Sunteți pe pagina 1din 37

INDEX

Mooring Diagram Mooring Arrangement

Mooring Wire, Tails


Mooring Links
& Spare.

Mooring Ropes & Spares Other Wires

Lifting Gear Monthly Inspection Tail Usage 1

Tail Usage 2
Guidance on Diameter
Measurement

Guidance on Broken Wire


Measurement

Guidance on Corrision
Measurement

Guidance on Overall Assessment


Quality Assurance into the
21st Century and beyond
Mooring Diagram
TSM Form
No. 067M

Input Ship's Specific Arrangement

HEAD
LINES WINDLASS,WITH
SPM 2 WIRE DRUMS;
ARRANGEMENT BHC : 64 T

MOORING WINCH, WITH 2


WIRE DRUMS; BHC
: 64 T
W2 W1
CHAIN STOPPER;
SWL - 200 T

M1
BREAST LINES
PEDESTAL ROLLER; SWL
- 44 T

SPRINGS M2

ETA BIT SWL:200T

CLOSED CHOCK; SWL -


64 T
MANIFOLD
MANIFOLD

NO. 1 LINE

CLOSED CHOCK; SWL -


64 T

CLOSED CHOCK; SWL


: 200 T

CLOSED CHOCK; SWL -


SPRINGS
40 T
M3

MOORING BITS; SWL :


92 & 64T

ACCOMODATION MOORING BITS; SWL


:25 T
BREAST

LINES M4
STAG HORN BOLLARD;
M5 ETA M6
SWL : 25 T

PEDESTAL ROLLER; SWL


- 64 T

STERN
LINES
CONTROLLED Revision: 01 Dec 2017
Approved by DPA/DMR
Page 1 of 1
HOME
Revision: 01 Dec 2017
Approved by DPA/DMR
Mooring Arrangement

M/T
m/t "GLEN MAYE" MOORING
MOORING
ARRANGEMENT
ARRANGEMENT
fairleads nos. 12 11 10 9 8 7

16

15 V 3 2 1 V
ACCOMMODATION

CL

14
V 3 2 1 V
13

fairleads nos. 12 11 10 9 8 7

Dimensions: Mooring: Manifolds:


Length overall 243.80 m Mooring wires forecastle 80 T Number and size per s
Length between PP 234.00 m Mooring wires fwd main deck 80 T Bridge front to mid po
Moulded breadth 42.00 m Mooring wires aft main deck 80 T Bow to mid point mani
Moulded depth 21.50 m Mooring wires poop 80 T Parallel body fwd to m
Distance bow to bridge 203.6 m Tail rope forecastle 124 T Parallel body aft to mi
Distance bridge to stern 40.2 m Tail rope fwd main deck 124 T Parallel body fwd to m
Parallel body (normal ballast) 118.1 m Tail rope aft main deck 124 T Parallel body aft to mi
Parallel body (summer DWT) 131.7 m Tail rope poop 124 T Keel to manifold
Mooring links 160 T Main deck to top of Ra
Mooring Winches, Bitts, Fairleads: Mooring ropes fwd NA T Spill tank to manifold
Mooring winches heaving power 15.9 T Mooring ropes poop NA T Manifold to ship's rail
Mooring winches brake capacity 64 T Manifold to manifold
Mooring winches hauling speed 15 m/min Manifold to vapour ma
Mooring winch brakes test date 31 Oct 2017
Closed fairleads 117 T
Mooring Bitts 92 & 64 T
Rollers 44 T
SPM closed fairleads 250 T
SPM Bollard NA T
SPM chain stoppers,Tongue Type 250 T
SPM fairleads to stoppers brackets 3250 mm
Between SPM fairleads 2000 mm

CONTROLLED
Quality Assurance into the
21st Century and beyond

TSM Form
No. 067 M

G ARRANGEMENT
6 5 fairleads nos.

4
3

CL

6 5 fairleads nos.

Number and size per side 3 X 16 "


Bridge front to mid point manifold 83.6 m
Bow to mid point manifold 120 m
Parallel body fwd to mid point manifold (SBT) 60.3 m
Parallel body aft to mid point manifold (SBT) 57.8 m
Parallel body fwd to mid point manifold (S DWT) 60.6 m
Parallel body aft to mid point manifold (S DWT) 71.10 m
Keel to manifold 23.4 m
Main deck to top of Rail 1200 mm
Spill tank to manifold 900 mm
Manifold to ship's rail 4400 mm
Manifold to manifold 2500 mm
Manifold to vapour manifold 4000 mm

Revision: 01 Dec 2017


Approved
ApprovedbybyDPA/DMR
DPA/DMR
Page
Page11ofof11
HOME
Quality Assurance into the
21st Century and beyond
Mooring Wire,Tails & Spare Record
TSM Form
No. 067 M

Monthly Check Date


M/T 30-Apr-19
Wire Specification Monthly Inspection Thorough Inspection Result (Bi-Annually or as per Section 7.5)
End-to End / Overall Location of
Tag Length Wire Wire Wire Dia. / lubric Date Received Installed / In End-to End / Due Date For inspection Broken Wires Corrision (in Deformation (in
Equipment / Storage Location Po No. Supplier Material core Construction MBL (T) Certificate No. Reversed Actual Cond. Inspection Due Diameter (in %) Assessment (in Maximum Remarks
No. mtr Termination Lay CIRC. ant On-Board Use Reversal Due Discarding Date (in %) %) %)
Date %) deterioration
MANHO ROPE & DRAWN
217.80
1 PORT OUT FWD 250 M GALVANIZE IWRC 6XWS36 IWRC 34 MM 80 T BUS 140042017 A3 23-Aug-12 23-Aug-17 6-Jan-18 23-Aug-22 Satisfactory 24-Sep-18 24-Mar-19 0 0 0 20 20
MM
WIRE PTE LTD D
MANHO ROPE & DRAWN
217.80
2 PORT IN FWD 250 M GALVANIZE IWRC 6XWS36 IWRC 34 MM 80 T BUS 140042018 A3 24-Aug-12 24-Aug-17 6-Jan-18 24-Aug-22 Satisfactory 24-Sep-18 24-Mar-19 0 0 0 20 20
WIRE PTE LTD MM
D
MANHO ROPE & DRAWN
217.80
3 STBD IN FWD 250 M GALVANIZE IWRC 6XWS36 IWRC 34 MM 80 T BUS 140042019 A3 25-Aug-12 25-Aug-17 6-Jan-18 25-Aug-22 Satisfactory 24-Sep-18 24-Mar-19 0 0 0 20 20
WIRE PTE LTD MM
D
MANHO ROPE & DRAWN
217.80
4 STBD OUT FWD 250 M GALVANIZE IWRC 6XWS36 IWRC 34 MM 80 T BUS 140042020 A3 01-Sep-12 1-Sep-17 6-Jan-18 01-Sep-22 Satisfactory 24-Sep-18 24-Mar-19 0 0 0 20 20
MM
WIRE PTE LTD D
GALVANIZE
5 STBD OUT AFT DSR WIRE 250 IWRC 217 MM 34 MM 79.9 T 1310-Do636-01 A2 01-Sep-14 1-Sep-19 6-Jan-18 01-Sep-24 Satisfactory 24-Sep-18 24-Mar-19 0 0 0 20 20
MOORING WIRES ON WICNH

D
GALVANIZE
6 STBD IN AFT DSR WIRE 250 IWRC 217 MM 34 MM 79.9 T 1310-Do636-02 A2 01-Sep-14 1-Sep-19 6-Jan-18 01-Sep-24 Satisfactory 24-Sep-18 24-Mar-19 0 0 0 20 20
D 3
GALVANIZE
2 1
7 MID STBD OUT AFT GAYLIN PTE LTD 250 IWRC 217 MM 34 MM 82.2 T AB 2587-01 A2 01-Sep-14 1-Sep-19 6-Jan-18 01-Sep-24 Satisfactory 24-Sep-18 24-Mar-19 0 0 0 20 20 4
D
GALVANIZE
8 MID STBD IN AFT GAYLIN PTE LTD 250 IWRC 217 MM 34 MM 82.2 T AB 2587-02 A2 01-Sep-14 1-Sep-19 6-Jan-18 01-Sep-24 Satisfactory 24-Sep-18 24-Mar-19 0 0 0 20 20
D 5
GALVANIZE
9 PORT OUT AFT GAYLIN PTE LTD 250 IWRC 217 MM 34 MM 82.2 T AB 2587-03 A2 01-Sep-14 1-Sep-19 6-Jan-18 01-Sep-24 Satisfactory 24-Sep-18 24-Mar-19 0 0 0 20 20
D
GALVANIZE 6
10 PORT IN AFT GAYLIN PTE LTD 250 IWRC 217 MM 34 MM 82.2 T AB 2587-04 A2 01-Sep-14 1-Sep-19 6-Jan-18 01-Sep-24 Satisfactory 24-Sep-18 24-Mar-19 0 0 0 20 20
D
11 0 0 0 0 0
12 0 0 0 0 0 7
13 0 0 0 0 0 8
14 0 0 0 0 0
15 0 0 0 0 0 9
16 0 0 0 0 0
10
17 0 0 0 0 0
18 0 0 0 0 0
19 0 0 0 0 0
20 0 0 0 0 0
1
2
3
4
5
6
7
MOORING TAILS

8
9 11
10 12
11 13
12 14
13
14
15
16
17
18
19
20
A
SPARE MOORING WIRES / TAILS

B
C
D
E
F 15
G
H 16
I
J
K
L 20 19 18 17
M
N

CONTROLLED Revision: 01 Dec 2017


Approved by DPA/DMR
Page 1 of 1
Quality Assurance into the
21st Century and beyond
Mooring Links
TSM Form
No. 067M

Monthly Check Date 30-Apr-19 HOME


MOORING LINKS
Equipment / Storage Supplier Date Received Type / Equipment /
Tag No. PO No. Date Installed Cert No Distiguish No or Mark MBL (T) SWL (T) Condition
location onboard Model location

1
2
3
4 4 3 2
5
6 5
7 6
8
9 7
10 8
11
12 9
13 1
14
15
16
17
18
IN USE

19
20
A
B
C
SPARE

D
E
F
G
H 13
14

1
5
1

20 19

CONTROLLED Revision: 01
Approved by
2 1

9
1

11
12

1
5
1

18 17

Revision: 01 Dec 2017


Approved by DPA/DMR
Page 1 of 1
Quality Assurance into the
21st Century and beyond

Mooring Rope & Spare Rope Record TSM Form


No. 067M

Monthly Check Date 30-Apr-19 HOME


M/T .
Date Received Length Rope Dia. / Installed / In End-to End / Date
Tag No. Equipment / Storage Location Po No. Supplier Material Construction MBL (T) Certificate No. lubricant Cond. Remakrs
On-Board mtr CIRC. Use Reversed Discarded

1
2
3 STBD IN FWD
4 STBD OUT FWD
5 STBD OUT AFT 12,2018 11 Polypropylene M/s Axiom 9" GLIS/17/RR/612/0 Just change 29.12.2018
MOORING ROPE ON WINCH

6 STBD IN AFT 12,2018 11 Polypropylene M/s Axiom 9" GLIS/17/RR/612/0 Just change 29.12.2018
7 24.04.19 10" 4 3 2 1
8
9 5 18 17
10 6
11
12 7
13 8
14
15
16
17
18
19
20
MR1
MR2
MR3
MR4
MIX GLIS/17/JT/444/1- 08 MARCH 18 /IN
MR5 PORT FWD SPRING WINCHES 0860-16-10098-409 01-Dec-17 220 POLYPROPYLEN 8 STRAND ROPE
7" 63.2 T 16-Jan-19 Good Swap from MW no. 7
31 USE
E
MIX 08 MARCH 18 /IN
GLIS/17/JT/403/3-
MR6 PORT FWD SPRING WINCHES 0860-16-10098-409 01-Dec-17 220 POLYPROPYLEN 8 STRAND ROPE 7" 63.2 T 16-Jan-19 Good Swap from MW no. 8
25
E USE
MOORING ROPE ON DECK

MIX 08 MARCH 18 /IN


GLIS/17/JT/503/3-
MR7 PORT FWD BREAST LINE WINCHES 0860-16-10098-409 01-Dec-17 220 POLYPROPYLEN 8 STRAND ROPE 7" 63.2 T 16-Jan-19 Good Swap from MW no. 5
34
E USE
MIX GLIS/17/JT/444/1- 08 MARCH 18 /IN
MR8 PORT FWD BREAST LINE WINCHES 0860-16-10098-409 01-Dec-17 220 POLYPROPYLEN 8 STRAND ROPE 7" 63.2 T
42 USE
16-Jan-19 Good Swap from MW no. 6
E
MIX GLIS/17/JT/403/3- 08 MARCH 18 /IN
MR9 PORT AFT BREAST WINCHES 0860-16-10098-409 01-Dec-17 220 8 STRAND ROPE 7" 63.2 T 24-Oct-18 Good
POLYPROPYLEN 21 USE
E
MIX GLIS/17/JT/403/3-
MR10 PORT AFT BREAST WINCHES 0860-16-10098-409 01-Dec-17 220 POLYPROPYLEN 8 STRAND ROPE 7" 63.2 T 16 JAN 19 /IN USE Good Change with spare New from SG Store.
08 09
MR11 E
MR12 10
MR13
MR14
MR15
MR16
MR17
MR18
MR19
MR20
MIX GLIS/17/JT/403/3- 08 MARCH 18 /IN
S1 POOP DECK MID 0860-16-10098-409 01-Dec-17 220 8 STRAND ROPE 7" 63.2 T 11-Oct-18 Good Switched from MW No. 10
STS ROPES

POLYPROPYLEN 29 USE
MIX GLIS/17/JT/403/3-
S2 POOP DECK MID 0860-16-10098-409 01-Dec-17 220 POLYPROPYLEN 8 STRAND ROPE 7" 63.2 T
40
Good
S3 E
S4
SP1
SP2
SP3
SPARE MOORING ROPE

SP4
SP5
SP6 11
SP7
SP8 12
SP9
SP10
SP11
SP12 16 15 14 13
SP13
SP14

CONTROLLED Revision: 01 Dec 2017


Approved by DPA/DMR
Page 1 of 1
Quality Assurance into the
21st Century and beyond
OTHER WIRE RECORD
TSM Form
No. 0 67 M
HOME

M/T Monthly Check Date 30-Apr-19


Wire Specification Monthly Check Thorough Inspection Result (Bi-Annually or as per Section 7.5)
Whether
Broken Overall Location of
Finish (Uncoated Length Rotation / Wire Wire Dia. / Date Received Installed / In End-to End / Due Date For inspection Diameter Corrision (in Deformation (in
Tag No. Equipment / Storage Location Maker Model Wire Duty Po No. Supplier Material core Construction Wire Lay MBL (T) Certificate No. lubricant Cond. inspection Due Wires (in Assessment (in Maximum Remarks
/ Galvanised) mtr Non- Termination CIRC. On-Board Use Reversed Discarding Date (in %) %) %)
%) %) deterioration
Rotation
LIFTING GEAR (Deck) including hose handling crane,

GALVANIZED NON 140.50


1 Hose handling Crane MID Manho Rope & Wire Ltd GALVANIZED MR1612/25 Manho Rope & Wire Ltd 2000 IWRC 4XSES39 20 MM 28 1CMLC601934 A2 18-Nov-17 20-Nov-17 20-May-20 Good 12/10/18 12-Apr-19 0 0 0 0 0
SWAGED ROTATION MM
DRAWN NON 6XWS36
2 ENGINE PART HANDLING CRANE PORT KISWIRE SDN BHD GALVANIZED 84721 KISWIRE SDN BHD 5000 FT GALVANIZED
IWRC 114,68 18 MM 26 201702WRM0003 A3 18-Nov-17 20-Nov-17 20-May-20 Good 12/10/18 12-Apr-19 0 0 0 0 0
ROTATION IWRC
cargo cranes, bunker davits etc.

STEEL
GALVANIZED NON
3 Provision Crane Stbd. CHUNGWOO ROPE GALVANIZED CT1666/02 CHUNGWOO ROPE 2000 IWRC 4XSES39 63,3 8,16 4,9 F138-16002-07 1-Mar-17 01-Sep-19 Good 12/10/18 12-Apr-19 0 0 0 0 0
SWAGED ROTATION
4 0 0 0 0 0
5 0 0 0 0 0
6 0 0 0 0 0
7 0 0 0 0 0
8 0 0 0 0 0
9 0 0 0 0 0
10 0 0 0 0 0
11 0 0 0 0 0
12 0 0 0 0 0
13 0 0 0 0 0
14 0 0 0 0 0
15 0 0 0 0 0
crane, elevator
LIFTING GEAR

16 0 0 0 0 0
Accommodati including ER
(Eng. Room)

17 0 0 0 0 0
etc.

18 0 0 0 0 0
19 0 0 0 0 0
20 Engine Room Crane 0 0 0 0 0
21 Gangway Port 13-Mar-19 13-Mar-20 13-Sep-19 0 0 0 0 0
Gangway /

on Ladder

22 Gangway Stbd. 11-Mar-19 11-Mar-20 11-Sep-19 0 0 0 0 0


23 Accommodation Port 13-Mar-19 13-Mar-20 13-Sep-19 0 0 0 0 0
24 Accommodation Stbd. 11-Mar-19 11-Mar-20 11-Sep-19 0 0 0 0 0
25 0 0 0 0 0
Davits for L/Boat, Recsue Boat

26 0 0 0 0 0
27 0 0 0 0 0
28 0 0 0 0 0
29 0 0 0 0 0
& L/Rafts

30 0 0 0 0 0
31 0 0 0 0 0
32 0 0 0 0 0
33 0 0 0 0 0
34 0 0 0 0 0
35 0 0 0 0 0
36 0 0 0 0 0
FIRE WIRE /

37 0 0 0 0 0
ETA

38 0 0 0 0 0
39 0 0 0 0 0
40 0 0 0 0 0
41 0 0 0 0 0
lifeboat lashings, anchor
WIRE LASHING including

42 0 0 0 0 0
43 0 0 0 0 0
lashings etc.

44 0 0 0 0 0
45 0 0 0 0 0
46 0 0 0 0 0
47 0 0 0 0 0
48 0 0 0 0 0
49 0 0 0 0 0
50 0 0 0 0 0
51
52
53
54
55
SPARE WIRES

56
57
58
59
60
61
62
63
64
Enclosed tables to serve as guidance and should be implemented regardless of wire condition. However, the Master's are requested to renew the wire,
whenever same was found to be deteriorated.
Regulation Action Required Range
Mooring Wire reversing end-to-end 60 Mth
Mooring Wire to be replaced 120 Mth
v Renewal interval should be shortened if manufacturer’s recommendations advise so. Mooring wire tail to be replaced 18 Mth
v Renewal should be carried out earlier, based on routine examination, if deterioration / Gangway wires replacement interval * 12 Mth
damages are beyond acceptance criteria. Deck Cranes - Provision, Hose Handling, Cargo 30 Mth
Engine Room Crane 60 Mth
Davit for L/Boat, Rescue Boat & L/Rafts 30 Mth

CONTROLLED Revision: 15 Sep 2017


Approved by DPA/DMR
Page 1 of 1
Quality Assurance into the
LIFTING GEAR MONTHLY 21st Century and beyond

RECORD TSM Form


No. 0 67M
YEAR: 2019
M/T MONTHLY INSPECTION RECORD of LIFTING GEAR EQUIPMENT

No. Wire / Schackles Qty Maker Serial No. Jan Feb March April May June July Aug Sept Oct Nov Dec

BOLT TYPE CC1-


ANCHOR
11 CROSBY
SHACKLES, WLL : 26 Feb
1 8.5T) 2018011000032 Jan-19 2019 Mar-19
SCREW PIN CC1-
ANCHOR
4 CROSBY
SHACKLE , WLL : 26 Feb
2 6.5T 2018013100540 Jan-19 2019 Mar-19
BOW SHACKLE
DIAM 3/4, WLL 4 16 CROSBY 26 Feb
3 3/4 T Jan-19 2019 Mar-19
BOW SHACKLE
DIAM 5/8, WLL 3 1 CROSBY 26 Feb 21 Apr
4 1/4 T Jan-19 2019 Mar-19 2019
BOW SHACKLE 26 Feb 21 Apr
1 CROSBY
5 DIAM 1/2, WLL 2 T Jan-19 2019 Mar-19 2019
201706WRM0038 26 Feb 21 Apr
SLING WIRE 8 KISWIRE
6 8 Jan-19 2019 Mar-19 2019
SLING WIRE 26 Feb 21 Apr
1 UW 19960
7 WLL : 5 TON Jan-19 2019 Mar-19 2019
SLING WIRE VTC 2542/1 VTC
3 2542/2 VTC 26 Feb 21 Apr
8 WLL : 1.3 TON 2542/3 Jan-19 2019 Mar-19 2019
MOORING LINKS 26 Feb 21 Apr
6 A-3425
9 160 T Jan-19 2019 Mar-19 2019
MOORING LINK 26 Feb 21 Apr
1
10 16 T Jan-19 2019 Mar-19 2019
26 Feb 21 Apr
PEAR LINK 7,6 T 2
11 Jan-19 2019 Mar-19 2019
POLYESTER
SLING 6 MTR, 5 1 26 Feb 21 Apr
12 TON 71417 Jan-19 2019 Mar-19 2019
POLYESTER BS 3481PT21983
SLING 3 MTR, 5 2 26 Feb 21 Apr
13 TON (2017) Jan-19 2019 Mar-19 2019
POLYESTER
SLING 2,5 MTR, 3 1 BS 3481PT21983 26 Feb 21 Apr
14 TON (2014) Jan-19 2019 Mar-19 2019
POLYESTER RWGN-
LIFTING GEAR EQUIPMENT " END MONTH INSPECTION RECORD "

SLING 4 MTR, 3 1 26 Feb 21 Apr


15 TON (05.17) WBSB013 Jan-19 2019 Mar-19 2019
POLYESTER RWGN-
SLING 4 MTR, 3 1 26 Feb 21 Apr
16 TON (05.17) WBSB014 Jan-19 2019 Mar-19 2019
POLYESTER
SLING 3 MTR, 3 1 F3-003120 26 Feb 21 Apr
17 TON (11.16) Jan-19 2019 Mar-19 2019
SLING WIRE
SWL 1 TON 3 26 Feb 21 Apr
18 MTR 1 Jan-19 2019 Mar-19 2019
SLING WIRE 26 Feb 21 Apr
19 SWL 7 TON 4 Jan-19 2019 Mar-19 2019
SLING WIRE 26 Feb 21 Apr
20 SWL 2 TON 4 Jan-19 2019 Mar-19 2019
WEBSLING
1280LBS (0.5 26 Feb 21 Apr
21 TON) 1 Jan-19 2019 Mar-19 2019
CHAIN BLOCK 2 26 Feb 21 Apr
22 TON 1 Jan-19 2019 Mar-19 2019
RATCHET TIE
DOWN 12MTR 5 26 Feb 21 Apr
23 TON 1 Jan-19 2019 Mar-19 2019
RATCHET TIE
DOWN 12MTR 26 Feb 21 Apr
24 10TON 1 Jan-19 2019 Mar-19 2019
26 Feb 21 Apr
25 SAFETY BELT 5 Jan-19 2019 Mar-19 2019
26 Feb 21 Apr
26 COVER TROSS 16 Jan-19 2019 Mar-19 2019
CRANE
CONNECT LINK 26 Feb 21 Apr
27 15 TON 1 Jan-19 2019 Mar-19 2019

NEW WIRE
320X220X230mm
PARTISI
316X227mm 26 Feb 21 Apr
28 312x227mm 1 Jan-19 2019 Mar-19 2019
WEAK LINK
16750 LBS (7.5 26 Feb 21 Apr
29 TON) 2 Jan-19 2019 Mar-19 2019
SHACKLE WLL 8 -
1/2 TON 45 26 Feb 21 Apr
30 CROSBY 11 Jan-19 2019 Mar-19 2019
WEAK LINK
CROSBY WLL 1 26 Feb 21 Apr
31 1/4 TON 3 Jan-19 2019 Mar-19 2019
SHACKLE 4 3/4 26 Feb 21 Apr
32 TON 13 Jan-19 2019 Mar-19 2019
WIRE NEW 1
ROLL DATE 29-3- 26 Feb 21 Apr
33 2018 1 Jan-19 2019 Mar-19 2019
34
35
36
37
38
39
40

Monthly Inspection Record of Lifting Gear Equipment


VISUAL INSPECTION of LIFTING GEAR EQUIPMENT , LASHING SLINGS,ect.

CONTROLLED Revision: 01 Dec 2017


Approved by DPA/DMR
Page 1 of 1
Mooring Equipment a nd WiresRopes Tails Inspection Record

RECORD OF MOORING WIRES AND TAILS IN USED (page-01)


Port Date W1/ Stbd outboard/ahd W2/ Stbd inboard/ahd W3/Port inboard/ahd W4/Port outboard/ahd W5/Fwd breast/F W6/Fwd breast/A
on off dur on off dur on off dur on off dur. on off dur on off dur
MUNTOK 22-23 April 2018 10.30 10.00 23,5 10.30 10.00 23,5
MUNTOK 30-31 MAY 2018 18.00 15.54 21,9 18.00 15.54 21,9
MUNTOK 07-08 JUNE 2018 11.00 09.24 22,4 11.00 09.24 22,4
MUNTOK 24-25 JUNE 2018 12.00 15.30 27,5 12.00 15.30 27,5
MUNTOK 15-16 JUL 2018 09.12 12.36 27,4 09.12 12.36 27,4
MUNTOK 30-31 Aug 2018 12.00 13.48 25,48 12.00 13.48 25,48
MUNTOK 29-30 Sept 2018 18.30 17.00 22,3 18.30 17.00 22,3
MUNTOK 30-31 Oct 2019 14.30 20.30 30 14.30 20.30 30
MUNTOK 27-28 Nov 2018 15.00 17.00 26 15.00 17.00 26
MUNTOK 17-18 Dec 2018 08.30 07.30 23 08.30 07.30 23
MUNTOK 31 Jan/01 Feb 2019 07.48 06.24 22,6 07.48 06.24 22,6
MUNTOK 24-25 Feb 2019 13.00 10.30 21,5 13.00 10.30 21,5
MUNTOK 24-25 Mar 2019 11.00 16.30 29,5 11.00 16.30 29,5

CONTROLLED
Mooring Equipment a nd WiresRopes Tails Inspection Record

RECORD OF MOORING WIRES AND TAILS IN USED (page-01)


Port Date W1/ Stbd outboard/ahd W2/ Stbd inboard/ahd W3/Port inboard/ahd W4/Port outboard/ahd W5/Fwd breast/F W6/Fwd breast/A
on off dur on off dur on off dur on off dur. on off dur on off dur

TOTAL Tail Usage 0 0 0 0 0 0

Total Wire Usage


323,1 323,08 0 0 0 0

Previous tails usage record

CONTROLLED
Quality Assurance into the
21st Century and beyond

ecord
TSM Form
No. 067 M

WIRES AND TAILS IN USED (page-01)


W7/Fwd spring/F W8/Fwd spring /A remarks
on off dur on off dur

Revision: 10 Dec 2017


Approved by DPA/DMR
Page 1 of 2
Quality Assurance into the
21st Century and beyond

ecord
TSM Form
No. 067 M

WIRES AND TAILS IN USED (page-01)


W7/Fwd spring/F W8/Fwd spring /A remarks
on off dur on off dur

0 0

0 0

Chief Officer
Revision: 01 Dec 2017
Approved by DPA/DMR
Page 2 of 2
Mooring Equipment a nd WiresRopes Tails Inspection Record

RECORD OF MOORING WIRES AND TAILS IN USED (page-02)


Port Date W9/Aft spring /F W10/Aft spring/A W11/Aft breast/F W12/Aft breast/A W13/Port outboard/ast W14/Port inboard/ast W15/Stbd inboard
on off dur on off dur on off dur on off dur. on off dur on off dur on

CONTROLLED
Mooring Equipment a nd WiresRopes Tails Inspection Record

RECORD OF MOORING WIRES AND TAILS IN USED (page-02)


Port Date W9/Aft spring /F W10/Aft spring/A W11/Aft breast/F W12/Aft breast/A W13/Port outboard/ast W14/Port inboard/ast W15/Stbd inboard
on off dur on off dur on off dur on off dur. on off dur on off dur on

TOTAL Tail Usage 0 0 0 0 0 0

Total Wire Usage


0 0 0 0 0 0,0

Previous tails usage record

CONTROLLED
Quality Assurance into the
21st Century and beyond
ecord
TSM Form
No. 067 M

G WIRES AND TAILS IN USED (page-02)


W15/Stbd inboard/ast W16/Stbd outboard/ast remarks
off dur on off dur.

Revision: 01 Dec 2017


Approved by DPA/DMR
Page 1 of 2
Quality Assurance into the
21st Century and beyond
ecord
TSM Form
No. 067 M

G WIRES AND TAILS IN USED (page-02)


W15/Stbd inboard/ast W16/Stbd outboard/ast remarks
off dur on off dur.

0 0

0,0 0,0

BAQUAR ALI ISMAIL


Chief Officer
Revision: 01 Dec 2017
Approved by DPA/DMR
Page 2 of 2
Uniform decrease in diameter (expressed as
Rope Type % of nominal diameter) Severity Rating %
X%
X < 6% 0
6% ≤ X < 7% 20
Single Layer Rope 7% ≤ X < 8% 40
with Fibre Core 8% ≤ X < 9% 60
9% ≤ X < 10% 80
X ≥ 10% 100
X < 3.5% 0
Single Layer Rope 3.5% ≤ X < 4.5% 20
with Steel Core 4.5% ≤ X < 5.5% 40
Or 5.5% ≤ X < 6.5% 60
Parallel Closed Rope 6.5% ≤ X < 7.5% 80
X ≥ 7.5% 100
X < 1% 0
1% ≤ X < 2% 20
Rotation Resistant 2% ≤ X < 3% 40
Rope 3% ≤ X < 4% 60
4% ≤ X < 5% 80
X ≥ 5% 100

Local increase in diameter


Rope Type (expressed as % of nominal diameter) Severity Rating %
X%
X < 6% 0
6% ≤ X < 7% 20
7% ≤ X < 8% 40
Rope with Fibre Core
8% ≤ X < 9% 60
9% ≤ X < 10% 80
X ≥ 10% 100
X < 1% 0
1% ≤ X < 2% 20
2% ≤ X < 3% 40
Rope with Steel Core
3% ≤ X < 4% 60
4% ≤ X < 5% 80
X ≥ 5% 100

Percentage
Number of load
of Load
bearing
Bearing
wiresWires broken over a length of 30 times the nominal
Severity
ropeRating
diameter
%
N X < 0.5% 0
0.5% ≤ X < 1% 20
1% ≤ X < 1.5% 40
1.5% ≤ X < 2% 60
2.5% ≤ X < 3% 80
X ≥ 3% or if total number of wires broken is greater than 12 100
Discard
Description of location (Severity level 100%)
Straight portion that never runs through or If g/d > 1/3
around a sheave or spools on to the drum
Portion of rope that runs through a sheave or If g/d > 1/10
spools on to the drum
HOME
HOME
Condition in relation to broken wires Severity Rating %
N < 0.5% 0
Percentage of Load 0.5% ≤ N < 1% 20
Bearing Wires broken 1% ≤ N < 1.5% 40
over a length of 30 1.5% ≤ N < 2% 60
times the nominal 2.5% ≤ N < 3% 80
rope diameter, N (%) N ≥ 3%
More than 12 wires broken over a length of 30 times the rope dia
Concentrated wire breaking 100
More than 6 wires broken over a length of 6 times the rope dia
More than two wires broken at the termination
HOME
Condition
External Corrosion
Signs of surface oxidation, but can be wiped clean (superficial)

Oxidation on wire surface. Surface rough to touch

Surface greatly affected by Oxidation, starting to pit

Surface heavily pitted and wires quite slack, gaps between wires
Internal Corrosion
Corrosion debris exuding from the valleys between outer strands
Severity Rating %

HOME

0%

40%

60%

100%
100%
Application
Gangway / Accommodation
Ladder
Davits for Life boats, Rescue
Boats and Life Rafts
Deck Cranes - Provision, Hose
Handling, Cargo
Engine Room Cranes
Mooring Wire Hawsers
Mooring Wire Tails

Maximum Cumulative Severity


of Deterioration
0%, 20%, 40% or 60%

80%

100%

S-ar putea să vă placă și