Documente Academic
Documente Profesional
Documente Cultură
B) Material required for day to day running of plant considering 175 bottels of 20 lits per
day
c) Cost of material to be stored as preventive measure in oredr to run the plant without
shut down for one year .
Cost analysis
A ) Capital Cost
Item no.
Item no. Item description Approximate cost