Sunteți pe pagina 1din 14

"Reconnaissance Survey, Topographical Survey of Distributary Network coming under Chikk

Drawings and Estimates for Structures Package estimates and DTP for Modernization of Cana

Cost of Project -1.8674 Cr.

Total Length - 370 km

Sr.No. Description Reso

Sr.Engineer
Sr.No. Description Reso

1 Collection of Data

(i) Topo sheets of the area


(ii) Current schedule of rates
(iii) Details of Distributary Network coming under Chikkodi Branch Canal, 1
Kotabagi LIS, Rustumpur LIS, Kochari LIS, Kurni LIS,
(iv) Hydrological details

2 Reconnaissance survey

Reconnaissance survey of the Distributary Network coming under Chikodi


Branch Canal, Kotabagi LIS, Rustampur LIS, Kochari LIS, Kurni LIS under
Ghataprabha Project for identifying the condition of existing canal system
including structures and identification of reaches where rehabilitation and
modernization are required, complete video of the reach by using Drone
equipment, etc.
i. Chikkodi Branch Canal -188Km
ii. Kotabagi LIS - 60 Km
iii. Rustumpur LIS - 20 Km 1
iv. Masarguppi Branch Canal - 25 Km
v. Shirgaon Branch Canal - 10 Km
vi. Avargol Distributary - 3.0 Km
vii. Noginal Distributary - 5.0 Km
viii. Kochari flow Distributary- 20 km
ix. Kurni Flow- 6 Km
x. Kurni 1st Stage LIS- 30 Km
Total = 370 Km.

3 Detailed survey and investigation


Sr.No. Description Reso

i. cross section of the canal at every 20 m interval


ii. preparation of Design and Drawing for as per design incorporating all
necessary data
iii. preparation of KM wise estimates for Earthwork and lining along with
necessary design
iv. drawing Km wise L-section(scale::Horizontal 1 in 2000, 1
v. cross section of existing canal network (Scale 1 in 100)
vi. super imposing the proposed cross section of canal as per design showing
proposed bed width, FSD,FB and thickness of lining
vii. preparation of KM wise cost estimates and package wise draft tender
documents

4 Earthwork excavation

For trail pits / borrow pits and other investigation works including boulders up
to 30 cm diameter and disposing off excavated soil
i.in all kinds of soil 1
ii.in soft rock

5 Drilling
i.80 mm dia using shoe bit
ii. 76 mm dia in soft rock using diamond core bit 1
iii.47 mm dia in hard rock using diamond core bit
6 Geotechnical investigations 1
7 Detailed Project Report
i. Hydrologic calculations 1
ii. Design and Drafting 1
iii. Estimation and BOQ 1
Sr.No. Description Reso

8 Preparation of Bid documents 1


"Reconnaissance Survey, Topographical Survey of Distributary Network coming under Ghatap
estimates and DTP for Modernization of Canal systems under Ghataprabha Project"

Cost of Project -2.0303 Cr.

Total Length - 404 km

Sr.No. Description Reso

Sr.Engineer
Sr.No. Description Reso

1 Collection of Data

(i) Topo sheets of the area


(ii) Current schedule of rates
(iii) Details of Distributary Network coming under Ghataprabha Right Bank 1
Canal
(iv) Hydrological details

2 Reconnaissance survey

Reconnaissance survey of the Distributary Network coming under Chikodi


Branch Canal, Kotabagi LIS, Rustampur LIS, Kochari LIS, Kurni LIS under
Ghataprabha Project for identifying the condition of existing canal system
including structures and identification of reaches where rehabilitation and 1
modernization are required, complete video of the reach by using Drone
equipment, etc.
i. Ghataprabha Right Bank Canal - 404 km

3 Detailed survey and investigation

i. cross section of the canal at every 20 m interval


ii. preparation of Design and Drawing for as per design incorporating all
necessary data
iii. preparation of KM wise estimates for Earthwork and lining along with
necessary design
iv. drawing Km wise L-section(scale::Horizontal 1 in 2000, 1
v. cross section of existing canal network (Scale 1 in 100)
vi. super imposing the proposed cross section of canal as per design showing
proposed bed width, FSD,FB and thickness of lining
vii. preparation of KM wise cost estimates and package wise draft tender
documents

4 Earthwork excavation
Sr.No. Description Reso

For trail pits / borrow pits and other investigation works including boulders up
to 30 cm diameter and disposing off excavated soil
i.in all kinds of soil 1
ii.in soft rock

5 Drilling
i.80 mm dia using shoe bit
ii. 76 mm dia in soft rock using diamond core bit 1
iii.47 mm dia in hard rock using diamond core bit
6 Geotechnical investigations 1
7 Detailed Project Report
i. Hydrologic calculations 1
ii. Design and Drafting 1
iii. Estimation and BOQ 1
8 Preparation of Bid documents 1
"Reconnaissance survey, Topographical Survey of Ghataprabha Right Bank Canal (Ch. 100.0 K
Package estimates and DTP for Modernization of Canal systems under Ghataprabha Project"

Cost of Project - 1.1909 Cr.

Total Length - ch 100 to ch 199

Sr.No. Description Reso

Sr.Engineer
Sr.No. Description Reso

1 Collection of Data
(i) Topo sheets of the area
(ii) Current schedule of rates
(iii) Details of Ghataprabha Right Bank Canal 1
(iv) Hydrological details
2 Reconnaissance survey

Reconnaissance survey of the Ghataprabha Right Bank Canal (Ch. 100.0 Km to


Ch. 199.0 Km) for identifying the condition of existing canal system including
structures and identification of reaches where rehabilitation and 1
modernization are required, complete video of the reach by using necessary
equipment

3 Detailed survey and investigation

Conducting detailed topographical survey and investigation, taking cross


section and L-section of the canal at every 20 m interval, establishing control
points/TBMs at every 500m by using Drone/DGPS/Total station . 1
Ghataprabha Right Bank Canal (Ch. 100.0 Km to Ch. 199.0 Km)

4 Earthwork excavation

For trail pits / borrow pits and other investigation works including boulders up
to 30 cm diameter and disposing off excavated soil
i.in all kinds of soil 1
ii.in soft rock

5 Drilling
i.80 mm dia using shoe bit
ii. 76 mm dia in soft rock using diamond core bit 1
iii.47 mm dia in hard rock using diamond core bit
6 Preparation of KM wise Estimates for Modernization
Sr.No. Description Reso

i. Estimates for Modernisation comprising Earthwork and lining along with


necessary design and drawing
ii. Km wise L-section(scale::Horizontal 1 in 2000, any revised hydraulic
particulars
iii.cross section of existing canal network (Scale 1 in 100) 1
iv.super imposing the proposed cross section of canal as per design showing
proposed bed width, FSD,FB and thickness of lining
v.preparation of package wise draft tender documents

7 Conducting Detailed Testing 1


i.(Non Destructive Testing of Structures, assessment of Hydraulic and
Structural strength of the structure)
ii.Proposing for repair/reconstruction
iii.Preparation of designs, drawings, estimates for dismantling and 1
reconstruction of structures as per reconnaissance survey report for Structures
Under Ghataprabha Project Major structures such as, Aqueducts, Chute, Box
Culverts, Syphons, Major Road Bridges

8 Designs, Drawings and Estimates


Preparation of designs, drawings, estimates for dismantling and reconstruction
of structures as per reconnaissance survey report for Structures along
Ghataprabha Right Bank Canal such as Head Regulators, Cross Regulators, 1
Road Bridges, Culverts Super Passages,
9 Geotechnical Investigation
10 Detailed Project Report
i. Hydrologic calculations 1
ii. Design and Drafting 1
iii. Estimation and BOQ 1
11 Preparation of Bid documents 1
"Reconnaissance survey, Topographical Survey of Ghataprabha Right Bank Canal (Ch. 16.0 Km
Drawings and Estimates for Structures preparation of Detailed Project Report, Package estima

Cost of Project - 1.7978 Cr.

Total Length - 142 km

Sr.No. Description Reso

Sr.Engineer
Sr.No. Description Reso

1 Collection of Data

(i) Topo sheets of the area


(ii) Current schedule of rates
(iii)Ghataprabha Right Bank Canal (Ch. 16.0 Km to Ch. 100.0 Km) and Chikodi 1
Branch Canal (Ch. 30.0 Km to Ch. 88.0 Km).
(iv) Hydrological details

2 Reconnaissance survey

Reconnaissance survey of the Ghataprabha Right Bank Canal (Ch. 16.0 Km to


Ch. 100.0 Km) and Chikodi Branch Canal (Ch. 30.0 Km to Ch. 88.0 Km) for
identifying the condition of existing canal system including structures and
identification of reaches where rehabilitation and modernization are required,
complete video of the reach by using necessary equipment 1
i.i. Ghatapbha Right Bank Canal-85 Km
ii. Chikodi Branch Canal -57 Km
Total = 142 Km

3 Detailed survey and investigation

Conducting detailed topographical survey and investigation, taking cross


section and L-section of the canal at every 20 m interval, establishing control
points/TBMs at every 500m by using Drone/DGPS/Total station .
i. Ghatapbha Right Bank Canal-85 Km 1
ii. Chikodi Branch Canal -57 Km
Total = 142 Km

4 Earthwork excavation
Sr.No. Description Reso

For trail pits / borrow pits and other investigation works including boulders up
to 30 cm diameter and disposing off excavated soil
i.in all kinds of soil 1
ii.in soft rock

5 Drilling
i.80 mm dia using shoe bit
ii. 76 mm dia in soft rock using diamond core bit 1
iii.47 mm dia in hard rock using diamond core bit
6 Preparation of KM wise Estimates for Modernization

i. Estimates for Modernisation comprising Earthwork and lining along with


necessary design and drawing
ii. Km wise L-section(scale::Horizontal 1 in 2000, any revised hydraulic
particulars
iii.cross section of existing canal network (Scale 1 in 100) 1
iv.super imposing the proposed cross section of canal as per design showing
proposed bed width, FSD,FB and thickness of lining
v.preparation of package wise draft tender documents

7 Conducting Detailed Testing 1


i.(Non Destructive Testing of Structures, assessment of Hydraulic and
Structural strength of the structure)
ii.Proposing for repair/reconstruction
iii.Preparation of designs, drawings, estimates for dismantling and 1
reconstruction of structures as per reconnaissance survey report for Structures
Under Ghataprabha Project Major structures such as, Aqueducts, Chute, Box
Culverts, Syphons, Major Road Bridges

8 Designs, Drawings and Estimates


Sr.No. Description Reso

Preparation of designs, drawings, estimates for dismantling and reconstruction


of structures as per reconnaissance survey report for Structures along
Ghataprabha Right Bank Canal such as Head Regulators, Cross Regulators,
Road Bridges, Culverts Super Passages, and Proposing for repair, Preparation 1
of designs, drawings, estimates for Kadabagatti tunnel coming in the reach
21+000 to 28+000 Km of Ghataprabha Right Bank Canal.

9 Geotechnical Investigation
10 Detailed Project Report
i. Hydrologic calculations 1
ii. Design and Drafting 1
iii. Estimation and BOQ 1
11 Preparation of Bid documents 1