Subject : Independent Engineer Services during Operation & Maintenance stage of four laning of Cuddappah –
Kurnool section of NH-18 (New NH-40) from Km.167.750 to Km.356.502 in the state of Andhra Pradesh on
BOT (Toll) project under NHDP Phase-III
We, the undersigned, offer to provide the consulting services for the above in accordance with your
Request for Proposal dated [Date], and our proposal. Our attached financial proposal is for the sum of
[Amount in words and figures] This amount is exclusive of the local
Our financial proposal shall be binding upon us subject to the modifications resulting from contract negotiations, up
to the expiration of the validity period of the proposal,i.e., [Date].
We undertake that, in competing for (and, if the award is made to us, in executing) the above contract, we will strictly
observe the laws against fraud and corruption in force in India namely “Prevention of Corruption Act 1988”.
Commission and gratuities, if any, paid or to be paid by us to agents relating to this proposal and contract execution, if
we are awarded the contract, are listed below:
We understand you are not bound to accept any proposal you receive.
Address
*Lead Member in case of JV
RM
om contract negotiations, up
Purpose of Commission
or Gratuity
...............................
...............................
Independent Engineer Services during
Operation & Maintenance stage of four
laning of Cuddappah – Kurnool section of
Name of Work NH-18 (New NH-40) from Km.167.750 to
Km.356.502 in the state of Andhra
Pradesh on BOT (Toll) project under
NHDP Phase-III
Amount
No. Description (:LC)*
Local Consultants
Name of Work:-Independent Engineer Services during Operation & Maintenance stage of four laning of
Cuddappah – Kurnool section of NH-18 (New NH-40) from Km.167.750 to Km.356.502 in the state of Andhra
Pradesh on BOT (Toll) project under NHDP Phase-III
Sub-professional
1 Assistant Quality cum Material Expert TBN 12 0
2 Assistant Highway Maintenance Engineer TBN 120 0
3 CAD Expert TBN 20 0
4 Electrical Engineer TBN 10 0
5 Horticulture Expert TBN 30 0
6 Quantity Surveyor TBN 10 0
Sub Total 202 0
Total 0
TBN = To Be Named
*The man-month against each key personnel/sub – professional shall be same as specified in Enclosure A of
TOR.
Qty.
S.No Description of Vehicles Rate /
(No. of vehicle-month)
Total Vehicle - Amount
No. of No. of Month
months Vehicles
Total: 0
Total: 0
IX. Road Survey Equipment:- The cost shall include carrying out survey using equipment, manpower,
Nos. of
Description Rate/month Amount
Months
Surface defects detection and roughness measurement using
1 10 0
Network Survey Vehicle