Cost of Road per Km:

S.No Description Unit Qty Rate

1) Road - 18.0m wide 1000 Rm


i) Excavation
Excavation cum 4500.00 54.5
Excavation (Storm drain) cum 1500.00 54.5
ii) Laying Cost: (Incl. material & transport)
Subgrade cum 4500.00 385
Earthern Shoulder cum 1187.50 385
Granular Sub-base cum 1237.50 690
Wet Mix Macadam cum 1968.75 980
Prime Coat Sqm 7875.00 55
Dense Bitumen Macadam cum 384.38 9200
Tack Coat Sqm 7687.50 17
Semi Densed Bituminous Concrete cum 192.19 9550

Total Cost for 1000Rm - 18.0m Road

2) Road - 24.0m wide 1000 Rm


i) Excavation
Excavation cum 7500.00 54.5
Excavation (Storm drain) cum 1500.00 54.5
ii) Laying Cost: (Incl. material & transport)
Subgrade cum 7500.00 385
Earthern Shoulder cum 1312.50 385
Granular Sub-base cum 2750.00 690
Wet Mix Macadam cum 1968.75 980
Prime Coat Sqm 7875.00 55
Dense Bitumen Macadam cum 384.38 9200
Tack Coat Sqm 7687.50 17
Semi Densed Bituminous Concrete cum 192.19 9550

Total Cost for 1000Rm - 24.0m Road

3) Road - 31.0m wide 1000 Rm


i) Excavation
Excavation cum 4500.00 54.5
Excavation (Storm drain) cum 1500.00 54.5
ii) Laying Cost: (Incl. material & transport)
Subgrade cum 4500.00 385
Earthern Shoulder cum 1312.50 385
Granular Sub-base cum 1650.00 690
Wet Mix Macadam cum 1968.75 980
Prime Coat Sqm 7875.00 55
Dense Bitumen Macadam cum 403.59 9200
Tack Coat Sqm 7687.50 17
Semi Densed Bituminous Concrete cum 192.19 9550

Total Cost for 1000Rm - 31.0m Road

4) Road - 43.0m wide 1000 Rm


i) Excavation
Excavation cum 10500.00 54.5
Excavation (Storm drain) cum 1500.00 54.5
ii) Laying Cost: (Incl. material & transport)
Subgrade cum 10500.00 385
Earthern Shoulder cum 1387.50 385
Granular Sub-base cum 3795.00 690
Wet Mix Macadam cum 3937.50 980
Prime Coat Sqm 15750.00 55
Dense Bitumen Macadam cum 768.75 9200
Tack Coat Sqm 15375.00 17
Semi Densed Bituminous Concrete cum 384.38 9550
Kerb (Median) Rm 2000.00 480
Median Filling (3m wide) cum 900.00 325

Total Cost for 1000Rm - 43.0m Road

5) Road - 53.0m wide 1000 Rm


i) Excavation
Excavation cum 16200.00 54.5
Excavation (Storm drain) cum 1500.00 54.5
ii) Laying Cost: (Incl. material & transport)
Subgrade cum 16200.00 385
Earthern Shoulder cum 1425.00 385
Granular Sub-base cum 5566.00 690
Wet Mix Macadam cum 5775.00 980
Prime Coat Sqm 23100.00 55
Dense Bitumen Macadam cum 1127.50 9200
Tack Coat Sqm 22550.00 17
Semi Densed Bituminous Concrete cum 902.00 9550
Kerb (Median) Rm 2000.00 480
Median Filling (6m wide) cum 1800.00 325

Total Cost for 1000Rm - 53.0m Road

6) Road - 68.0m wide 1000 Rm


i) Excavation
Excavation cum 16200.00 54.5
Excavation (Storm drain) cum 1500.00 54.5
ii) Laying Cost: (Incl. material & transport)
Subgrade cum 16200.00 385
Earthern Shoulder cum 1387.50 385
Granular Sub-base cum 5566.00 690
Wet Mix Macadam cum 5775.00 980
Prime Coat Sqm 23100.00 55
Dense Bitumen Macadam cum 1127.50 9200
Tack Coat Sqm 22550.00 17
Semi Densed Bituminous Concrete cum 563.75 9550
Kerb (Median) Rm 2000.00 480
Median Filling (6m wide) cum 1800.00 385
Service Road:
Excavation cum 7500.00 54.5
Subgrade cum 7500.00 385
Earthern Shoulder cum 693.75 385
Granular Sub-base cum 1897.50 690
Wet Mix Macadam cum 1968.75 980
Prime Coat Sqm 7875.00 55
Dense Bitumen Macadam cum 384.38 9200
Tack Coat Sqm 7687.50 17
Semi Densed Bituminous Concrete cum 192.19 9550
Kerb (Median) Rm 4000.00 480
Median Filling (3m wide x 2 nos) cum 1800.00 385

Total Cost for 1000Rm -68.0m Road


SELECT ZONE DTZ PLEASE INPUT DATA FROM DROP
DOWN LIST

Amount (Rs.) Cost in Lakhs Layer Thickness Width

Excavation 500mm 7.5 m


Subgrade 500mm 7.5 m
245250.00 2.5 GSB 150mm 7.5 m
81750.00 0.8 WMM 250mm 7.5 m
DBM 50mm 7.5 m
1732500.00 17.3 SDBC 25mm 7.5 m
457187.50 4.6
853875.00 8.5
1929375.00 19.3
433125.00 4.3
3536250.00 35.4
130687.50 1.3
1835390.63 18.4

11,235,390.63 112.4

Excavation 500mm 12.5 m


Subgrade 500mm 12.5 m
408750.00 4.1 GSB 200mm 12.5 m
81750.00 0.8 WMM 250mm 7.5 m
DBM 50mm 7.5 m
2887500.00 28.9 SDBC 25mm 7.5 m
505312.50 5.1
1897500.00 19.0
1929375.00 19.3
433125.00 4.3
3536250.00 35.4
130687.50 1.3
1835390.63 18.4

13,645,640.63 136.5

Excavation 500mm 7.5 m


Subgrade 500mm 7.5 m
245250.00 2.5 GSB 200mm 7.5 m
81750.00 0.8 WMM 250mm 7.5 m
DBM 50mm 7.5 m
1732500.00 17.3 SDBC 25mm 7.5 m
505312.50 5.1
1138500.00 11.4
1929375.00 19.3
433125.00 4.3
3713062.50 37.1
130687.50 1.3
1835390.63 18.4

11,744,953.13 117.4
LHS
Excavation 500mm 7.5 m
Subgrade 500mm 7.5 m
572250.00 GSB 230mm 7.5 m
81750.00 WMM 250mm 7.5 m
DBM 50mm 7.5 m
4042500.00 SDBC 25mm 7.5 m
534187.50 MEDIAN
2618550.00 Median YES 3m
3858750.00 Kerb BOTH 2 Nos
866250.00 RHS
7072500.00 Excavation 500mm 7.5 m
261375.00 Subgrade 500mm 7.5 m
3670781.25 GSB 230mm 7.5 m
960000.00 WMM 250mm 7.5 m
292500.00 DBM 50mm 7.5 m
SDBC 25mm 7.5 m
24,831,393.75 248.314 L
LHS
Excavation 500mm 11 m
Subgrade 500mm 11 m
882900.00 GSB 230mm 11 m
81750.00 WMM 250mm 11 m
DBM 50mm 11 m
6237000.00 SDBC 40mm 11 m
548625.00 MEDIAN
3840540.00 Median YES 6m
5659500.00 Kerb BOTH 2 Nos
1270500.00 RHS
10373000.00 Excavation 500mm 11 m
383350.00 Subgrade 500mm 11 m
8614100.00 GSB 230mm 11 m
960000.00 WMM 250mm 11 m
585000.00 DBM 50mm 11 m
SDBC 40mm 11 m
39,436,265.00 394.363 L
LHS Service Road
Excavation 500mm 11 m 0
Subgrade 500mm 11 m 0
882900.00 GSB 230mm 11 m 0
81750.00 WMM 250mm 11 m 0
DBM 50mm 11 m 0
6237000.00 SDBC 25mm 11 m 0
534187.50
3840540.00 MEDIAN (CENTRAL)
5659500.00 Median YES 6m
1270500.00 Kerb BOTH 2 Nos
10373000.00
383350.00 RHS Service Road
5383812.50 Excavation 500mm 11 m 7.5
960000.00 Subgrade 500mm 11 m 7.5
693000.00 GSB 230mm 11 m 7.5
WMM 250mm 11 m 7.5
408750.00 DBM 50mm 11 m 7.5
2887500.00 SDBC 25mm 11 m 7.5
267093.75
1309275.00 MEDIAN (LHS)
1929375.00 Median YES 3m
433125.00 Kerb C.W & S.R 2 Nos
3536250.00
130687.50 MEDIAN (RHS)
1835390.63 Median YES 3m
1920000.00 Kerb C.W & S.R 2 Nos
693000.00
Note: C.W - Carrage way Side & S.R - Service Road Side
51,649,986.88 516.500 L
1000 0
500 7.5
300 11
12.5
250 15
230

200
150
130
100 SEZ
50 DTZ
40
25

1000

500
300

250
230
200
150
100
50
25

1000

500
300

250
230
200
150
100
50
25

1000 LHS 1
RHS 1
500 BOTH 2
300

250
230
200
150
100
50
25

1000

500
300

250
230
200
150
100
50
40
25

Service Road
m
m
m
m
m 1000
m 500

300
250
230
200
Service Road 150
m 100
m 50
m 25
m
m
m
DTZ SEZ
Excavation 54.5 52
Subgrade 385 310
Granular Sub-base 690 540
Wet Mix Macadam 980 870
Prime Coat 55 43
Dense Bitumen Macadam 9200 7900
Tack Coat 17 14
Semi Densed Bituminous Concrete 9550 8600
Kerb 480 430
YES 3
NO 0

YES 6
NO 0
C WAY 1
S.ROAD 1
C.W & S.R 2
Cost of Road per KM:

S.No Description Cost

Commen notes:
a) Bitumen qty in DBM & SDBC as per mix design and SS Emulsion for prime coat at the rate of 6 to 9
kg per 10 sqm and RS Emulsion for tack coat 2.5 to 3 kg per 10sqm shall be applied

b) Excavation and Subgrade thickness will be as per actual EGL and CBR value of existing ground. For
costing purpose both are considered as 500mm
c) Storm drain excavation will be executed along with the road work so the cost included in the road,
shall be deducted in storm drain cost
d) Cost of utility crossings and culverts shall be in respective item costing

1 Road - 18.0m wide ### per Km


Detail of Road Sections:
a) Road width 18 m
b) Carriageway width 7.5 m
c) Width of Shoulder & Utilities 5.25 m
d) Road Layers width & thickness as follows: Width Thickness
i) Subgrade 7.50 m 500 mm
ii) Granular Sub-base 7.50 m 150mm mm
iii) Wet Mix Macadam 7.50 m 250mm mm
iv) Dense Bitumen Macadam 7.50 m 50mm mm
v) Semi Densed Bituminous Concrete 7.50 m 25mm mm
2 Road - 24.0m wide ### per Km
Detail of Road Sections:
a) Road width 24 m
b) Carriageway width 12.5 m
c) Width of Shoulder & Utilities 5.75 m
d)Road Layers width & thickness as follows: Width Thickness
i) Subgrade 12.5 m 500mm mm
ii) Granular Sub-base 12.5 m 200mm mm
iii) Wet Mix Macadam 7.5 m 250mm mm
iv) Dense Bitumen Macadam 7.5 m 50mm mm
v) Semi Densed Bituminous Concrete 7.5 m 25mm mm
3 Road - 31.0m wide ### per Km
Detail of Road Sections:
a) Road width 31 m
b) Carriageway width 15 m
c) Width of Shoulder & Utilities 8m
d) Road Layers width & thickness as follows: Width Thickness
i) Subgrade 7.5 m 500mm mm
ii) Granular Sub-base 7.5 m 200mm mm
iii) Wet Mix Macadam 7.5 m 250mm mm
iv) Dense Bitumen Macadam 7.5 m 50mm mm
v) Semi Densed Bituminous Concrete 7.5 m 25mm mm
4 Road - 43.0m wide ### per Km
Detail of Road Sections:
a) Road width 43 m
b) Carriageway consists RHS &LHS sides, One way width 7.5 m
c) Width of Shoulder & Utilities 12.5 m
d) Median width (provided with Kerb) 3m
e) Road Layers width & thickness as follows: LHS Width Thickness
i) Subgrade 7.5 m 500mm mm
ii) Granular Sub-base 7.5 m 230mm mm
iii) Wet Mix Macadam 7.5 m 250mm mm
iv) Dense Bitumen Macadam 7.5 m 50mm mm
v) Semi Densed Bituminous Concrete 7.5 m 25mm mm
f) Road Layers width & thickness as follows: RHS Width Thickness
i) Subgrade 7.5 m 500mm mm
ii) Granular Sub-base 7.5 m 230mm mm
iii) Wet Mix Macadam 7.5 m 250mm mm
iv) Dense Bitumen Macadam 7.5 m 50mm mm
v) Semi Densed Bituminous Concrete 7.5 m 25mm mm
5 Road - 53.0m wide ### per Km
Detail of Road Sections:
a) Road width 53 m
b) Carriageway consists RHS &LHS sides, One way width 11 m
c) Width of Shoulder & Utilities 12.5 m
d) Median width (provided with Kerb) 6m
e) Road Layers width & thickness as follows: LHS Width Thickness
i) Subgrade 11.0 m 500mm mm
ii) Granular Sub-base 11.0 m 230mm mm
iii) Wet Mix Macadam 11.0 m 250mm mm
iv) Dense Bitumen Macadam 11.0 m 50mm mm
v) Semi Densed Bituminous Concrete 11.0 m 40mm mm
f) Road Layers width & thickness as follows: RHS Width Thickness
i) Subgrade 11.0 m 500mm mm
ii) Granular Sub-base 11.0 m 230mm mm
iii) Wet Mix Macadam 11.0 m 250mm mm
iv) Dense Bitumen Macadam 11.0 m 50mm mm
v) Semi Densed Bituminous Concrete 11.0 m 40mm mm
Note: Same section at RHS

6 Road - 68.0m wide ### per Km


Detail of Road Sections:
a) Road width 68 m
b) Carriageway consists RHS &LHS sides, One way width 11 m
c) Service lane on both side, one side width 7.5 m
d) Width of Shoulder & Utilities 9.5 m
f) Central Median width (provided with Kerb) 6m
g) Width of median between main carriage way & service lane (both side) 3m
provided with kerb
e) Road Layers width & thickness considered : LHS - Main Carriage way Width Thickness
i) Subgrade 11.0 m 500mm mm
ii) Granular Sub-base 11.0 m 230mm mm
iii) Wet Mix Macadam 11.0 m 250mm mm
iv) Dense Bitumen Macadam 11.0 m 50mm mm
v) Semi Densed Bituminous Concrete 11.0 m 25mm mm
f) Road Layers width & thickness considered : RHS - Main Carriage way Width Thickness
i) Subgrade 11.0 m 500mm mm
ii) Granular Sub-base 11.0 m 230mm mm
iii) Wet Mix Macadam 11.0 m 250mm mm
iv) Dense Bitumen Macadam 11.0 m 50mm mm
v) Semi Densed Bituminous Concrete 11.0 m 25mm mm
g) Road Layers width & thick as follows: LHS - Service Road Width Thickness
i) Subgrade 0.0 m 500mm mm
ii) Granular Sub-base 0.0 m 230mm mm
iii) Wet Mix Macadam 0.0 m 250mm mm
iv) Dense Bitumen Macadam 0.0 m 50mm mm
v) Semi Densed Bituminous Concrete 0.0 m 25mm mm
h) Road Layers width & thickness as follows: RHS - Service Road Width Thickness
i) Subgrade 7.5 m 500mm mm
ii) Granular Sub-base 7.5 m 230mm mm
iii) Wet Mix Macadam 7.5 m 250mm mm
iv) Dense Bitumen Macadam 7.5 m 50mm mm
v) Semi Densed Bituminous Concrete 7.5 m 25mm mm
Note: Same section at RHS
Remarks

Between ROW

Each side
Between ROW

Each side
Between ROW
Each side
Between ROW
on Each side (7.5mx2=15.0m)
Each side
Between ROW
On Each side (11mx2=22.0m)
Each side
Between ROW
on Each side (11mx2=22.0m)
on Each side (7.5mx2=15.0m)
Each side

Each side (3.0mx2=6.0m)