Sunteți pe pagina 1din 14

 

ENGINEERING
REPORT
PT. BUKIT DARMO PROPERTY, TBK.
Rev. 01

FIRE FIGHTING SYSTEM – APARTMENT ADHIWANGSA

PIPA FF TIDAK ADA AIR/KOSONG, DAN/ATAU POMPA TERUS-MENERUS “ON-OFF”


JIKA DIJALANKAN
+
4
j ld
I rtr
li
lw

I 7o<
+ G}
tll
nu =
4 g
ffi oo=
N
a
I
4
Z
1

z
t5
\n

d
tfr
>
>
z
o
APARTIV\ENT,

- SPRIFiKLFR

* 08': Iv\rllN RtgER

- Q6'l

5fl,qFT

Puvrp + '-.*J
Rootrt -+ TOWER.B

6UDAtq6

lN5TALAgl TFRPASAT.{€,
APARTMENT ADHIWANGSA 
TOWER - B

 
PT. BUKIT DARMO PROPERTY TBK. BILL OF QUANTITY

Total
Item Qty Unit
Modifikasi Instalasi FINAL SUMMARY
No.
Fire Fighting Material Labour
A B C D E F

A. Bill No. 1.1 : Apt. Adhiwangsa 1 Lot 36.012.200 35.000.000,00

B Bill No. 1.2 : 9 Blv 1 Lot 12.410.000 17.500.000,00

C Bill No. 1.3 : Hotel 1 Lot 22.432.200 17.500.000,00

Sub Total 70.854.400 70.000.000,00

Sub Total (Material + Upah) 140.854.400,00

PPN 10% 14.085.440,00

Grand Total 154.939.840,00


(Estimated)
PT. BUKIT DARMO PROPERTY TBK.

Bill No.1: No. 1.1:


Rate Total
Item Modifikasi Qty Unit
No. Instalasi Fire Apt. Adhiwangsa
Material Upah Material Upah
Fighting
A B C D E F G=CxE H=CxF

Supply & install/modifikasi/bongkar-pasang


instalasi Fire Fighting (Riser Hydrant dan Riser
Sprinkler) terpasang sesuai gambar terlampir,
lengkap accessories dan/atau piping devices
termasuk piping circuit yang dibutuhkan agar
berfungsi dengan baik dan benar.

1. Carbon steel pipe Ø 8" 9 mtr 645.000 5.805.000


ASTM A53, Schedule 40
2 Knee Ø 8" 4 nos 506.550 termasuk 2.026.200 termasuk
Forged Steel, Butt-Welding, mengikuti tebal
pipa (sch. 40)
3 Flow Switch 15 nos 1.750.000 26.250.000
Johnson Controls Type F61KB, application for
water in ambient temperature, upward flow
4 Socket for Flow Switch 8 nos 15.000 termasuk 120.000 termasuk
Ø 1" steel - 1500 psi
5 Check Valve Ø 8" 0 nos 4.000.000 -
Cast Iron, Flange Connection, Wafer Type, JIS-
16K minimum
6 Steel Flanges, JIS - 20K 0 nos 640.000 termasuk - termasuk
7 Packing, minimum 1,5mm - 20K 1 m² 100.000 termasuk 100.000 termasuk
8 Bolt & Nut, w/ 2-Washers+1-Springs for Flanges 0 Sets 15.000 termasuk - termasuk
9 UNP 100 for Pipe Bracket 6 mtr 120.000 termasuk 720.000 termasuk
10 Strap for Pipe Bracket, (25 x 3)mm 6 mtr 50.000 termasuk 300.000 termasuk
11 Threaded Rod Ø ⅝" x 2 Mtr for Pipe Bracket 1 no 25.000 termasuk 25.000 termasuk
12 Nut+Washer+Spring, Ø ⅝" for Pipe Bracket 25 Sets 4.000 termasuk 100.000 termasuk
13 Dynabolt Ø ⅝" x 4" for Pipe Bracket 12 Sets 18.000 termasuk 216.000 termasuk
14 Primary Paint 1 Kg 100.000 100.000
15 Top Coat Paint, Red 1 Kg 250.000 250.000

Jumlah 1 Lot 36.012.200 35.000.000


dipindahkan ke lembar "Summary"
71.012.200
PT. BUKIT DARMO PROPERTY TBK.

Bill No.1: No. 1.2:


Rate Total
Item Modifikasi Instalasi Qty Unit
No. 9BLV
Fire Fighting Material Upah Material Upah
A B C D E F G=CxE H=CxF

Supply & install/modifikasi/bongkar-pasang instalasi


Fire Fighting (Riser Hydrant dan Riser Sprinkler)
terpasang sesuai gambar terlampir, lengkap
accessories dan/atau piping devices termasuk
piping circuit yang dibutuhkan agar berfungsi
dengan baik dan benar.

1. Carbon steel pipe Ø 8" 0 mtr - -


ASTM A53, Schedule 40
2 Knee Ø 8" 0 nos - -
Forged Steel, Butt-Welding, mengikuti tebal
pipa (sch. 40)
3 Flow Switch 7 nos 1.750.000 12.250.000
Johnson Controls Type F61KB, application for
water in ambient temperature, upward flow
4 Socket for Flow Switch 4 nos 15.000 termasuk 60.000 termasuk
Ø 1" steel - 1500 psi
5 Check Valve Ø 8" 0 nos 4.000.000 -
Cast Iron, Flange Connection, Wafer Type, JIS-
16K minimum
6 Steel Flanges, JIS - 20K 0 nos 640.000 termasuk - termasuk
7 Packing, minimum 1,5mm - 20K 1 m² 100.000 termasuk 100.000 termasuk
8 Bolt & Nut, w/ 2-Washers+1-Springs for Flanges 0 Sets 15.000 termasuk - termasuk
9 UNP 100 for Pipe Bracket 0 mtr - -
10 Strap for Pipe Bracket, (25 x 3)mm 0 mtr - -
11 Threaded Rod Ø ⅝" x 2 Mtr for Pipe Bracket 0 no - -
12 Nut+Washer+Spring, Ø ⅝" for Pipe Bracket 0 Sets - -
13 Dynabolt Ø ⅝" x 4" for Pipe Bracket 0 Sets - -
14 Primary Paint 0 Kg - -
15 Top Coat Paint, Red 0 Kg - -

Jumlah 1 Lot 12.410.000 17.500.000,00


dipindahkan ke lembar "Summary"
29.910.000
PT. BUKIT DARMO PROPERTY TBK.

Bill No.1: No. 1.3:


Rate Total
Item Modifikasi Instalasi Qty Unit
No. Hotel
Fire Fighting Material Upah Material Upah
A B C D E F G=CxE H=CxF

Supply & install/modifikasi/bongkar-pasang instalasi


Fire Fighting (Riser Hydrant dan Riser Sprinkler)
terpasang sesuai gambar terlampir, lengkap
accessories dan/atau piping devices termasuk
piping circuit yang dibutuhkan agar berfungsi
dengan baik dan benar.

1. Carbon steel pipe Ø 8" 9 mtr 645.000 5.805.000


ASTM A53, Schedule 40
2 Knee Ø 8" 4 nos 506.550 termasuk 2.026.200 termasuk
Forged Steel, Butt-Welding, mengikuti tebal
pipa (sch. 40)
3 Flow Switch 7 nos 1.750.000 12.250.000
Johnson Controls Type F61KB, application for
water in ambient temperature, upward flow
4 Socket for Flow Switch 4 nos 15.000 termasuk 60.000 termasuk
Ø 1" steel - 1500 psi
5 Check Valve Ø 8" 0 nos 4.000.000 -
Cast Iron, Flange Connection, Wafer Type, JIS-
16K minimum
6 Steel Flanges, JIS - 20K 0 nos 640.000 termasuk - termasuk
7 Packing, minimum 1,5mm - 20K 1 m² 100.000 termasuk 100.000 termasuk
8 Bolt & Nut, w/ 2-Washers+1-Springs for Flanges 32 Sets 15.000 termasuk 480.000 termasuk
9 UNP 100 for Pipe Bracket 6 mtr 120.000 termasuk 720.000 termasuk
10 Strap for Pipe Bracket, (25 x 3)mm 6 mtr 50.000 termasuk 300.000 termasuk
11 Threaded Rod Ø ⅝" x 2 Mtr for Pipe Bracket 1 no 25.000 termasuk 25.000 termasuk
12 Nut+Washer+Spring, Ø ⅝" for Pipe Bracket 25 Sets 4.000 termasuk 100.000 termasuk
13 Dynabolt Ø ⅝" x 4" for Pipe Bracket 12 Sets 18.000 termasuk 216.000 termasuk
14 Primary Paint 1 Kg 100.000 100.000
15 Top Coat Paint, Red 1 Kg 250.000 250.000

Jumlah 1 Lot 22.432.200 17.500.000


dipindahkan ke lembar "Summary"
39.932.200