Sunteți pe pagina 1din 4

PROJECT DEVELOPMENT AGREEMENT

S.NO. NADEHI 16MW B


ACCORDING TO THE AGREEMENT CO GEN PLANT WILL RUN
1
220 DAYS IN A YEAR ALONG WITH CONCURRENT MODERNISATION.
HSF SHALL SUPPLY 1.20 LAKH MT BAGASSE TO DEVELOPER FOR USE AS HSF SHALL SUPPLY 1.52 LAKH MT BA
A PRIMARY FUEL, DEVELOPER SHALL SUPPLY POWER AND STEAM A PRIMARY FUEL, DEVELOPER SHAL
2
GENERATED BY THE PROJECT TO THE HSF FOR USE IN ITS SUGGAR PLANT GENERATED BY THE PROJECT TO TH
AND ANCILLARY UNITS AND ANCILLARY UNITS
PROJECT ESTIMATED COST 115.05 CR(INCLUDING MODERNISATION PROJECT ESTIMATED COST 154.52 C
3
COST OF RS 28.31 CR) 38.16CR)
SPECIFICATIONS OF BOILER 80TPH,87Kg/ cm 2,515 degree C SPECIFICATIONS OF BOILER 110TPH
4 2
TURBINE SPECIFICATION OF 16MW ,85KG/CM ,510 degree C DOUBLE TURBINE SPECIFICATION OF 22MW
EXTRACTION CUM CONDENSING TYPE EXTRACTION CUM CONDENSING TY
TO DESIGN DEVELOP ERECT INSTALL AND COMISSION OF THE PROJECT
5
WITH IN 16 MONTHS FROM THE AWARD OF EPC CONTRACT
6
AGREEMENT
BAZPUR 22MW

SAME
L SUPPLY 1.52 LAKH MT BAGASSE TO DEVELOPER FOR USE AS
RY FUEL, DEVELOPER SHALL SUPPLY POWER AND STEAM
ED BY THE PROJECT TO THE HSF FOR USE IN ITS SUGGAR PLANT
LLARY UNITS
ESTIMATED COST 154.52 CR(INCLUDING MODERNISATION COST OF RS

TIONS OF BOILER 110TPH,110Kg/ cm 2 ,540 degree c


SPECIFICATION OF 22MW ,105KG/CM 2,535 degree C DOUBLE
ON CUM CONDENSING TYPE

SAME

S-ar putea să vă placă și