This operating procedure describes the standard and reliable operating guidelines to
safely start the HP Feed Water System leading to its normal operation resulting in the
optimum performance within specified operating limits. This procedure also covers the
shutdown of HP Feed Water System.
2. REFERENCE
3.PREREQUISITE
The following precautions and limitations apply specifically to the operation of the Feed
Water System.
Exposed parts of all rotary equipment must be guarded properly.
All the manhole covers of DA & HP Drums are properly secured.
All personnel working on Feed water system should be familiar with the following:
Equipment Operating Procedures
Evacuation Procedures
Leak/Spill Emergency Response Procedures
First Aid and Rescue Procedures
Location and use of Fire Fighting Equipment
Proper Use of Protective Clothing
Proper Use of Breathing Apparatus
Location of safety showers and eyewash stations
Prearranged Procedures for Emergency Medical Care
CAUTION
In addition to the items listed above, it is expected that the Operator exercise common
sense, safety considerations, and industry acceptable techniques when operating plant
equipment.
1x22 MW
Operation Department
Cogeneration
Chanar Energy DOC #: CEL/OPS/SOP-04
Limited
Feed Water System
6.PROCEDURE
6.2. STARTING
Note:
Following series of permissive checks will be initiated when start up pulse to
Motor is given
DA Level > 35%
HP Feed water pump inlet valve opened.
HP Feed water pump outlet MOV closed.
HP Feed water pump bearing temperature < 100 oC
HP Feed water motor bearing temperature < 135 oC
HP Feed water pump motor winding temperature < 150 oC
Cooling water pressure >2 bar.
Suction DP<1500 mmH2O
Note:
Coordinate with chemical section for sampling and chemical dosing. Start Dosing pumps
as per requirement and adjust the dosing rate as per instructions of the Chemist.
Note:
Coordinate with chemical section for sampling and chemical dosing. Start Dosing pumps
as per requirement and adjust the dosing rate as per instructions of the Chemist.
6.3. SHUTDOWN
7.SUPPLEMENTAL ACTIONS
NA
8.APPENDICES
8.1 APPENDIX-1 Pre start check list for valves line up.
8.2 APPENDIX-2 Pre start check list for instrumentation.
8.3 APPENDIX-3 Pre start check list for Electrical distribution.
8.1 APPENDIX-I
FREQUENCY
NOTE
The valve type will determine the required position. If it is a manual valve, the position
will either be designated as open or close. If it were a Motor-Operated valve, the
position would reflect both the control status and the valve position (e.g. auto open,
SR.
DESCRIPTION STATUS
#
DA system isolation valve list
1 Condensate line drain valve CLOSE
2 Condensate line vent valve CLOSE
3 DA drum LCV upstream valve OPEN
4 DA drum LCV downstream valve OPEN
5 DA drum LCV by pass valve CLOSE
8 DA drum water sampling valve OPEN
9 Isolation valve to HP feed water pumps OPEN
10 DA chemical dosing valve OPEN
FREQUENCY
NOTE
Verify that following instruments are in place, lined up and their cables connected.
SR DESCRIPTION STATUS
NO.
HP System Instrumentation
1 HP drum feed water flow Normal
2 HP feed water temp. Normal
3 HP feed water press. Normal
4 Press. After HP feed water CV Normal
5 HP economizer inlet temp. Normal
6 HP economizer outlet temp. Normal
7 HP drum press. Normal
8 HP drum level Normal
9 HP main steam temp. Normal
10 HP main steam press. Normal
11 HP main steam flow Normal
DA System Instrumentation
1 condensate water pressure Normal
2 condensate water temperature Normal
3 DA drum inlet flow Normal
4 DA drum inlet pressure Normal
5 DA drum inlet temperature Normal
6 DA pressure Normal
7 DA drum level Normal
8.3 APPENDIX-III
NOTE
Verify that following circuit breakers are RACKED IN, switched ON and their controls
selected on REMOTE