Drawings and Estimates for Structures Package estimates and DTP for Modernization of Cana
Sr.Engineer
Sr.No. Description Reso
1 Collection of Data
2 Reconnaissance survey
4 Earthwork excavation
For trail pits / borrow pits and other investigation works including boulders up
to 30 cm diameter and disposing off excavated soil
i.in all kinds of soil 1
ii.in soft rock
5 Drilling
i.80 mm dia using shoe bit
ii. 76 mm dia in soft rock using diamond core bit 1
iii.47 mm dia in hard rock using diamond core bit
6 Geotechnical investigations 1
7 Detailed Project Report
i. Hydrologic calculations 1
ii. Design and Drafting 1
iii. Estimation and BOQ 1
Sr.No. Description Reso
Sr.Engineer
Sr.No. Description Reso
1 Collection of Data
2 Reconnaissance survey
4 Earthwork excavation
Sr.No. Description Reso
For trail pits / borrow pits and other investigation works including boulders up
to 30 cm diameter and disposing off excavated soil
i.in all kinds of soil 1
ii.in soft rock
5 Drilling
i.80 mm dia using shoe bit
ii. 76 mm dia in soft rock using diamond core bit 1
iii.47 mm dia in hard rock using diamond core bit
6 Geotechnical investigations 1
7 Detailed Project Report
i. Hydrologic calculations 1
ii. Design and Drafting 1
iii. Estimation and BOQ 1
8 Preparation of Bid documents 1
"Reconnaissance survey, Topographical Survey of Ghataprabha Right Bank Canal (Ch. 100.0 K
Package estimates and DTP for Modernization of Canal systems under Ghataprabha Project"
Sr.Engineer
Sr.No. Description Reso
1 Collection of Data
(i) Topo sheets of the area
(ii) Current schedule of rates
(iii) Details of Ghataprabha Right Bank Canal 1
(iv) Hydrological details
2 Reconnaissance survey
4 Earthwork excavation
For trail pits / borrow pits and other investigation works including boulders up
to 30 cm diameter and disposing off excavated soil
i.in all kinds of soil 1
ii.in soft rock
5 Drilling
i.80 mm dia using shoe bit
ii. 76 mm dia in soft rock using diamond core bit 1
iii.47 mm dia in hard rock using diamond core bit
6 Preparation of KM wise Estimates for Modernization
Sr.No. Description Reso
Sr.Engineer
Sr.No. Description Reso
1 Collection of Data
2 Reconnaissance survey
4 Earthwork excavation
Sr.No. Description Reso
For trail pits / borrow pits and other investigation works including boulders up
to 30 cm diameter and disposing off excavated soil
i.in all kinds of soil 1
ii.in soft rock
5 Drilling
i.80 mm dia using shoe bit
ii. 76 mm dia in soft rock using diamond core bit 1
iii.47 mm dia in hard rock using diamond core bit
6 Preparation of KM wise Estimates for Modernization
9 Geotechnical Investigation
10 Detailed Project Report
i. Hydrologic calculations 1
ii. Design and Drafting 1
iii. Estimation and BOQ 1
11 Preparation of Bid documents 1