 x 1.875 = 0.1875 tn/ml
39
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
EJE 4
Tramo A-B
Carga muerta
Losa : 0.3 x (3.25) = 0.975 tn/ml
p.t : 0.1 x (3.5) = 0.35 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
wm = 1.625 tn/ml
Carga viva
s/c = 0.1
wv = 0.1 x 3.25 = 0.325 tn/ml
Tramo C-D
Carga muerta:
Losa : 0.3 x (3.25) = 0.975 tn/ml
p.t : 0.1 x (3.5) = 0.35 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
wm = 1.625 tn/ml
Carga viva
s/c = 0.1
wv = 0.1 x 3.25 = 0.325 tn/ml
EJE 5
Tramo A-B
Carga muerta:
Losa : 0.3 x (1.375) = 0.4125 tn/ml
p.t : 0.1 x (1.625) = 0.1625 tn/ml
40
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Carga viva:
s/c = 0.1
wcv = 0.1 x 1.375 = 0.1375 tn/ml
Tramo C-D
Carga muerta
Losa : 0.3 x (1.375) = 0.4125 tn/ml
p.t : 0.1 x (1.625) = 0.1625 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
wcm = 0.875 tn/ml
Carga viva
s/c = 0.1
wcv = 0.1 x 1.375 = 0.1375 tn/ml
EJES VERTICALES
VIGAS (1° Y 2 ° PLANTA)
EJE A
Tramo 1 (5-4/ 4-3)
Carga muerta
Losa = 0.3x (0) = 0
p.t= 0.1 x (0.25) = 0.025 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm = 0.325 tn/ml
41
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Carga viva
s/c=0.4
Wv= 0.4 x 0 = 0
Tramo 2 (3-2)
Carga muerta
Losa= 0.3 x (1.875) = 0.5625 tn/ml
p.t= 0.1 x (2.125) = 0.2125 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm= 1.075 tn/ml
Carga viva
s/c= 0.4
Wv= 0.4 x 1.875 = 0.75 tn/ml
Tramo 3 (2-1)
Carga muerta
Losa= 0.2 x (2.4) = 0.48
p.t= 0.1
pp= p.p: 0.25 x (0.2) x (2.4) = 0.12 tn/ml
Wm= 0.875 x 0.58 = 0.5075 tn/ml
Carga viva
s/c= 0.2
Wv= 0.2 x 0.875
Wv = 0.175 tn/ml
EJE B
Tramo 1 (5-4/ 4-3)
42
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Carga muerta
Losa = 0.3x (0) = 0
p.t= 0.1 x (0.25) = 0.025 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm = 0.325 tn/ml
Carga viva
s/c de corredor = 0.4 / sc de cuarto = 0.2
Wv= 0.4 x 0 = 0
Tramo 2 (3-2)
Carga muerta
Losa= 0.3 x (1.875) = 0.5625 tn/ml
p.t= 0.1 x (2.125) = 0.2125 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm= 1.075 tn/ml
Carga viva
s/c= 0.4
Wv= 0.4 x 1.875 tn/ml
Wv = 0.75 tn/ml
Tramo 3 (2-1)
Carga muerta
Losa= 0.2 x (2.4) = 0.48 tn/ml
p.t= 0.1 tn/ml
p.p: 0.25 x (0.2) x (2.4) = 0.12 tn/ml
Wm1= 0.875 x 0.58 = 0.5075 tn/ml
43
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Carga viva
s/c= 0.2
Wv1= 0.2 x 0.875 = 0.175 tn/ml
s/c= 0.4
Wv2= 0.4 x 0.875 = 0.35 tn/ml
EJE C
Tramo 1 (5-4/ 4-3)
Carga muerta
Losa = 0.3x (0) = 0
p.t= 0.1 x (0.25) = 0.025 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm = 0.325 tn/ml
Carga viva
s/c= 0.2
Wv= 0.2 x 0 = 0
Tramo 2 (3-2)
Carga muerta
Losa= 0.2 x (2.4) = 0.48 tn/ml
p.t= 0.1 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm= 2.875 x 0.58 = 1.6675 tn/ml
Carga viva
s/c= 0.2
Wv= 0.2 x 2.875 = 0.575 tn/ml
Tramo 3 (2-1)
44
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Carga muerta
Losa= 0.2 x (2.4) = 0.48 tn/ml
p.t= 0.1 tn/ml
p.p: 0.25 x (0.2) x (2.4) = 0.12 tn/ml
Wm1= 0.875 x 0.58 = 0.5075 tn/ml
Carga viva
s/c= 0.2
Wv1= 0.2 x 1.75 = 0.35 tn/ml
EJE D
Tramo 1 (5-4)
Carga muerta
Losa = 0.3x (0) = 0
p.t= 0.1 x (0.25) = 0.025 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm = 0.325 tn/ml
Carga viva
s/c= 0.2
Wv= 0.2 x 0 = 0
Tramo 2 (3-2)
Carga muerta
Losa= 0.2 x (2.4) = 0.48 tn/ml
p.t= 0.1 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm= 2.875 x 0.58 = 1.6675 tn/ml
45
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Carga viva
s/c= 0.2
Wv= 0.2 x 2.875 = 0.575 tn/ml
Tramo 3 (2-1)
Carga muerta
Losa= 0.2 x (2.4) = 0.48 tn/ml
p.t= 0.1 tn/ml
p.p: 0.25 x (0.2) x (2.4) = 0.12 tn/ml
Wm= 0.875 x 0.58 = 0.5075 tn/ml
Carga viva
s/c= 0.2
Wv1= 0.2 x 0.875 = 0.175 tn/ml
Carga viva
s/c=0.1
Wv= 0.1 x 0 = 0
Tramo 2 (3-2)
46
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Carga muerta
Losa= 0.3 x (1.875) = 0.5625 tn/ml
p.t= 0.1 x (2.125) = 0.2125 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm= 1.075 tn/ml
Carga viva
s/c= 0.1
Wv= 0.1 x 1.875 = 0.1875 tn/ml
Tramo 3 (2-1)
Carga muerta
Losa= 0.2 x (2.4) = 0.48 tn/ml
p.t= 0.1 tn/ml
p.p: 0.25 x (0.2) x (2.4) = 0.12 tn/ml
Wm= 0.875 x 0.58 = 0.5075 tn/ml
Carga viva
s/c= 0.1
Wv= 0.1 x 0.875 tn/ml
Wv = 0.0875 tn/ml
EJE B
Tramo 1 (5-4/ 4-3)
Carga muerta
Losa = 0.3x (0) = 0
p.t= 0.1 x (0.25) = 0.025 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm = 0.325 tn/ml
47
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Carga viva
s/c de corredor = 0.4 / sc de cuarto = 0.2
Wv= 0.4 x 0 = 0
Tramo 2 (3-2)
Carga muerta
Losa= 0.3 x (1.875) = 0.5625 tn/ml
p.t= 0.1 x (2.125) = 0.2125 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm= 1.075 tn/ml
Carga viva
s/c= 0.4
Wv= 0.4 x 1.875 tn/ml
Wv = 0.75 tn/ml
Tramo 3 (2-1)
Carga muerta
Losa= 0.2 x (2.4) = 0.48 tn/ml
p.t= 0.1 tn/ml
p.p: 0.25 x (0.2) x (2.4) = 0.12 tn/ml
Wm1= 0.875 x 0.58 = 0.5075 tn/ml
Carga viva
s/c= 0.2
Wv1= 0.2 x 0.875 = 0.175 tn/ml
s/c= 0.4
Wv2= 0.4 x 0.875 = 0.35 tn/ml
48
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
EJE C
Tramo 1 (5-4/ 4-3)
Carga muerta
Losa = 0.3x (0) = 0
p.t= 0.1 x (0.25) = 0.025 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm = 0.325 tn/ml
Carga viva
s/c= 0.2
Wv= 0.2 x 0 = 0
Tramo 2 (3-2)
Carga muerta
Losa= 0.2 x (2.4) = 0.48 tn/ml
p.t= 0.1 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm= 2.875 x 0.58 = 1.6675 tn/ml
Carga viva
s/c= 0.2
Wv= 0.2 x 2.875 = 0.575 tn/ml
Tramo 3 (2-1)
Carga muerta
Losa= 0.2 x (2.4) = 0.48 tn/ml
p.t= 0.1 tn/ml
p.p: 0.25 x (0.2) x (2.4) = 0.12 tn/ml
Wm1= 0.875 x 0.58 = 0.5075 tn/ml
49
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Carga viva
s/c= 0.2
Wv1= 0.2 x 1.75 = 0.35 tn/ml
EJE D
Tramo 1 (5-4)
Carga muerta
Losa = 0.3x (0) = 0
p.t= 0.1 x (0.25) = 0.025 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm = 0.325 tn/ml
Carga viva
s/c= 0.2
Wv= 0.2 x 0 = 0
Tramo 2 (3-2)
Carga muerta
Losa= 0.2 x (2.4) = 0.48 tn/ml
p.t= 0.1 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm= 2.875 x 0.58 = 1.6675 tn/ml
Carga viva
s/c= 0.2
Wv= 0.2 x 2.875 = 0.575 tn/ml
50
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Tramo 3 (2-1)
Carga muerta
Losa= 0.2 x (2.4) = 0.48 tn/ml
p.t= 0.1 tn/ml
p.p: 0.25 x (0.2) x (2.4) = 0.12 tn/ml
Wm= 0.875 x 0.58 = 0.5075 tn/ml
Carga viva
s/c= 0.2
Wv1= 0.2 x 0.875 = 0.175 tn/ml
Carga viva
s/c=0.1
Wv= 0.1 x 0 = 0
Tramo 2 (3-2)
Carga muerta
Losa= 0.3 x (1.875) = 0.5625 tn/ml
p.t= 0.1 x (2.125) = 0.2125 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm= 1.075 tn/ml
51
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Carga viva
s/c= 0.1
Wv= 0.1 x 1.875 = 0.1875 tn/ml
EJE B
Tramo 1 (5-4/ 4-3)
Carga muerta
Losa = 0.3x (0) = 0
p.t= 0.1 x (0.25) = 0.025 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm = 0.325 tn/ml
Carga viva
s/c = 0.1
Wv= 0.1 x 0 = 0
Tramo 2 (3-2)
Carga muerta
Losa= 0.3 x (1.875) = 0.5625 tn/ml
p.t= 0.1 x (2.125) = 0.2125 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm= 1.075 tn/ml
Carga viva
s/c= 0.1
Wv= 0.1 x 1.875 tn/ml
Wv = 0.1875 tn/ml
EJE C
52
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Tramo 1 (5-4/ 4-3)
Carga muerta
Losa = 0.3x (0) = 0
p.t= 0.1 x (0.25) = 0.025 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm = 0.325 tn/ml
Carga viva
s/c= 0.1
Wv= 0.1 x 0 = 0
EJE D
Tramo 1 (5-4)
Carga muerta
Losa = 0.3x (0) = 0
p.t= 0.1 x (0.25) = 0.025 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm = 0.325 tn/ml
Carga viva
s/c= 0.1
Wv= 0.1 x 0 = 0
53
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
54
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
55
PARTE B
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Debido a la gran demanda del hotel, el dueño se ha contactado con usted para infórmale su
intención de realizar una ampliación de la edificación. Él le propone aumentar dos niveles de la
misma forma del techo piso 4.
El primer nivel será usado para más habitaciones (considerar todas las condiciones de la parte 1) y
el siguiente se usará como lugar de asamblea (con asientos móviles en toda la planta).
Para darle una respuesta al dueño usted debe indicar qué columnas se deben encamisetarse
(indicar dimensiones) con el fin de poder realizar dicha ampliación
METRADO DE
COLUMNA
56
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
57
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
EJE 5
Columna (A-5)
Carga muerta
p.t=0.1x(2x1.5)= 0.3
Wm= 2.889
Carga viva
s/c corredor=0.4
Wv= 1.2
Columna (B-5)
Carga muerta
p.t=0.1x(4x1.5)= 0.6
Wm= 4.525
Carga viva
s/c corredor=0.4
s/c=0.2
Wv= 2.4
58
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Columna (C-5)
Carga muerta
p.t=0.1x(5x1.5)= 0.75
Wm= 5.414
Carga viva
s/c=0.2
Wv= 3
Columna (D-5)
Carga muerta
p.t=0.1x(3x1.5)= 0.45
Wm= 3.804
Carga viva
s/c=0.2
Wv= 1.8
59
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
EJE 4
Columna (A-4)
Carga muerta
p.t=0.1x(3.5x2)= 0.7
Wm= 4.985
Carga viva
s/c corredor=0.4
Wv= 2.8
EJE 2
Columna (A-2)
Carga muerta
Wm= 2.757
Carga viva
s/c azotea=0.1
Wv= 0.76
60
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Ai= 64.443
Ac=0.061
25cm x 25cm
61
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
CONCLUSIÓN
62
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
63
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
METRADO DE
VIGAS
64
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
65
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
EJES VERTICALES
VIGAS ( 4° PLANTA)
EJE 3
Tramo A-B
Carga muerta
Losa: 0.3 x (1.875) = 0.5625 tn/ml
p.t : 0.1 x ( 2.125) = 0.2125 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
Wm= 1.075 tn/ml
Carga viva:
s/c = 0.4
Wv = 0.4 x 1.875 = 0.75 tn/ml
Tramo C-D
Carga muerta
Carga viva
s/c = 0.2
wv1 = 0.2 x 1.875 = 0.375 tn/ml
66
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
EJE 4
Tramo A-B
Carga muerta
Losa : 0.3 x (3.25) = 0.975 tn/ml
p.t : 0.1 x (3.5) = 0.35 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
wm = 1.625 tn/ml
Carga viva
s/c = 0.4
wv = 0.4 x 3.25 = 1.3 tn/ml
Tramo C-D
Carga muerta:
Losa : 0.3 x (3.25) = 0.975 tn/ml
p.t : 0.1 x (3.5) = 0.35 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
wm = 1.625 tn/ml
Carga viva
s/c = 0.2
wv = 0.2 x 3.25 = 0.65 tn/ml
EJE 5
Tramo A-B
Carga muerta:
Losa : 0.3 x (1.375) = 0.4125 tn/ml
p.t : 0.1 x (1.625) = 0.1625 tn/ml
67
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Carga viva:
s/c = 0.4
wcv = 0.4 x 1.375 = 0.55 tn/ml
Tramo C-D
Carga muerta
Losa : 0.3 x (1.375) = 0.4125 tn/ml
p.t : 0.1 x (1.625) = 0.1625 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
wcm = 0.875 tn/ml
Carga viva
s/c = 0.2
wcv = 0.2 x 1.375 = 0.275 tn/ml
VIGAS ( 5° PLANTA)
EJE 3
Tramo A-B
Carga muerta
Losa: 0.3 x (1.875) = 0.5625 tn/ml
p.t : 0.1 x ( 2.125) = 0.2125 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
Wm= 1.075 tn/ml
Carga viva:
68
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
s/c = 0.4
Wv = 0.4 x 1.875 = 0.75 tn/ml
Tramo C-D
Carga muerta
Carga viva
s/c = 0.4
wv1 = 0.4 x 1.875 = 0.750 tn/ml
EJE 4
Tramo A-B
Carga muerta
Losa : 0.3 x (3.25) = 0.975 tn/ml
p.t : 0.1 x (3.5) = 0.35 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
wm = 1.625 tn/ml
Carga viva
s/c = 0.4
69
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
wv = 0.4 x 3.25 = 1.3 tn/ml
Tramo C-D
Carga muerta:
Losa : 0.3 x (3.25) = 0.975 tn/ml
p.t : 0.1 x (3.5) = 0.35 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
wm = 1.625 tn/ml
Carga viva
s/c = 0.4
wv = 0.4 x 3.25 = 1.30 tn/ml
EJE 5
Tramo A-B
Carga muerta:
Losa : 0.3 x (1.375) = 0.4125 tn/ml
p.t : 0.1 x (1.625) = 0.1625 tn/ml
Carga viva:
s/c = 0.4
wcv = 0.4 x 1.375 = 0.55 tn/ml
Tramo C-D
Carga muerta
70
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Losa : 0.3 x (1.375) = 0.4125 tn/ml
p.t : 0.1 x (1.625) = 0.1625 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
wcm = 0.875 tn/ml
Carga viva
s/c = 0.4
wcv = 0.4 x 1.375 = 0.55 tn/ml
VIGAS ( 6° PLANTA)
EJE 3
Tramo A-B
Carga muerta
Losa: 0.3 x (1.875) = 0.5625 tn/ml
p.t : 0.1 x ( 2.125) = 0.2125 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
Wm= 1.075 tn/ml
Carga viva:
s/c = 0.1
Wv = 0.1 x 1.875 = 0.1875 tn/ml
Tramo C-D
Carga muerta
71
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Wm2= 0.58 x 2.875 = 1.6675 tn/ml
Carga viva
s/c = 0.1
wv1 = 0.1 x 1.875 = 0.1875 tn/ml
Carga muerta
Losa : 0.3 x (3.25) = 0.975 tn/ml
p.t : 0.1 x (3.5) = 0.35 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
wm = 1.625 tn/ml
Carga viva
s/c = 0.1
wv = 0.1 x 3.25 = 0.325 tn/ml
Tramo C-D
Carga muerta:
Losa : 0.3 x (3.25) = 0.975 tn/ml
p.t : 0.1 x (3.5) = 0.35 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
wm = 1.625 tn/ml
Carga viva
s/c = 0.1
72
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
wv = 0.1 x 3.25 = 0.325 tn/ml
EJE 5
Tramo A-B
Carga muerta:
Losa : 0.3 x (1.375) = 0.4125 tn/ml
p.t : 0.1 x (1.625) = 0.1625 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
Carga viva:
s/c = 0.1
wcv = 0.1 x 1.375 = 0.1375 tn/ml
Tramo C-D
Carga muerta
Losa : 0.3 x (1.375) = 0.4125 tn/ml
p.t : 0.1 x (1.625) = 0.1625 tn/ml
p.p: 0.25 x (0.5) x (2.4) = 0.3 tn/ml
wcm = 0.875 tn/ml
Carga viva
s/c = 0.1
wcv = 0.1 x 1.375 = 0.1375 tn/ml
EJES VERTICALES
VIGAS ( 4° PLANTA) –> HABITACIONES
EJE A
Tramo 1 (5-4/ 4-3)
73
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Carga muerta
Losa = 0.3 x (0) = 0
p.t= 0.1 x (0.25) = 0.025 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm = 0.325 tn/ml
Carga viva
s/c=0.2
Wv= 0.2 x 0 = 0
Tramo 2 (3-2)
Carga muerta
Losa= 0.3 x (1.875) = 0.5625 tn/ml
p.t= 0.1 x (2.125) = 0.2125 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm= 1.075 tn/ml
Carga viva
s/c= 0.4
Wv= 0.4 x 1.875 = 0.75 tn/ml
EJE B
Tramo 1 (5-4/ 4-3)
Carga muerta
Losa = 0.3 x (0) = 0
p.t= 0.1 x (0.25) = 0.025 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm = 0.325 tn/ml
Carga viva
74
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
s/c=0.2
Wv= 0.2 x 0 = 0
Tramo 2 (3-2)
Carga muerta
Losa= 0.3 x (1.875) = 0.5625 tn/ml
p.t= 0.1 x (2.125) = 0.2125 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm= 1.075 tn/ml
Carga viva
s/c= 0.2
Wv= 0.2 x 1.875 = 0.375 tn/ml
EJE C
Tramo 1 (5-4/ 4-3)
Carga muerta
Losa = 0.3 x (0) = 0
p.t= 0.1 x (0.25) = 0.025 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm = 0.325 tn/ml
Carga viva
s/c=0.2
Wv= 0.2 x 0 = 0
EJE D
Tramo 1 (5-4/ 4-3)
75
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Carga muerta
Losa = 0.3 x (0) = 0
p.t= 0.1 x (0.25) = 0.025 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm = 0.325 tn/ml
Carga viva
s/c=0.2
Wv= 0.2 x 0 = 0
Carga viva
s/c=0.4
Wv= 0.4 x 0 = 0
Tramo 2 (3-2)
Carga muerta
Losa= 0.3 x (1.875) = 0.5625 tn/ml
p.t= 0.1 x (2.125) = 0.2125 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm= 1.075 tn/ml
76
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Carga viva
s/c= 0.4
Wv= 0.4 x 1.875 = 0.75 tn/ml
EJE B
Tramo 1 (5-4/ 4-3)
Carga muerta
Losa = 0.3 x (0) = 0
p.t= 0.1 x (0.25) = 0.025 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm = 0.325 tn/ml
Carga viva
s/c=0.4
Wv= 0.4 x 0 = 0
Tramo 2 (3-2)
Carga muerta
Losa= 0.3 x (1.875) = 0.5625 tn/ml
p.t= 0.1 x (2.125) = 0.2125 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm= 1.075 tn/ml
Carga viva
s/c= 0.4
Wv= 0.4 x 1.875 = 0.75 tn/ml
EJE C
Tramo 1 (5-4/ 4-3)
Carga muerta
Losa = 0.3 x (0) = 0
77
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
p.t= 0.1 x (0.25) = 0.025 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm = 0.325 tn/ml
Carga viva
s/c=0.4
Wv= 0.4 x 0 = 0
EJE D
Tramo 1 (5-4/ 4-3)
Carga muerta
Losa = 0.3 x (0) = 0
p.t= 0.1 x (0.25) = 0.025 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm = 0.325 tn/ml
Carga viva
s/c=0.4
Wv= 0.4 x 0 = 0
78
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
Carga viva
s/c=0.1
Wv= 0.1 x 0 = 0
Tramo 2 (3-2)
Carga muerta
Losa= 0.3 x (1.875) = 0.5625 tn/ml
p.t= 0.1 x (2.125) = 0.2125 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm= 1.075 tn/ml
Carga viva
s/c= 0.1
Wv= 0.1 x 1.875 = 0.1875 tn/ml
EJE B
Tramo 1 (5-4/ 4-3)
Carga muerta
Losa = 0.3x (0) = 0
p.t= 0.1 x (0.25) = 0.025 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm = 0.325 tn/ml
Carga viva
s/c = 0.1
Wv= 0.1 x 0 = 0
Tramo 2 (3-2)
Carga muerta
Losa= 0.3 x (1.875) = 0.5625 tn/ml
79
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
p.t= 0.1 x (2.125) = 0.2125 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm= 1.075 tn/ml
Carga viva
s/c= 0.1 tn/ml
Wv= 0.1 x 1.875 tn/ml
Wv = 0.1875 tn/ml
EJE C
Tramo 1 (5-4/ 4-3)
Carga muerta
Losa = 0.3x (0) = 0
p.t= 0.1 x (0.25) = 0.025 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm = 0.325 tn/ml
Carga viva
s/c= 0.1
Wv= 0.1 x 0 = 0
EJE D
Tramo 1 (5-4)
Carga muerta
Losa = 0.3x (0) = 0
p.t= 0.1 x (0.25) = 0.025 tn/ml
p.p= 0.25 x 0.50 x 2.40 = 0.3 tn/ml
Wm = 0.325 tn/ml
Carga viva
80
ESTRUCTURAS 2 PROF. ING. CARLOS SALCEDO
2019-2
s/c= 0.1
Wv= 0.1 x 0 = 0
81