Sunteți pe pagina 1din 4

www.downloadmela.

com

MECHANICAL ENGINEER

NAME : AJESH

NATIONALITY : INDIAN
E-MAIL ID :
MOBILE NO. :
QUALIFICATION :

BACHELOR DEGREE IN MECHANICAL ENGINEERING – (B tech)

Additional Technical Qualifications:

1. ASNT Level II in Radiography Testing (RT)

2. ASNT Level II in Magnetic Particle Testing (MPT)

3. ASNT Level II in Penetrant Testing (PT)

4. ASNT Level II in ultrasonic Testing (UT)

PERSONAL DATA

NAME

FATHER NAME

PERMANENT ADDRESS :

PRESENT ADDRESS :
SEX :

AGE & DATE OF BIRTH :

NATIONALITY : INDIAN.

RELIGION : HINDU.

MARITAL STATUS : SINGLE

LINGUISTICS : (TO SPEAK, WRITE/READ)

1. MALAYALAM
2. ENGLISH
3. HINDI
www.downloadmela.com

STRENGTH : AMBITIOUS, HARD WORKING, POSITIVE ATTITUDE.


PASSPORT NO : G 3769737
DATE OF ISSUE : 23/08/2007
DATE OF EXPIRY : 22/08/2017

Educational Qualification

 B.TECH in Mechanical engineering with 69% aggregate from GOVT. College of


Engineering,Kannur .

 12th (2000-2002) under Kerala State Board of Secondary Education with 80.3%
from G.V.H.S. School Madapally.
 
 10th (2000) under Board of Public Examination with 83% aggregate from
St.George High school Vilangd.

Experience:

Overall Experience of 3 Years in the Petrochemical Piping, Quality Assurance, Quality


control activities in Construction Projects.

Projects :

(A) JAMNAGAR PETROCHEMICAL COMPLEX


- Company :Neo Strcuto construction PVT.Ltd
- Client : RELIANCE
- Position : PIPING ENGINEER

- Period : 2007 JUNE TO 2008 JULY

THE JOB INVOLVED


- Monitored piping materials take off, pre-fabrication and piping erection
activities.

- Planning & scheduling of construction activities according to work front


requirement

- Allocation of Material, Man power and Equipment for daily work activities

- Preparation and assessment of daily progress report and coordinating progress


review meetings.

(B) SAUDI KAYAN PHENOLICS PROJECT, Jubail, K S A


- Company : Nasser-S-Alhajri corporation Ltd.
- Client : SABIC
www.downloadmela.com

- Position : QA/QC ENGINEER(PIPING, WELDING,


INSULATION & STEAM TRACING)

- Period : 2008 OCTOBER to 2009 OCTOBER

THE JOB INVOLVED:

- Preparation of Inspection and Test Plans and formats.

- Material Inspection and Test Certificates Verification.

- Inspection of Piping System wise and conform it is according to P&ID, Isometric


Drawings.

- Monitoring of Welding Consumables, Preheating, Welding and Weld Visual


Inspection, PWHT / NDT / Hardness Test, PMI Test as per the WPS, 1TP.

- Capable of investigating causes for Failure in Welding, Painting and Hydro


testing and Propose Rectifications in accordance with the applicable standards.

- Inspection and Clearance of Fit up, Weld Visual of all piping under ground, above
Ground Piping and In Process Inspection.

- Conducting and Interpretation of Radiography Examination, Penetrant


Examination and Ultrasonic testing.

- Regular Monitoring and Reviewing of Calibrated Measuring and Test Instruments


and Maintaining Records, Including Recalibration.

- Attending weekly Meetings with Client, Co-Ordination with Client for Technical
Discrepancies.

- Carry out Inspection works after taking Relevant Safety Permits from the Client
and follow the Company HSE Policies. Submission of Weekly quality Report With
respect of all activities. Checking of Test Pack and Final Documental

- Managing the Insulation activities done by CAPE RB HILTON LTD.

- Check the clearance between insulation and adjacent surface.

- Check the thickness of insulation material installed.

- Check correct banding and springs are used and applied at proper intervals.

- Check proper use of mastic materials.

- Visual checking of general appearance of installed insulation.

- The steam tracing system shall be inspected visually only before installation of
insulation.
www.downloadmela.com

- Cracks and flattering of steam tracing tube is checked while bending.

- Checking the correct installation of steam tracing tube.

( C ) GREEN DIESEL PROJECT ,RUWAIS,UAE.

- Company :Target Engineering & Construction Company(W.L.L)

- CLIENT :TAKREER .

- Position : PIPING ENGINEER

- Period : 2010 MAY to Till DATE

THE JOB INVOLVED:

- Preparation of Hydro Test package.

- Preparation of Tie-In package.

- Co-ordination of Pre-Punch Activities.

- Co-ordination of Hydro Test activities at site.

- Designing of manifolds.

- Calculation of water volume required for hydro test.

- Co-ordination of Precommisioning activities.

- Attending Meeting with Client.

- Preparation of As-Built drawing.

I hereby declare that the above written particulars are true to the best of my
knowledge and belief.

Date: XXXXXXXXX

S-ar putea să vă placă și