Sunteți pe pagina 1din 20

Davao International Container Terminal

Bo. San Pedro, Panabo City

CHARGE TO : IRS Water Billing


CUT-OFF DATE : August 26, 2018 - September 26, 2018
DICT WHARF
Bo. San Pedro, Panabo City
W A T E R M E T E R R E A D I N G

PRESENT PREVIOUS WATER


DEPT./SECTION READING READING CONSUMPTION
9/26/18 8/26/18

PIL Water Meter 4901227 4659494 241,733.00


serial# 0106002211
APL Water Meter 1512014 1492923 19,091.00
serial #0106082383
IRS Water Meter 2 4415548 4338759 76,789.00
serial #0106002212

TOTAL ------------- 337.61 m³

Note: IRS Water Meter 1 Installed on Nov 21, 2017 starts @ 1304mᵌ
IRS Water Meter 2 Installed on Dec 09, 2017 starts @ 3886830mᵌ

Prepared by: Conformed by: Noted by:

J.C.CANONOY ENGR. W.V. KHO


Maintenance Engineer IRS Representative Manager-Eng'g & Maint.

Approved by:

V.E. ALONSO JR.


Senior Optn.Manager
NGR. W.V. KHO
nager-Eng'g & Maint.
Davao International Container Terminal
Bo. San Pedro, Panabo City

CHARGE TO : IRS @ Off-Dock 2


CUT-OFF DATE : August 26, 2018 - September 26, 2018
DICT WHARF
Bo. San Pedro, Panabo City
M E T E R R E A D I N G
LONE METER
PRESENT PREVIOUS ENERGY
DEPT./SECTION READING READING CONSUMPTION
9/26/18 8/26/18

IRS Offdock Office 7791 7695 96.00


G.E 220V Serial #81055897

TOTAL ------------- 96.00 Kwh.

Prepared by: Conformed by: Noted by:

J.C.CANONOY ENGR. W.V. KHO


Maintenance Engineer IRS Representative Manager-Eng'g & Maint.

Approved by:

V.E. ALONSO JR.


Senior Optn.Manager
Davao International Container Terminal
Bo. San Pedro, Panabo City

CHARGE TO : IRS @ Off-Dock


CUT-OFF DATE : August 26, 2018 - September 26, 2018
DICT WHARF
Bo. San Pedro, Panabo City
M E T E R R E A D I N G
LONE METER
PRESENT PREVIOUS ENERGY
DEPT./SECTION READING READING CONSUMPTION
9/26/18 8/26/18
OFF-DOCK
PIL Repair Area 1 G.E. 220 3568.9 3554 14.90
Serial # (94886666)

PIL Repair Area 2 G.E. 220 1983 1966 17.00


Serial # (57311703)

PIL Repair Area 3 G.E. 220 1249 1199 50.00


Serial # (87787345)

PIL Repair Area 4 G.E. 220 1367 0 1,367.00


Serial # (09505826)

PIL Repair Area 5 G.E. 220 51488 49547 1,941.00


Serial # (222843981)

PIL Washing (80050433) 10639 10245 394.00

APL Repair Area 1 G.E. 220 3220 3147 73.00


Serial # (80050272)

APL Repair Area 2 G.E. 220 1004 943 61.00


Serial # ( 69513680)

APL Washing (09505828) 1684 1155 529.00

TOTAL ------------- 4,446.90 Kwh.

Prepared by: Conformed by: Noted by:

J.C.CANONOY ENGR. W.V. KHO


Maintenance Engineer IRS Representative Manager-Eng'g & Maint.

Approved by:

V.E. ALONSO JR.


Senior Optn.Manager
Davao International Container Terminal
Bo. San Pedro, Panabo City

CHARGE TO : DEL MONTE


CUT-OFF DATE : August 26, 2018 - September 26, 2018
TADECO WHARF
Bo. San Pedro, Panabo City

M E T E R R E A D I N G

PRESENT PREVIOUS ENERGY


DEPT./SECTION DEL MONTE REP.
READING READING CONSUMPTION

9/26/18 8/26/18

SHIPPING OFFICE (94909466) 87652 85851 1,801.00 J.ROSARIO/RABORDO

QUALITY OFFICE(92819988) 12091 6765 5,326.00 B.DANIEL/C.BORRES

RECEIVING OFFICE(09505827) 700 0 700.00 J.ROSARIO/RABORDO

Metal Detector & Fumigation 719 714 5.00 J.ROSARIO/RABORDO


area @ Shed 1

TOTAL ------------- 7,832.00 Kwh.

Note: Power Meter for Receiving Office installed on Aug 26, 2018 kWh start 0.
Meter Type: Single Phase kWh Meter, Meter No: 09505827.

Prepared by: Noted by:

J.C.CANONOY ENGR. W.V. KHO


Maintenance Engineer Manager-Eng'g & Maint.

Approved by:

V.E. ALONSO JR.


Senior Optn.Manager
Davao International Container Terminal
Bo. San Pedro, Panabo City

CHARGE TO : APL-CMA
CUT-OFF DATE : August 26, 2018 - September 26, 2018
DICT WHARF
Bo. San Pedro, Panabo City

M E T E R R E A D I N G
LONE METER
PRESENT PREVIOUS ENERGY
DEPT./SECTION READING READING CONSUMPTION

9/26/18 8/26/18

APL-CMA Office 35753 35056 697.00

TOTAL ------------- 697.00 Kwh.

Prepared by: Conformed by: Noted by:

J.C.CANONOY ENGR. W.V. KHO


Maintenance Engineer APL-CMA Representative Manager-Eng'g & Maint.

Approved by:

V.E. ALONSO JR.


Senior Optn.Manager
Davao International Container Terminal
Bo. San Pedro, Panabo City

CHARGE TO : TADECO
CUT-OFF DATE : August 26, 2018 - September 26, 2018
TADECO WHARF
Bo. San Pedro, Panabo City

M E T E R R E A D I N G

PRESENT PREVIOUS ENERGY


DEPT./SECTION TADECO REP.
READING READING CONSUMPTION

9/26/18 8/26/18

TADECO RECEIVING 19387.3 18875.3 512.00 R.BRAVO

TADECO SHIPPING 106012 103869 2,143.00 J.M. AMADOR


77377702

TOTAL ------------- 2,655.00 Kwh.

Note: Power Meter for Tadeco Shipping installed on Aug 18, 2015 kWh start 0.
Meter Type: Single Phase kWh Meter, Meter No: 77377702.

Prepared by: Noted by:

J.C.CANONOY ENGR. W.V. KHO


Maintenance Engineer Manager-Eng'g & Maint.

Approved by:

V.E. ALONSO JR.


Senior Optn.Manager
Davao International Container Terminal
Bo. San Pedro, Panabo City

CHARGE TO : LAPANDAY FRUITS CORPORATION


CUT-OFF DATE : August 26, 2018 - September 26, 2018
TADECO WHARF
Bo. San Pedro, Panabo City

M E T E R R E A D I N G

PRESENT PREVIOUS ENERGY


DEPT./SECTION READING READING CONSUMPTION

9/26/18 8/26/18

Lapanday Receiving 60602.7 58724.2 1,878.50


Meter #0413

TOTAL ------------- 1,878.50 Kwh.

Prepared by: Conformed by: Noted by:

J.C.CANONOY ENGR. W.V. KHO


Maintenance Engineer Lapanday Representative Manager-Eng'g & Maint.

Approved by:

V.E. ALONSO JR.


Senior Optn.Manager
Davao International Container Terminal
Bo. San Pedro, Panabo City

CHARGE TO : PIL
CUT-OFF DATE : August 26, 2018 - September 26, 2018
DICT WHARF
Bo. San Pedro, Panabo City

M E T E R R E A D I N G
LONE METER
PREVIOU
PRESENT ENERGY
DEPT./SECTION READING
S
CONSUMPTION
READING

9/26/18 8/26/18

PIL Office 13040 12834 206.00

TOTAL ------------- 206.00 Kwh.

Prepared by: Noted by:

J.C.CANONOY ENGR. W.V. KHO


Maintenance Engineer Manager-Eng'g & Maint.

Approved by:

V.E. ALONSO JR.


Senior Optn.Manager
Davao International Container Terminal
Bo. San Pedro, Panabo City

CHARGE TO : DEL MONTE R.V.O.


CUT-OFF DATE : August 26, 2018 - September 26, 2018
TADECO WHARF
Bo. San Pedro, Panabo City

M E T E R R E A D I N G

PRESENT PREVIOUS ENERGY


DEPT./SECTION READING READING CONSUMPTION

9/26/18 8/26/18

DEL MONTE R.V.O 27903 27429 474.00


DICT BLDG.

TOTAL ------------- 474.00 Kwh.

Prepared by: Conformed by: Noted by:

J.C.CANONOY ENGR. W.V. KHO


Maintenance Engineer D.M.-R.V.O. Representative Manager-Eng'g & Maint.

Approved by:

V.E. ALONSO JR.


Senior Optn.Manager
Davao International Container Terminal
Bo. San Pedro, Panabo City

CHARGE TO : EAGLE EXPRESS LINES, INC.


CUT-OFF DATE : August 26, 2018 - September 26, 2018
TADECO WHARF
Bo. San Pedro, Panabo City

M E T E R R E A D I N G

PRESENT PREVIOUS ENERGY


DEPT./SECTION READING READING CONSUMPTION

9/26/18 8/26/18

Eagle Express Lines,Inc Office 4230 3952 278.00

TOTAL ------------- 278.00 Kwh.

Prepared by: Noted by:

J.C.CANONOY ENGR. W.V. KHO


Maintenance Engineer Manager-Eng'g & Maint.

Approved by:

V.E. ALONSO JR.


Senior Optn.Manager
Davao International Container Terminal
Bo. San Pedro, Panabo City

CHARGE TO : MARIANAS
CUT-OFF DATE : August 26, 2018 - September 26, 2018
TADECO WHARF
Bo. San Pedro, Panabo City

M E T E R R E A D I N G

PRESENT PREVIOUS ENERGY


DEPT./SECTION READING READING CONSUMPTION

9/26/18 8/26/18

Marianas Office 2672 1207 1,465.00

TOTAL ------------- 1,465.00 Kwh.

Note: Power Meter for Marianas installed on June 7, 2018 kWh start 0.
Meter Type: Single Phase kWh Meter, Meter No: 09505829.

Prepared by: Noted by:

J.C.CANONOY ENGR. W.V. KHO


Maintenance Engineer Manager-Eng'g & Maint.

Approved by:

V.E. ALONSO JR.


Senior Optn.Manager
Davao International Container Terminal
Bo. San Pedro, Panabo City

CHARGE TO : WANHAI LINES, LTD


CUT-OFF DATE : August 26, 2018 - September 26, 2018
TADECO WHARF
Bo. San Pedro, Panabo City

M E T E R R E A D I N G

PRESENT PREVIOUS ENERGY


DEPT./SECTION READING READING CONSUMPTION

9/26/18 8/26/18

Wanhai Lines, Ltd Office 1513 1470 43.00

TOTAL ------------- 43.00 Kwh.

Prepared by: Noted by:

J.C.CANONOY ENGR. W.V. KHO


Maintenance Engineer Manager-Eng'g & Maint.

Approved by:

V.E. ALONSO JR.


Senior Optn.Manager
Davao International Container Terminal
Bo. San Pedro, Panabo City

CHARGE TO : SITC
CUT-OFF DATE : August 26, 2018 - September 26, 2018
TADECO WHARF
Bo. San Pedro, Panabo City

M E T E R R E A D I N G

PRESENT PREVIOUS ENERGY


DEPT./SECTION READING READING CONSUMPTION

9/26/18 8/26/18

SITC 29154 29080 74.00

Note: Power Meter installed on May 2018 Kwh start 28829.

TOTAL ------------- 74.00 Kwh.

Prepared by: Conformed by: Noted by:

J.C.CANONOY ENGR. W.V. KHO


Maintenance Engineer SITC Representative Manager-Eng'g & Maint.

Approved by:

V.E. ALONSO JR.


Senior Optn.Manager
Davao International Container Terminal
Bo. San Pedro, Panabo City

CHARGE TO : DICT Canteen


CUT-OFF DATE : August 26, 2018 - September 26, 2018
TADECO WHARF
Bo. San Pedro, Panabo City

M E T E R R E A D I N G

PRESENT PREVIOUS ENERGY


DEPT./SECTION READING READING CONSUMPTION

9/26/18 8/26/18

DICT Canteen 14030.3 13751.1 279.20

Note: Power Meter installed on May 4, 2014 Kwh start 1199.9

TOTAL ------------- 279.20 Kwh.

Prepared by: Conformed by: Noted by:

J.C.CANONOY ENGR. W.V. KHO


Maintenance Engineer Canteen Representative Manager-Eng'g & Maint.

Approved by:

V.E. ALONSO JR.


Senior Optn.Manager
Davao International Container Terminal
Bo. San Pedro, Panabo City

CHARGE TO : DAPACOR (M&S Bodega)


CUT-OFF DATE : August 8, 2018 - September 26, 2018
TADECO WHARF .
Bo. San Pedro, Panabo City

M E T E R R E A D I N G

PRESENT PREVIOUS ENERGY


DEPT./SECTION READING READING CONSUMPTION

9/26/18 8/8/18

DAPACOR (M&S Bodega) 574 0 574.00


09505825

Note: Power Meter installed on August 8, 2018. kWh starts at 0

TOTAL ------------- 574.00 Kwh.

Prepared by: Conformed by: Noted by:

J.C.CANONOY ENGR. W.V. KHO


Maintenance Engineer DAPACOR Representative Manager-Eng'g & Maint.

Approved by:

V.E. ALONSO JR.


Senior Optn.Manager
Davao International Container Terminal
Bo. San Pedro, Panabo City

CHARGE TO : DILCO Construction


CUT-OFF DATE : August 26, 2018 - September 26, 2018
TADECO WHARF
Bo. San Pedro, Panabo City

M E T E R R E A D I N G

PRESENT PREVIOUS ENERGY


DEPT./SECTION READING READING CONSUMPTION

9/20/18 8/26/18

DILCO Construction 6270.4 6255.1 15.30


serial 2006-12-000242

Note: Power Meter installed on July 28, 2018 Kwh start 6252.5

TOTAL ------------- 15.30 Kwh.

Prepared by: Conformed by: Noted by:

J.C.CANONOY ENGR. W.V. KHO


Maintenance Engineer DILCO Representative Manager-Eng'g & Maint.

Approved by:

V.E. ALONSO JR.


Senior Optn.Manager
Davao International Container Terminal
Bo. San Pedro, Panabo City

CHARGE TO : RJ Prefab. Construction


CUT-OFF DATE : August 26, 2018 - September 26, 2018
TADECO WHARF
Bo. San Pedro, Panabo City

M E T E R R E A D I N G

PRESENT PREVIOUS ENERGY


DEPT./SECTION READING READING CONSUMPTION

9/26/18 8/26/18

RJ Prefab. Construction 24.8 20 4.80


serial 2017-122-78251

Note: Power Meter installed on July 28, 2018 Kwh start 6252.5

TOTAL ------------- 4.80 Kwh.

Prepared by: Conformed by: Noted by:

J.C.CANONOY ENGR. W.V. KHO


Maintenance Engineer RJ Prefab Representative Manager-Eng'g & Maint.

Approved by:

V.E. ALONSO JR.


Senior Optn.Manager
Compatibility Report for June-July 2016 Billing and Reading.xls
Run on 27/08/2016 14:29

The following features in this workbook are not supported by earlier versions of
Excel. These features may be lost or degraded when opening this workbook in
an earlier version of Excel or if you save this workbook in an earlier file format.

Minor loss of fidelity # of occurrences

Some cells or styles in this workbook contain formatting that is not supported 12
by the selected file format. These formats will be converted to the closest
format available.
Version

Excel 97-2003

S-ar putea să vă placă și