Sunteți pe pagina 1din 4

CTW 130 - Detailed Design services

Definitive design - Package 05: KP 9+600 . KP 12+900


MAJOR STRUCTURE - KRT-RB1 DRAWINGS PACKAGE-4
CTW130-SYS-FD-MAS-DWG-5580 ~ 5673

PROJECT ISSUER PHASE DISCIPLINE DOC.TYPE DOC.NUMBER TITLE Revision


CTW130 SYS FD MAS DWG 5580 KRT-RB1_BEARING LAYOUT D0
CTW130 SYS FD MAS DWG 5581 KRT-RB1_BEARING (P1) REINFORCEMENT (1/10) D0
CTW130 SYS FD MAS DWG 5582 KRT-RB1_BEARING (P2) REINFORCEMENT (2/10) D0
CTW130 SYS FD MAS DWG 5583 KRT-RB1_BEARING (P3) REINFORCEMENT (3/10) D0
CTW130 SYS FD MAS DWG 5584 KRT-RB1_BEARING (P4) REINFORCEMENT (4/10) D0
CTW130 SYS FD MAS DWG 5585 KRT-RB1_BEARING (P5) REINFORCEMENT (5/10) D0
CTW130 SYS FD MAS DWG 5586 KRT-RB1_BEARING (P6) REINFORCEMENT (6/10) D0
CTW130 SYS FD MAS DWG 5587 KRT-RB1_BEARING (P7) REINFORCEMENT (7/10) D0
CTW130 SYS FD MAS DWG 5588 KRT-RB1_BEARING (P8) REINFORCEMENT (8/10) D0
CTW130 SYS FD MAS DWG 5589 KRT-RB1_BEARING (P9) REINFORCEMENT (9/10) C0
CTW130 SYS FD MAS DWG 5590 KRT-RB1_BEARING (ABUTMENT) REINFORCEMENT (10/10) D0
CTW130 SYS FD MAS DWG 5591 KRT-RB1_PIER 1 LAYOUT (1/2) D0
CTW130 SYS FD MAS DWG 5592 KRT-RB1_PIER 1 LAYOUT (2/2) D0
CTW130 SYS FD MAS DWG 5593 KRT-RB1_PIERCAP & PIER (P1) REINFORCEMENT (1/2) E0
CTW130 SYS FD MAS DWG 5594 KRT-RB1_PIERCAP & PIER (P1) REINFORCEMENT (2/2) E0
CTW130 SYS FD MAS DWG 5595 KRT-RB1_PILECAP & PILE (P1) REINFORCEMENT D0
CTW130 SYS FD MAS DWG 5596 KRT-RB1_PIER 2 TO 6 LAYOUT D0
CTW130 SYS FD MAS DWG 5597 KRT-RB1_PIERCAP & PIER (P2 TO P4) REINFORCEMENT E0
CTW130 SYS FD MAS DWG 5598 KRT-RB1_PILECAP & PILE (P2 TO P4) REINFORCEMENT D0
GOOD FOR CONSTRUCTION
CTW130 SYS FD MAS DWG 5599 KRT-RB1_PIERCAP & PIER (P5 TO P6) REINFORCEMENT D0 THE CONTRACTOR THE ENGINEER

CTW130 SYS FD MAS DWG 5600 KRT-RB1_PILECAP & PILE (P5 TO P6) REINFORCEMENT D0
CTW130 SYS FD MAS DWG 5601 KRT-RB1_PIER 7 LAYOUT D0
CTW130 SYS FD MAS DWG 5602 KRT-RB1_PIERCAP & PIER (P7) REINFORCEMENT E0 E0 05/02/2020 UPDATE KM JHH JSC
D0 15/11/2019 UPDATE KM JHH JSC

CTW130 SYS FD MAS DWG 5603 KRT-RB1_PILECAP & PILE (P7) REINFORCEMENT (1/2) D0 C0 22/07/2019 UPDATE KM JHH JSC
B0 22/02/2019 UPDATE KM HKB JSC
A0 14/06/2017 FIRST ISSUE KM WGC RDO
CTW130 SYS FD MAS DWG 5604 KRT-RB1_PILECAP & PILE (P7) REINFORCEMENT (2/2) D0
REV.No. DATE REVISIONS DESIGNED REVIEWED APPROVED

ENGINEER
CTW130 SYS FD MAS DWG 5605 KRT-RB1_PIER 8 LAYOUT D0
CTW130 SYS FD MAS DWG 5606 KRT-RB1_PIERCAP & PIER (P8) REINFORCEMENT E0 KINGDOM OF SAUDI ARABIA
SAUDI RAILWAY COMPANY

CTW130 SYS FD MAS DWG 5607 KRT-RB1_PILECAP & PILE (P8) REINFORCEMENT (1/2) D0 CONTRACTOR DESIGNER

CTW130 SYS FD MAS DWG 5608 KRT-RB1_PILECAP & PILE (P8) REINFORCEMENT (2/2) D0
CTW130-SYS-FD-MAS-DWG-5489-E0

CTW130 SYS FD MAS DWG 5609 KRT-RB1_PIER 9 LAYOUT C0


CTW130 SYS FD MAS DWG 5610 KRT-RB1_PIERCAP & PIER (P9) REINFORCEMENT D0 PROJECT TITLE:

JUBAIL RAILWAY NETWORK PROJECT


CTW130 SYS FD MAS DWG 5611 KRT-RB1_PILECAP & PILE (P9) REINFORCEMENT C0
DRAWING TITLE:
MAJOR STRUCTURE - KRT-RB1
DRAWINGS PACKAGE-4
LIST OF DRAWINGS
SCALE: DRAWING No.
-- CTW130-SYS-FD-MAS-DWG-5489
Original A1 E0
CTW 130 - Detailed Design services
Definitive design - Package 05: KP 9+600 . KP 12+900
MAJOR STRUCTURE - KRT-RB1 DRAWINGS PACKAGE-4
CTW130-SYS-FD-MAS-DWG-5580 ~ 5673

PROJECT ISSUER PHASE DISCIPLINE DOC.TYPE DOC.NUMBER TITLE Revision


CTW130 SYS FD MAS DWG 5612 KRT-RB1_ABUTMENT LAYOUT (1/2) D0
CTW130 SYS FD MAS DWG 5613 KRT-RB1_ABUTMENT LAYOUT (2/2) D0
CTW130 SYS FD MAS DWG 5614 KRT-RB1_ABUTMENT REINFORCEMENT (1/3) D0
CTW130 SYS FD MAS DWG 5615 KRT-RB1_ABUTMENT REINFORCEMENT (2/3) D0
CTW130 SYS FD MAS DWG 5616 KRT-RB1_ABUTMENT REINFORCEMENT (3/3) D0
CTW130 SYS FD MAS DWG 5617 KRT-RB1_PARAPET REINFORCEMENT (1/2) D0
CTW130 SYS FD MAS DWG 5618 KRT-RB1_PARAPET REINFORCEMENT (2/2) D0
CTW130 SYS FD MAS DWG 5619 KRT-RB1_BEARING (P1) BAR SCHEDULE (1/48) D0
CTW130 SYS FD MAS DWG 5620 KRT-RB1_PIERCAP (P1) BAR SCHEDULE (2/48) E0
CTW130 SYS FD MAS DWG 5621 KRT-RB1_PIER (P1) BAR SCHEDULE (3/48) D0
CTW130 SYS FD MAS DWG 5622 KRT-RB1_PILECAP (P1) BAR SCHEDULE (4/48) D0
CTW130 SYS FD MAS DWG 5623 KRT-RB1_PILE (P1) BAR SCHEDULE (5/48) D0
CTW130 SYS FD MAS DWG 5624 KRT-RB1_BEARING (P2) BAR SCHEDULE (6/48) D0
CTW130 SYS FD MAS DWG 5625 KRT-RB1_PIERCAP (P2) BAR SCHEDULE (7/48) E0
CTW130 SYS FD MAS DWG 5626 KRT-RB1_PIER (P2) BAR SCHEDULE (8/48) D0
CTW130 SYS FD MAS DWG 5627 KRT-RB1_PILECAP (P2) BAR SCHEDULE (9/48) D0
CTW130 SYS FD MAS DWG 5628 KRT-RB1_PILE (P2) BAR SCHEDULE (10/48) D0
CTW130 SYS FD MAS DWG 5629 KRT-RB1_BEARING (P3) BAR SCHEDULE (11/48) D0
CTW130 SYS FD MAS DWG 5630 KRT-RB1_PIERCAP (P3) BAR SCHEDULE (12/48) E0
GOOD FOR CONSTRUCTION
CTW130 SYS FD MAS DWG 5631 KRT-RB1_PIER (P3) BAR SCHEDULE (13/48) D0 THE CONTRACTOR THE ENGINEER

CTW130 SYS FD MAS DWG 5632 KRT-RB1_PILECAP (P3) BAR SCHEDULE (14/48) D0
CTW130 SYS FD MAS DWG 5633 KRT-RB1_PILE (P3) BAR SCHEDULE (15/48) D0
CTW130 SYS FD MAS DWG 5634 KRT-RB1_BEARING (P4) BAR SCHEDULE (16/48) D0 E0 05/02/2020 UPDATE KM JHH JSC
D0 15/11/2019 UPDATE KM JHH JSC

CTW130 SYS FD MAS DWG 5635 KRT-RB1_PIERCAP (P4) BAR SCHEDULE (17/48) E0 C0 22/07/2019 UPDATE KM JHH JSC
B0 22/02/2019 UPDATE KM HKB JSC
A0 14/06/2017 FIRST ISSUE KM WGC RDO
CTW130 SYS FD MAS DWG 5636 KRT-RB1_PIER (P4) BAR SCHEDULE (18/48) D0
REV.No. DATE REVISIONS DESIGNED REVIEWED APPROVED

ENGINEER
CTW130 SYS FD MAS DWG 5637 KRT-RB1_PILECAP (P4) BAR SCHEDULE (19/48) D0
CTW130 SYS FD MAS DWG 5638 KRT-RB1_PILE (P4) BAR SCHEDULE (20/48) D0 KINGDOM OF SAUDI ARABIA
SAUDI RAILWAY COMPANY

CTW130 SYS FD MAS DWG 5639 KRT-RB1_BEARING (P5) BAR SCHEDULE (21/48) D0 CONTRACTOR DESIGNER

CTW130 SYS FD MAS DWG 5640 KRT-RB1_PIERCAP (P5) BAR SCHEDULE (22/48) E0
CTW130-SYS-FD-MAS-DWG-5490-E0

CTW130 SYS FD MAS DWG 5641 KRT-RB1_PIER (P5) BAR SCHEDULE (23/48) D0
CTW130 SYS FD MAS DWG 5642 KRT-RB1_PILECAP (P5) BAR SCHEDULE (24/48) D0 PROJECT TITLE:

JUBAIL RAILWAY NETWORK PROJECT


CTW130 SYS FD MAS DWG 5643 KRT-RB1_PILE (P5) BAR SCHEDULE (25/48) D0
DRAWING TITLE:
CTW130 SYS FD MAS DWG 5644 KRT-RB1_BEARING (P6) BAR SCHEDULE (26/48) D0
MAJOR STRUCTURE - KRT-RB1
DRAWINGS PACKAGE-4
LIST OF DRAWINGS
SCALE: DRAWING No.
-- CTW130-SYS-FD-MAS-DWG-5490
Original A1 E0
CTW 130 - Detailed Design services
Definitive design - Package 05: KP 9+600 . KP 12+900
MAJOR STRUCTURE - KRT-RB1 DRAWINGS PACKAGE-4
CTW130-SYS-FD-MAS-DWG-5580 ~ 5673

PROJECT ISSUER PHASE DISCIPLINE DOC.TYPE DOC.NUMBER TITLE Revision


CTW130 SYS FD MAS DWG 5645 KRT-RB1_PIERCAP (P6) BAR SCHEDULE (27/48) E0
CTW130 SYS FD MAS DWG 5646 KRT-RB1_PIER (P6) BAR SCHEDULE (28/48) D0
CTW130 SYS FD MAS DWG 5647 KRT-RB1_PILECAP (P6) BAR SCHEDULE (29/48) D0
CTW130 SYS FD MAS DWG 5648 KRT-RB1_PILE (P6) BAR SCHEDULE (30/48) D0
CTW130 SYS FD MAS DWG 5649 KRT-RB1_BEARING (P7) BAR SCHEDULE (31/48) D0
CTW130 SYS FD MAS DWG 5650 KRT-RB1_PIERCAP (P7) BAR SCHEDULE (32/48) E0
CTW130 SYS FD MAS DWG 5651 KRT-RB1_PIER (P7) BAR SCHEDULE (33/48) D0
CTW130 SYS FD MAS DWG 5652 KRT-RB1_PILECAP (P7) BAR SCHEDULE (34/48) D0
CTW130 SYS FD MAS DWG 5653 KRT-RB1_PILE (P7) BAR SCHEDULE (35/48) D0
CTW130 SYS FD MAS DWG 5654 KRT-RB1_BEARING (P8) BAR SCHEDULE (36/48) D0
CTW130 SYS FD MAS DWG 5655 KRT-RB1_PIERCAP (P8) BAR SCHEDULE (37/48) E0
CTW130 SYS FD MAS DWG 5656 KRT-RB1_PIER (P8) BAR SCHEDULE (38/48) D0
CTW130 SYS FD MAS DWG 5657 KRT-RB1_PILECAP (P8) BAR SCHEDULE (39/48) D0
CTW130 SYS FD MAS DWG 5658 KRT-RB1_PILE (P8) BAR SCHEDULE (40/48) D0
CTW130 SYS FD MAS DWG 5659 KRT-RB1_BEARING (P9) BAR SCHEDULE (41/48) C0
CTW130 SYS FD MAS DWG 5660 KRT-RB1_PIERCAP (P9) BAR SCHEDULE (42/48) D0
CTW130 SYS FD MAS DWG 5661 KRT-RB1_PIER (P9) BAR SCHEDULE (43/48) C0
CTW130 SYS FD MAS DWG 5662 KRT-RB1_PILECAP (P9) BAR SCHEDULE (44/48) C0
CTW130 SYS FD MAS DWG 5663 KRT-RB1_PILE (P9) BAR SCHEDULE (45/48) C0
GOOD FOR CONSTRUCTION
CTW130 SYS FD MAS DWG 5664 KRT-RB1_BEARING (ABUTMENT) BAR SCHEDULE (46/48) D0 THE CONTRACTOR THE ENGINEER

CTW130 SYS FD MAS DWG 5665 KRT-RB1_ABUTMENT BAR SCHEDULE (47/48) D0


CTW130 SYS FD MAS DWG 5666 KRT-RB1_PILE (ABUTMENT) BAR SCHEDULE (48/48) D0
CTW130 SYS FD MAS DWG 5667 KRT-RB1_DECK BEARING ARRANGEMENT D0 E0 05/02/2020 UPDATE KM JHH JSC
D0 15/11/2019 UPDATE KM JHH JSC

CTW130 SYS FD MAS DWG 5668 KRT-RB1_UTILITIES DETAIL (1/3) C0 C0 22/07/2019 UPDATE KM JHH JSC
B0 22/02/2019 UPDATE KM HKB JSC
A0 14/06/2017 FIRST ISSUE KM WGC RDO
CTW130 SYS FD MAS DWG 5669 KRT-RB1_UTILITIES DETAIL (2/3) D0
REV.No. DATE REVISIONS DESIGNED REVIEWED APPROVED

ENGINEER
CTW130 SYS FD MAS DWG 5670 KRT-RB1_UTILITIES DETAIL (3/3) C0
CTW130 SYS FD MAS DWG 5671 KRT-RB1_CONSTRUCTION SEQUENCE (1/3) D0 KINGDOM OF SAUDI ARABIA
SAUDI RAILWAY COMPANY

CTW130 SYS FD MAS DWG 5672 KRT-RB1_CONSTRUCTION SEQUENCE (2/3) D0 CONTRACTOR DESIGNER

CTW130 SYS FD MAS DWG 5673 KRT-RB1_CONSTRUCTION SEQUENCE (3/3) D0


CTW130-SYS-FD-MAS-DWG-5491-E0

PROJECT TITLE:

JUBAIL RAILWAY NETWORK PROJECT

DRAWING TITLE:
MAJOR STRUCTURE - KRT-RB1
DRAWINGS PACKAGE-4
LIST OF DRAWINGS
SCALE: DRAWING No.
-- CTW130-SYS-FD-MAS-DWG-5491
Original A1 E0
CTW 130 - Detailed Design services
Definitive design - Package 05: KP 9+600 . KP 12+900
MAJOR STRUCTURE - KRT-RB1 DRAWINGS PACKAGE - GENERAL NOTES & DETAILS
CTW130-SYS-FD-MAS-DWG-9002 ~ 9006

PROJECT ISSUER PHASE DISCIPLINE DOC.TYPE DOC.NUMBER TITLE Revision


CTW130 SYS FD MAS DWG 9002 KEY PLAN A0
CTW130 SYS FD MAS DWG 9003 KRT-RB1 GENERAL NOTES(1) B0
CTW130 SYS FD MAS DWG 9004 KRT-RB1 GENERAL NOTES(1) C0
CTW130 SYS FD MAS DWG 9005 KRT-RB1 TYPICAL TANKING DETAILS AND DRAINAGE B0
CTW130 SYS FD MAS DWG 9006 KRT-RB1 OTHER DETAILS C0

GOOD FOR CONSTRUCTION


THE CONTRACTOR THE ENGINEER

C0 15/11/2019 UPDATE KM JHH JSC


B0 02/07/2019 UPDATE KM JHH JSC
A0 11/01/2019 FIRST ISSUE KM HKB JSC
REV.No. DATE REVISIONS DESIGNED REVIEWED APPROVED

ENGINEER

KINGDOM OF SAUDI ARABIA


SAUDI RAILWAY COMPANY

CONTRACTOR DESIGNER
CTW130-SYS-FD-MAS-DWG-9001-C0

PROJECT TITLE:

JUBAIL RAILWAY NETWORK PROJECT

DRAWING TITLE:
MAJOR STRUCTURE - KRT-RB1
DRAWINGS PACKAGE - GENERAL NOTES & DETAILS
LIST OF DRAWINGS
SCALE: DRAWING No.
-- CTW130-SYS-FD-MAS-DWG-9001
Original A1 C0

S-ar putea să vă placă și