Particulars Details
A Salient Features
1 Project Name
2 Authority Name (NHAI/State Authority)
3 Project type (Toll/Annuity/Hybrid Annuity)
4 Concession period
5 EPC Contractor Name
6 SPV Name
7 Promoter Name
8 Appointed date
9 SCOD/COD
B Project Brief
1 Length (in Km)
2 Width (in m) including paved shoulder
3 Nos. of Lanes
4 No. of Tolls with tollable lengths (in Nos.)
5 Length of Service road (in Km)
6 Width (in m)
Planned in month % Achieved in month % Cumulative planned till month (%) Cumulative
achieved till
C Progress Status month (%)
1 Physical progress
2 Financial progress
3 Milestones Status Schedule date Actual Achieved date Targeted date
Milestone-I
Milestone-II
Milestone-III
Milestone-IV
E Land status
1 Required Land (in Ha)
2 Available Land (La)
3 Forest land (Ha)
4 Private Land (Ha)
5 Expected date for 100% LA
G CA obligation
B Project Brief
1 Length (in Km)
2 Width (in m) including paved shoulder
3 Nos. of Lanes
4 No. of Tolls with tollable lengths (in Nos.)
5 Length of Service road (in Km)
6 Width (in m)
7 Daily Traffic in PCU
8 AADT traffic in PCU
D Key CA obligation
G Homogeneous Section (FWD) LHS RHS Designed MSA (LHS) Designed MSA (RHS)
Section-1 in Km
Section-2 in Km
Section-3 in Km
Section-4 in Km