Sunteți pe pagina 1din 2

QUALITY ASSEMBLY PLAN Doc.

No: MTD - QP-01 - 01 - b


Rev : 0 Date: 03-05-06
Mounting of Tyre Assembly On Axle

Sl No: Phase Production Quality Specification Frequency Approved Rejected Comments Record Ref

Clean all Parts , spoke ends,


Immediately after cleaning
1 Preparation rims mounting bevel, bolts of Visual check for compliance
Spot Check
clamp etc.

Slide inner tyre assembly on


Visual check for compliance
to wheel assembly.
Maintain possible recess for
valve mount spacers and the Check recess maintained
Spot Check
two are abutting
Stops are located between
Stops located between the
the two spokes next to the
two spokes and the wall
Wall
Visual check for compliance
Mount second tyre assembly
Considering the abutting On Completion of phase
2 Assembly
slops of inner and outer rim Check abutting slops of inner
are staggered and outer rim staggered
Place two clamps and nuts
first and tighten slightly thus Visual check for compliance
pre centering outer rim

Insert remaining clamps and


nuts, by turning the wheel Spot Check
little, nuts are slightly Check the nuts are not
tightened in turn and this tightened cross wise
operation repeated until nuts
are tight.

Admissible torque. M18 Evidence of respective bolts


3 Final Bolts 270 - 300 Nm and M On Completion of phase
tightened to required torque
20 Bolts 320 - 350

Checked By : ……………………………………………………

Approved By : …………………………………………………..
If this is a paper copy, it is uncontrolled. You must verify the on-line revision before using.