Documente Academic
Documente Profesional
Documente Cultură
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REVISED AS PER SEC-EOA COMMENTS
REVISED AS PER SEC-EOA COMMENTS
ISSUED FOR BASE DESIGN SUBMITTAL
DESCRIPTION
TB
TB
TB
05-03-07
C 24-06-07
B 10-06-07
DATE
CALCULATIONS
NO.
REVISIONS
DRAWN
BY:- TB
DATE:- 24-06-07
CHECKED
BY:- TB
DATE:-24-06-06
OPRG. DEPT
BY
DATE:-
ENG'G. DEPT.
BY:-
DATE:-
CERTIFIED.
BY:-
DATE:-
THIS DRAWING IS NOT DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TO BE USED FOR
CONSTRUCTION OF
FOR ORDERING
GROUNDING SYSTEM DESIGN CALCULATION A DA409 EE-026325 Page 1 of 7 B
MATERIALS UNTIL AL DHAHIYAH 380/115 KV BSP
CERTIFIED AND
DATED AL DHAIYAH SAUDI ARABIA JOB ORDER NO. – 430304-01001 DWG. CONT. SHT. EE -731070
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.0 Reference Standards
2.0 Purpose
Plant grounding is carried out to dissipate electric current into the earth without exceeding any
operating limits and to ensure that a person in the vicinity of ground is not exposed to the danger of
critical electric shock.
Therefore the grounding system of the Plant area is designed to achieve the followings: -
1. To find the earth conductor size with corrosion for design life.
2. To keep touch and step voltage within permissible limit.
3. To keep earth grid resistance within permissible limit.
Maximum observed soil resistivity in the plant area has been considered to
calculate the earth grid design.
BY
TB
TB
TB
C 24-06-07
B 10-06-07
DATE
The site (upto fence) is of rectangular shape having sides 460 m & 191 m.
NO.
REVISIONS 2
DRAWN
S/s Area excluding future area near 380kV Gantry, A1= 299.25 x 56259.00m
188
BY:- TB 2
Excluded Area of Control Room Buiding, A2=(75+2X1) X (25+2X1) 2079.00m
DATE:- 24-06-07 =
2
CHECKED Excluded Area of Capacitor Bank, A3=(50.25) X (50.25) = 2550.25m
2
BY:- TB Excluded Area of 380 kV GIS Building, A4=(75+2X1) X (17.75+2X1) 1520.75m
DATE:-24-06-06 =
2
OPRG. DEPT Excluded Area of 115 kV GIS Building, A5=(70+2X1) X (15+2X1) = 1224.00m
BY
2
DATE:-
The Area considered for Earthmat = 48885.00m
(A1) - (A2+A3+A4+A5)
ENG'G. DEPT.
BY:-
5.0 Input Data
DATE:-
THIS DRAWING IS NOT DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TO BE USED FOR
CONSTRUCTION OF
FOR ORDERING
GROUNDING SYSTEM DESIGN CALCULATION A DA409 EE-026325 Page 2 of 7 B
MATERIALS UNTIL AL DHAHIYAH 380/115 KV BSP
CERTIFIED AND
DATED AL DHAIYAH SAUDI ARABIA JOB ORDER NO. – 430304-01001 DWG. CONT. SHT. EE -731070
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
voltage)
Current Division Factor for IG Sf 0.70
Soil Resistivity ρ 14.940 Ω−m
Surface layer Resistivity ρs 3000.00 Ω−m
2
Equivalent Area of Earthmat considered Α 48885.00 m
REVISED AS PER SEC-EOA COMMENTS
REVISED AS PER SEC-EOA COMMENTS
ISSUED FOR BASE DESIGN SUBMITTAL
6.0 Results
TB
TB
TB
C 24-06-07
B 10-06-07
DATE:-24-06-06
OPRG. DEPT
BY
DATE:-
ENG'G. DEPT.
BY:-
DATE:-
CERTIFIED.
BY:-
DATE:-
THIS DRAWING IS NOT DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TO BE USED FOR
CONSTRUCTION OF
FOR ORDERING
GROUNDING SYSTEM DESIGN CALCULATION A DA409 EE-026325 Page 3 of 7 B
MATERIALS UNTIL AL DHAHIYAH 380/115 KV BSP
CERTIFIED AND
DATED AL DHAIYAH SAUDI ARABIA JOB ORDER NO. – 430304-01001 DWG. CONT. SHT. EE -731070
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7.0 Conductor size calculation
I
A=
Tcap X 10 − 4 K 0 + Tm
ln
BY
TB
TB
TB
t α ρ
c r r 0 K + Ta
05-03-07
C 24-06-07
B 10-06-07
DATE
REVISIONS 2
Calculated area of Earth Conductor A mm 226.13
DRAWN
BY:- TB
Calculated Earth Conductor diameter d mm 16.97
DATE:- 24-06-07
CHECKED 2
Selected copper Earth Conductor area Asel mm 240.00
BY:- TB
DATE:-24-06-06
Selected Earth Conductor diameter d mm 17.48
OPRG. DEPT
BY
DATE:-
ENG'G. DEPT.
BY:-
DATE:-
CERTIFIED.
BY:-
DATE:-
THIS DRAWING IS NOT DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TO BE USED FOR
CONSTRUCTION OF
FOR ORDERING
GROUNDING SYSTEM DESIGN CALCULATION A DA409 EE-026325 Page 4 of 7 B
MATERIALS UNTIL AL DHAHIYAH 380/115 KV BSP
CERTIFIED AND
DATED AL DHAIYAH SAUDI ARABIA JOB ORDER NO. – 430304-01001 DWG. CONT. SHT. EE -731070
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Voltage
Sf
REVISED AS PER SEC-EOA COMMENTS
ISSUED FOR BASE DESIGN SUBMITTAL
Lx m
Thickness of surface layer hs m 0.10
Depth of burried conductor Surface layer h m 0.50
Reference depth of grid h0 m 1.00
Duration of shock current ts sec 0.50
Spacing of grid D m 25.00
Diameter of ground conductor d m 0.017
Maximum Grid current IG= Df* Sf*If (where Df=1.0 ) IG A 44,100
2
Area for laying earthing conductor(A = Lx X Ly) A m 48,885.00
No of parallel Conductors in short side direction (ny = 9
ny
Ly/D)
No of parallel Conductors in long side direction ( nx = 12
nx
BY
TB
TB
Lx/D)
TB
C 24-06-07
B 10-06-07
grid(Lc=nyxLx + nxxLy) Lc m
DATE
ENG'G. DEPT.
0 .7 . A nc 1.00
BY:- L x .L y L x . L y
DATE:-
nc =
A
CERTIFIED.
BY:-
DATE:-
THIS DRAWING IS NOT DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TO BE USED FOR
CONSTRUCTION OF
FOR ORDERING
GROUNDING SYSTEM DESIGN CALCULATION A DA409 EE-026325 Page 5 of 7 B
MATERIALS UNTIL AL DHAHIYAH 380/115 KV BSP
CERTIFIED AND
DATED AL DHAIYAH SAUDI ARABIA JOB ORDER NO. – 430304-01001 DWG. CONT. SHT. EE -731070
nd Where, 1.00
Dm
CHK'D
2
nd = Dm=sqrt(L x
L2x + L2y 2
+L y)
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Spacing factor for Emesh Km 1.079
REVISED AS PER SEC-EOA COMMENTS
REVISED AS PER SEC-EOA COMMENTS
D 2 (D + 2h )2 h K ii 8
ISSUED FOR BASE DESIGN SUBMITTAL
1
Km = ln + − + . ln
2π 16.h.d 8.D.d 4.d K h π (2.n − 1)
Spacing factor for Estep for a depth 0.25m <h < 2.5m Ks 0.343
DESCRIPTION
11 1 1 n−2
Ks = + + (1 − 0 .5 )
π 2h D + h D
TB
TB
TB
Corrective weighting factor that adjusts the effect of inner conductor Kii 1.0
on the corner mesh (Kii =1 for grids with ground rods along the
05-03-07
C 24-06-07
B 10-06-07
DATE
perimeter, or for grids with ground rods in the grid corners, as well
as both along the perimeter and throughout the grid area)
NO.
REVISIONS For grids with ground rods along the perimeter, or for grids with
ground rods in the grid corners, as well as both along the perimeter
DRAWN
and throughout the grid area, the effective burried length, LM, is
BY:- TB
DATE:- 24-06-07
2 2
CHECKED
LM = LC + (1.55 + 1.22 (Lr /sqrt(Lx + Ly )))*LR LM m 4,877
BY:- TB Where LR is the total length of all ground rods in meter (LR = No. of
DATE:-24-06-06 ground rods*length of each ground rod (Lr)), Lx is the maximum
OPRG. DEPT length of grid in X diection = a & Ly is the maximum length of grid in
BY
Y diection = b.
DATE:-
Mesh Voltage based on estimated length Em = r * Km * Ki * IG / LM 316.538
ENG'G. DEPT.
Emesh V
BY:-
DATE:- Effective buried conductor length for a grid with ground rods 3,600.18
Ls =0.75* LC +0.85* LR Ls m
CERTIFIED.
BY:-
DATE:-
THIS DRAWING IS NOT DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TO BE USED FOR
CONSTRUCTION OF
FOR ORDERING
GROUNDING SYSTEM DESIGN CALCULATION A DA409 EE-026325 Page 6 of 7 B
MATERIALS UNTIL AL DHAHIYAH 380/115 KV BSP
CERTIFIED AND
DATED AL DHAIYAH SAUDI ARABIA JOB ORDER NO. – 430304-01001 DWG. CONT. SHT. EE -731070
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ρK s K i I G
Es =
Ls
Tolerable potential difference between two points on the ground - 674.307
Tolerable Limit of Touch Voltage , Etouch=(1000+1.5Cs*rs)* Etouch V
0.116/sqrt(ts)
REVISED AS PER SEC-EOA COMMENTS
REVISED AS PER SEC-EOA COMMENTS
ISSUED FOR BASE DESIGN SUBMITTAL
1 1 1
Rg = ρ + 1 + Ω
L
T 20A 1 + h 20 / A
BY
TB
TB
TB
C 24-06-07
B 10-06-07
DATE
Therefore, Maximum Grid Potential Rise during the fault GPR kV 2.09
NO.
REVISIONS
DRAWN
BY:- TB
DATE:- 24-06-07
CHECKED
BY:- TB
DATE:-24-06-06
OPRG. DEPT
BY
DATE:-
ENG'G. DEPT.
BY:-
DATE:-
CERTIFIED.
BY:-
DATE:-
THIS DRAWING IS NOT DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TO BE USED FOR
CONSTRUCTION OF
FOR ORDERING
GROUNDING SYSTEM DESIGN CALCULATION A DA409 EE-026325 Page 7 of 7 B
MATERIALS UNTIL AL DHAHIYAH 380/115 KV BSP
CERTIFIED AND
DATED AL DHAIYAH SAUDI ARABIA JOB ORDER NO. – 430304-01001 DWG. CONT. SHT. EE -731070