Meeting Buenos Aires, October 2013

Modernization of LMZ
Steam Turbines
Markus Kupetz

Luis Sanchez

Restricted © Siemens AG 2013 All rights reserved.


Page 1 2013-10-02 Steam Turbine Design
• Introduction
• Concepts
• Modernization Products
• Conclusions and Summary

Luis Sanchez– October 2nd 2013

Meeting with Pampa Energia


Buenos Aires, Argentina

Restricted © Siemens AG 2013 All rights reserved.


Page 2 2013-09-30 E F PR SU EN MO
Presenter

Dipl.-Ing. Markus Kupetz

Since 2010 Director - Global Modernization


Steam Turbine Engineering

2009 – 1997 Siemens Energy


Functions in Steam Turbine Engineering

Blade and Airfoil Design


Blading Developments
Thermal and Mechanical Design
Manufacturing Technology
Mods & Upgrades – Turbine Construction
Condenser Design

1990 – 1996 Mercator University Duisburg, Germany,


Master Degree in Mechanical Engineering

Restricted © Siemens AG 2013 All rights reserved.


Presenter

Ing. Luis Sanchez

Since 2005 Siemens Energy – Service Division


Steam Plants Modernizations
Marketing Manager-Region Latin America

2000 – 2005 Siemens Energy – Service Division


Functions
Strategic Marketing
Gas Turbine Product Development
Diagnostics Product Development

Education: Master degree in Management of Technology


Master degree in Industrial Engineering
Bachelor degree in Electrical Engineering

Restricted © Siemens AG 2013 All rights reserved.


Siemens Energy Sector – New set-up for the future
requirements of the market

Energy products and solutions – in 6 Divisions


Products and solutions – in 6 Divisions

Fossil Power Wind Solar & Oil & Gas Energy Power
Generation Power Hydro Service Transmission
(E F) (E W) (E X) (E O) (E S) (E T)

Restricted © Siemens AG 2013 All rights reserved.


Energy Service Division
Organizational structure

Energy Service Division


CEO Randy Zwirn

Service Fossil Oil & Gas and Industrial TurboCare Service Renewables
(E S SF) Applications Services (E S TC) (E S SR)
(E S SO)

Business Unit Business Unit Business Unit Business Segment

Comprehensive service Comprehensive service Non-OEM1) and some OEM Comprehensive service Portfolio
portfolio: portfolio: Mature products and services portfolio:
Performance Enhancement Performance Enhancement for oil & gas, industrial and
Lifecycle Management
Programs Programs power generation
applications: Onshore Service Programs
Performance Maintenance Performance Maintenance Offshore Service Programs
Service Programs Service Programs Gas Turbines Offshore Logistics
Training & Consulting Training & Consulting Steam Turbines Solutions
Environmental Systems Customized services for oil Compressors Operations Management
& Services and gas and industrial Generators Spare parts, tools and
FG/IGCC applications repairs
Modernizations and
For gas turbines (up to 60 Upgrades
MW), steam turbines (up to
150 MW), generators and
compressors
1) Original Equipment Manufacturer
Restricted © Siemens AG 2013 All rights reserved.
Service Organizational Set-up and Global Presence

Page 7 2 October 2013 Copyright © Siemens AG 2013 Energy Sector


Solutions to Answer
Customer Needs

Customers "Enablers" Value Proposition Potential Solutions


Optimize cycle Boilers, Auxiliaries, Controls and
"I want to Environmental systems modifications
Plant
optimize my
whole plant" study
Improve integrity Components replacement/upgrade
Energy Efficiency
Audit (RNA)
Traditional upgrades for increased
MW from turbine MW output
"I want the
Traditional
most out of
my machine" STG analysis Inspection intervals extension
Life cycle costs / Diagnostics technologies for
Steam / Gen maintenance Condition-based maintenance
in CC or Outage reduction techniques
Conventional
Optimize limits Start-up / ramp-up and shut down
"I need more
Optimization time changes
operational
flexibility" assessment Increase turbine limits Increased availability
(operational flex)

Critical part monitoring Track key components


Life
“How do I Assessment
Reduce failure risk Necessary components to get to
prepare to end of life
shut this unit
down?” Life Cycle
Operation optimiza-
Management Optimal operations for machine
tion (life time mgmt.)
Plan

Page 8 2 October 2013 Copyright © Siemens AG 2013 Energy Sector


BENEFITS OF MAINTENANCE
INVESTMENTS

Modernization &
Rehabilitation
Investment

In-Kind
Components
Replacement

Maintenance

Power Output
& Thermal
Return on Investment

Consumption

Useful Life
Extension
Useful Life
Extension
Reliability
Reliability Availability
Reliability Availability

Page 9 2 October 2013 Copyright © Siemens AG 2013 Energy Sector


Scope of Supply
I&C

Superheater Reheater

Fuel Economizer
Firing Steam turbines Generator*
System
Burners
Condenser

Pump

LP
Deaerator Pump Heaters Cooling tower
Boiler

Air Preheater

Modernization of prime mover equipment is our main target


Page 10 2 October 2013 Copyright © Siemens AG 2013 Energy Sector
LMZ Turbine Modernizations Experience

Page 11 2 October 2013 Copyright © Siemens AG 2013 Energy Sector


Siemens Solutions for CIS Steam Turbine Fleet
Siemens Experience and References

HP 300MW
Smijew, Ukraine

LP 200MW
Shetou, China
Restricted © Siemens AG 2013 All rights reserved.
Siemens Solutions for CIS Steam Turbine Fleet
Siemens Experience and References

Restricted © Siemens AG 2013 All rights reserved.


570+ GW (rated) Installed Fleet Worldwide thru 2009

2016
Fossil & Nuclear Fleet [GWs] Units Fossil & Nuclear Fleet [units]
and Market Ranking and Market Ranking

290
Gigawatts 2016
Units

177
Gigawatts

1052
902 Units
#1 94 Units
Gigawatts #1

#2
#1
#1
#2
#2 111
Units

Steam Power Gas Turbine and Nuclear Power Gas Turbines Steam Turbines SteamTurbines Generators
Plants CC Power Plants Plants Fossil Fueled Nuclear Fueled

Definitions: Siemens fleet operating in utilities > 100 MW. Operating plants only; retired, deactivated etc., and projects under construction not included.

With more than 570 GW installed capacity, we are a competitive player in the energy
market
Restricted © Siemens AG 2013 All rights reserved.
• Introduction
• Concepts
• Modernization Products
• Conclusions and Summary

Markus Kupetz – October 2nd 2013

Meeting with Pampa Energia


Buenos Aires

Restricted © Siemens AG 2013 All rights reserved.


Page 15 2013-09-30 E F PR SU EN MO
Siemens Solutions for LMZ Fossil 300MW
CONCEPT 1 : Longitudinal Section K-300-240 LMZ

Original Design

Proposed Design (new inner components)

Restricted © Siemens AG 2013 All rights reserved.


Siemens Solutions for LMZ Fossil 300MW
CONCEPT 2 : Longitudinal Section K-300-240 LMZ

Original Design

Proposed Design (new HP turbine, new IP outer casing)

Restricted © Siemens AG 2013 All rights reserved.


• Introduction
• Concepts
• Modernization Products
• Conclusions and Summary

Markus Kupetz – October 2nd 2013

Meeting with Pampa Energia


Buenos Aires

Restricted © Siemens AG 2013 All rights reserved.


Page 18 2013-09-30 E F PR SU EN MO
Siemens Solutions for LMZ Fossil 300MW

HP-Turbine

Restricted © Siemens AG 2013 All rights reserved.


Siemens Solutions for LMZ Fossil 300MW
HP-Turbine (new inner components)

Assumptions : Re-Use HP-Turbine


Bearings (Re-Babbitt) New Rotor
Outer Casing New HP Inner Casing
Gland Casings Integrated Piston
New Guide Blade Carrier
New Control Stage
3D-Blades Drum Stages
Optimized Sealing
New Piston Sealing
Segments
Rotor Oil-Lift System
New Gland Sealing
Segments
Machining of Outer
Casing

Restricted © Siemens AG 2013 All rights reserved.


Siemens Solutions for LMZ Fossil 300MW
HP-Turbine

Scope of HP Turbine modernization

• New Reverse Flow Rotor with Reaction Type Blades

• New Inner Casing with new Control Stage and Nozzle Segments and Blade Carrier

• Outer Casing will be retained - only machining

• Modification of steam inlet with L ring joint (outer to inner casing)

• Turbine Shaft Glands with Spring-Suspended Seal Segments


(front and end glands, piston gland sealing)

• Installation of Sliding Plates at Bearing No 1

• Sliding Plates at Outer Casing Support Brackets (front-end)

• HP evacuation pipe

• New protection circuits for reaction blading

Restricted © Siemens AG 2013 All rights reserved.


Siemens Solutions for LMZ Fossil 300MW
New HP Barrel-Type Turbine

Design M2A

-Supercritical design
-Different admission and exhaust
material possible
-Different casing supports possible
-Long (flexible) rotor
-Feasible for 1-bearing-design
-Short start-up time
-Improve element efficiency >90%

Barrel-Type HP-Turbine:

The barrel design was first introduced in 1937 and become a industry benchmark and Siemens HP-standard.
Since then more than 400 of these turbines were produced. Approximately 250 of which are still in operation.
Reference projects with GUS-manufacturers are Smijew 300MW (Ukraine, TA) and Alholma 200MW (Finland, LMZ)

Restricted © Siemens AG 2013 All rights reserved.


Turbine Modernization Concepts
Blading Technology (Drum Stages)

HP Inlet Ring / Full Arc Admission


• Advanced 3D low reaction blading (not
impulse)
• Single piece design: electro-discharge
machined (EDM) or milled out of a
forged stainless steel ring

Benefit
• Highest efficiency
• Reduced leakages
• Sized for maximum flow of the unit
(reduction of throttling)
• Provision of temperature protection
• Prevention of direct impingement of inlet
steam on the rotor body

Restricted © Siemens AG 2013 All rights reserved.


Turbine Modernization Concepts
Blading Technology (Drum Stages)

3DSTM/3DVTM Blade Path Design


• Fully 3-dimensional blading design
• Twisted blades – reduction of
incidence losses
• 3DSTM Blades – 3-dimensional
Design reducing the Secondary
Losses
• 3DVTM Bladepath – 3-dimensional
Design with Variable stage reaction

Benefit
• Efficiency of the highest level
• Broad range of application
• Customized design with a short delivery time

Cylindrical Airfoil Twisted Airfoil 3DSTM


Restricted © Siemens AG 2013 All rights reserved.
Turbine Modernization Concepts
Blading Technology (Drum Stages)

Controlled Assembly and Recorded Pre-Twist


• Elastically pre-stressed blades (due to pre-twist)
• Tight fit, continuously coupled shroud

Benefit
• Reduced vibration, excellent damping behavior
• Reduced leakage
• No lashing lugs, rivets or tenons

Restricted © Siemens AG 2013 All rights reserved.


Siemens Solutions for LMZ Fossil 300MW

IP-Turbine

Restricted © Siemens AG 2013 All rights reserved.


Siemens Solutions for LMZ Fossil 300MW
IP Turbine (new inner components) – design features

Original outer cylinder and 4 IP-Turbine with existing


control valves are to be reused Outer Casing
New Rotor

Blade ring design for New Guide Blade


stationary blading Carriers
New balance piston
ring in the inlet area 3D-Blades Drum Stages
New Piston Ring with
integrated Sealing
New Gland Sealing
Segments
Machining of IP Outer
Casing
ETAi~93%

Reaction rotor with


balance piston Rework of the
outer casing

Restricted © Siemens AG 2013 All rights reserved.


Siemens Solutions for LMZ Fossil 300MW
New IP Turbine – design features

Assumptions : Re-Use IP-Turbine


Bearings (Re-Babbitt) New Rotor
LP Outer Casing New IP Outer Casing
LP Diffuser New IP Inner Casing
LP Gland Casings Integrated Piston
New Guide Blade Carrier
3D-Blades Drum Stages
Optimized Sealing
New Piston Sealing
Segments
New Gland Sealing
Segments
Optimized Material
Concept (welded rotor)
Machining of LP Outer
Casing
ETAi~93,3%
Reference design for the IP-solution is prooved E-turbine of the
SST3000-series. More than 100 turbines of the type were produced.
Restricted © Siemens AG 2013 All rights reserved.
Siemens Solutions for LMZ Fossil 300MW

LP-Turbine

Restricted © Siemens AG 2013 All rights reserved.


Siemens Solutions for LMZ Fossil 300MW
LP-Turbine

Protection against last stage blade loss, LP-Turbine


(e.g. crash ring over bearing cover)
New Monoblock Rotor
New Inner Single Shell
Casing
3D-Blades Drum Stages
Modern LP Standard
Blades 8m2
Integral Guide Blade
Carriers
New Diffuser
New Rotor Oil-Lift System
Optimized Sealing
New Gland Sealing
Segments
Assumptions : Re-Use
Optimized Material Concept
Bearings (Re-Babbitt)
Machining of Outer Casing
Outer Casing
Rework of the
Gland Casings
Restricted © Siemens AG 2013 All rights reserved. outer casing
Siemens Solutions for LMZ Fossil 300MW
LP-Turbine

Scope of LP Turbine (2nd and 3rd Flow) Modernization


• New Monoblock Double-Flow Rotor with reaction blading and 8 m2
Exhaust End
• New Inner Casing (steam inlet)
• New Stationary Blade Carriers
• Modification of the Front-End Gland Carriers with Spring-Suspended
Seal Segments
• Rework of Bearing No 4 and 5 for the Installation of the Jacking Oil
System
• Machining of the Outer Casing
• Installation of a Water Injection System after the last Stage (2nd and
3rd Flow)
• Stiffening rods underneath LP bearing housing
• LP Efficiency after retrofit of LP : 86,0…89,0%

Restricted © Siemens AG 2013 All rights reserved.


Turbine Modernization Concepts
Blade Design Features

Module Stages: Rotating Blades Integral


Shroud

Sealing
• La-0 Fins
- free standing
- forged
- fir-tree root Leading
Edge

• La-1 Leading
- shrouded Edge
- forged
- fir-tree root

• La-2
Fir Tree
- shrouded Root
- milled
- T-root Free-standing rotating
blade with fir-tree root Shrouded rotating blade with fir-tree root
Restricted © Siemens AG 2013 All rights reserved.
Turbine Modernization Concepts
Blade Features of the LP Turbines – La-0

Design Features Rotating Blades


Full 3D Design
Freestanding L-0
Shrouded La-1 and La-2
Thin Trailing Edges
Supersonic Airfoil
Flame Hardened Leading Edges
Curved Fir Tree Root Design

Restricted © Siemens AG 2013 All rights reserved.


Turbine Modernization Concepts
Blade Features of the LP Turbines

Design Features
Stationary Blades

• Full 3D Design for optimum


radial flow distribution and
low exhaust loss
• Thin Trailing Edge
• Hollow Vanes
• Moisture Suction Slots
• Welded Blade Rings

Welded Blade Ring

Single Hollow Vane


Prepared for Welding

Restricted © Siemens AG 2013 All rights reserved.


Turbine Modernization Concepts
LP Blading Erosion Mitigation

Connected to
condenser

To
Condenser

No severe erosion observed


a Drainage through extractions A1/A2
on modern designs with
b Cylinder drainage to extraction
optimized materials e.g.
chromium steel for segmental c Hollow guide vane suction slots
---- Watertrails
rings in final LP stages
Restricted © Siemens AG 2013 All rights reserved.
• Introduction
• Concepts
• Modernization Products
• Conclusions and Summary

Luis Sanchez – October 2nd 2013

Meeting with Pampa Energia


Buenos Aires

Restricted © Siemens AG 2013 All rights reserved.


Page 36 2013-09-30 E F PR SU EN MO
ECONOMIC ANALYSIS
IN-KIND REPLACEMENT vs MODERNIZATION

NOTE: All figures are indicative values for comparison purposes only

Page 37 2 October 2013 Copyright © Siemens AG 2013 Energy Sector


ECONOMIC ANALYSIS
IN-KIND REPLACEMENT vs MODERNIZATION (cont)

NOTE: All figures are indicative values for comparison purposes only

Page 38 2 October 2013 Copyright © Siemens AG 2013 Energy Sector


Tender and Project Roadmap
Input for Tendering

Restricted © Siemens AG 2013 All rights reserved.


Page 39 2013-10-02 Steam Turbine Design
Possible Time Line
PLAN

2013 2014 2015 2016


2007 2017 2008
O N D J F M A M J J A S ON D J F M A M J J A S ON D J F M A M J J A S ON D J F M A M J J A S O N D

Customer
Budget Engineering, Fabrication and
Delivery
2010
Initial Budgetary Planning and Firm Contract OUTAGE
Meeting Proposal Authorization Proposal Award

Restricted © Siemens AG 2013 All rights reserved.


Tender and Project Roadmap
Input for Project Execution

Restricted © Siemens AG 2013 All rights reserved.


Page 41 2013-10-02 Steam Turbine Design
Tender and Project Roadmap
Typical Project Deliverables

Restricted © Siemens AG 2013 All rights reserved.


Page 42 2013-10-02 Steam Turbine Design
Tender and Project Roadmap
Summary Collaboration

Restricted © Siemens AG 2013 All rights reserved.


Page 43 2013-10-02 Steam Turbine Design
Summary - Conclusion

Demonstrated Capabilities to Modernize your Plant ...

Siemens Technology Provides the Optimal Solutions !

Improving efficiency with most modern technologies and materials


Maximizing capacity of existing unit with increased exhaust area
Gaining operation flexibility with reliable and well proven designs

We are able to upgrade your steam turbine on the basis of


our tools, knowledge and experience in close cooperation
with you, our customer!

Restricted © Siemens AG 2013 All rights reserved.


Page 44 2013-10-02 Steam Turbine Design
Pampas Energia - Customer Meeting

Thank You
for Your Attention!

© Siemens AG 2012. All rights reserved.


Page 45 March 2012 Iberdrola Cofrentes NPP Customer Meeting AL=N;ECCN=N.