Sunteți pe pagina 1din 4

Micro-Project proposal

Simple Calculator Application using Java Applet and Electricity


Bill Calculator Of A Person using Inheritance of Java.
.
1.0 Aims/Benefits of the Micro-Project
 To Prepare a Windows based application “Simple Calculator Application using
Java Applet and Electricity Bill Calculator Of A Person using
Inheritance of Java using Java Concepts.

An electronic calculator is typically a portable electronic device used to


perform calculations, ranging from basic arithmetic to complex mathematics. But
Electronic Calculators can get errors if Battery is Died of Calculator so to resolve this
problem, This Application Will Allows us to generate Arithmetic
Calculations Digitally. Hence this will make easy to get General
Calculation that is required to solve Math Based Questions in written.

2.0 Course Outcomes Addressed


a) Develop programs using Object Oriented methodology in java.
b) Apply concept of inheritance for code reusability.
c) Develop programs using Multithreading.
d) Implement Exception Handling.
e) Develop programs using graphics and applet.

3.0 Proposed Methodology


1. First we will Collect The required Information From Internet From
Websites.
2. After collecting the requirements we will Distributing the work tasks to
our Team Members.
3. Then we will Analyzing the Concept of Applet in Java and various
Events Of Applet to prepare an Application. After analyzing we will
preparing a rough model in a paper for how the system will works.
4. We will prepare our final Application using Java Runtime Environment
Software such as JDK(java development kit) v7.8.01, Command
Prompt, and Notepad Editor, Java inbuilt Appletviewer .
5. After this we will Test, Checking the Work products that has been
carried out from our application.
6. After completing project works we will Prepare a Micro-project Report
and submitting it to our guide.
4.0 Action Plan

Sr Details of Activity Planned Planned Name Of Responsible


No Start Finish Team Members
. Date Date

1) Collecting required  Vishal S Kesharwani


information for our  Shardaprasad S
project topic. kawle

2) Planning and  Vishal S Kesharwani


distributing the  Shardaprasad S
Work tasks. kawle

3) Observing Concepts  Vishal S Kesharwani


Of Java Applet.  Shardaprasad S
kawle

4) Preparing rough  Pravin S Thakre


model of our  Shital Lilhare
application about
interface,
5) Preparing the  Vishal S Kesharwani
Application .  Shardaprasad S
kawle
 Pravin S Thakre
 Shital Lilhare

6) Observing report  Vishal S Kesharwani


generated from
Application or work
products carried
out.
7) Preparing work of  Vishal S Kesharwani
Micro-project report.  Shardaprasad S
kawle
8) Submitting Micro-  Vishal S Kesharwani
project report of the  Shardaprasad S
project. kawle
 Pravin S Thakre
 Shital Lilhare

5.0 Resources Required

S. No. Name of Specifications Qty Remarks


Resource/mate .
rial
1. Computer Desktop or Laptop 1 Collecting
system with approx. 2GB Informations
RAM ,500GB HDD from internet.
or SSD with at least
Intel core-i3
processor.
2. Software JDK v7.8.01 , 1 For Creating of
Command Application.
Prompt[CMD],
Notepad Editor
3. Office Software Microsoft Word - Preparing
Packages 2013 or others Demonstration
Report.

Names Of Team Members With Roll Nos.


Group No.03
1. Vishal S. Kesharwani 11
2. Shardaprasad S. Kawle 10
3. Pravin S. Thakre 12
4. Shital R. Lilhare 09
**************

S-ar putea să vă placă și