DIGITAL SOLUTIONS
Synergi Plant
One view to RBI, RCM, SIL, Inspections & Health of your Oil & Gas facilities
Saikat Ray Choudhury, Senior Project Manager
15 August 2019
Service Class
PM Schedule
Select An asset
In Asset
Management, Pm
program tab use
insert menu option
Use Series
Required option to
generate all cycles
at once
Adhoc creation of
schedule is also
PM schedules are possible
generated in PM
schedule tab
In case data
coming from SAP,
the corresponding
PM Schedules WO too will be
5 DNV GL © 2014 15 August 2019 available
PM Program
▪ Tree view by
– Anomaly overdue
– PM overdue
Assign Workpack
Register workpack
number
Workscope Creation
Checklist
preparation for Workpack
setup
UTWT inspection Checklist
Do
Workpack Data Workpack & PM
calcula 100 90 80 Entry
tion completeness &
Schedule
traccking COMPLETE
12 DNV GL © 2014 15 August 2019
Monitored Data entry screen
Possible to configure multiple asset levels at which data can be visible and one
asset level for recording.
Select Mandatory
columns
Facility Management
Assessment
Attach Documents
in Document Tab
If Anomaly
Exists
SAVE
Y N
Click on Anomaly
button to generate
Anomaly number
Recommendation
tab gets enabled
for editing Select Assessor
In the Signatories
Tab, Distribution
section Select Approver
Save
Maintenance,
operation tabs get
enabled for data
entry
Save Save
Layout Design
Formatted Key
Safety Integrity Level Maintenance Maintenance
Maximo Interface
(SIL) Packaging Recording
Data Loading
Data Logger Interface
PSV Management Reliability, Availability
Maintenance Detail Maintenance Security and
and Maintainability
(RAM)
Scope Attachment Admin
Scada / MES Interface
www.dnvgl.com