Sunteți pe pagina 1din 3

ZESHAN ABAS

Objective
To enter professional life in order to apply various technical skills acquired during my
academic career by joining a team of innovative, methodical, and motivated
individuals of an organization that excels in providing opportunity to creative skills
and new initiatives. I am looking for a new challenge in my career and I believe that
my role with your organization, offers me a chance to grow and further develop my
retail career.

Professional Skills:
Skills in implementation Roll Out at GSM projects, Managing & control Civil Works
of sites, Monitoring of Sub contractors, Coordination with Customer, Quality control
of concrete works, Monitoring all Civil Work, fill up Quality check lists and sites hand
over to customer. To prepare the Roll Out plans, check the Invoices of Contractors.
Monitoring of PAC & FAC schedule. Monitoring the installation of BTS racks, ATs
pole, ACDB pole and Cable ladder, positioning, leveling and Grounding. Monitoring
the Installation of RF Antennas, MW Dishes, Monitoring the progress of civil works
according to planned schedule.

NIC#43104-2272009-1 Professional Experience


Passport# AR5770091 Sep 07 to Till Date
DOB: 14th April 1981 Alcatel-Lucent Pakistan (Pvt.) Ltd Islamabad.
Post: Civil Works & Acceptance Engineer
Mailing Adress. Project: CMPAK (PAKTEL) GSM (Telecommunication)
Responsibilities:
Village: Madrissa Chatta Working as Civil Works & Acceptance Engineer at the Project of CMPAK
P.O. Qadirabad colony
Tehsil: Wazirabad GSMTelecommunication and skills in implementation Roll Out, Managing & control
Disttrict: Gujranwala Civil Works of sites, Monitoring of Sub contractors, Coordination with Customer,
Checking Installation of Towers, Quality control of concrete works, and all Civil Work,
fill up Quality check lists and sites hand over to customer. To prepare the PAC & FAC
Cell: & TSSR, Check the Invoices of Contractors.
+923018494409 Main Responsibilities:
• Checking of SAR & TSSR (Technical Site Survey Reports) of new BTS site.
E-mail addresses
• Checking the Layout Sketches of New Tower and DG Pad Location
zeshanstar007@gmail.com
according to Specific Drawings.
• Pre-Construction walk with the Sub-contractor.
• Checking of Orientation, Layout, and Excavation, Alignment, Leveling,
Grounding, Reinforcement & Concreting of New Tower & DG Pad.
• Checking the quality of material according to specifications.
• Checking the Installation of Genset, Fuel Tank, ACDB, ATS and all the
Electric power connections.
• Monitoring the installation of BTS racks, ATs pole, ACDB pole and Cable
ladder, positioning, leveling and Grounding.
• Monitoring the Installation of RF Antennas ,MW Dishes,
• Lightning Arrestor & Aircraft warning lights.
• Monitoring the installation of Fence.
• Completion of Quality check list.
• Completion of civil works check list.
• Monitoring the progress of civil works according to planned schedule

August 05 to Sep 2007


Huawei Technologies Pakistan (Pvt.) Ltd Lahore.
Post: CW Engineer
Project: 1. UFONE Project Phase (V) GSM (Telecommunication)
Responsibilities:
Worked as CW Engineer at the project of the UFONE Expansion GSM. Checking
Installation of Towers, Quality controls, and all Civil Work, fill up Quality check lists
and sites hand over to customer. Fill up Quality check lists and sites hand over to
customer, to conducting PAC & FAC. To prepare the PAC & FAC schedule, To
prepare the TSSR, Check the Invoices of Contractors. To look after BSC sites and
MSC sites. Since August 2006 to Sep 2007.
Main Responsibilities:
NIC#43104-2272009-1 • Implementation of the civil works according to design in Mountainous Areas.
Passport# AR5770091 • Acceptances of sites from Customer (Ufone)
DOB: 14th April 1981 • Check the Invoices of Contractors.
• To install the different types of towers.
Mailing Adress. • To prepare the TSSR (Technical Site Survey Report)
• Check the Invoices of Contractors.
Village: Madrissa Chatta • Checking of SAR & TSSR of new BTS site.
P.O. Qadirabad colony • Site Kick Off and Checking the Layout Sketches of New Tower and DG Pad
Tehsil: Wazirabad Location according to Specific Drawings.
Disttrict: Gujranwala • Pre-Construction walk with the Sub-contractor.
• Checking of Orientation, Layout, and Excavation, Alignment, Leveling,
Grounding, Reinforcement & Concreting of New Tower & DG Pad.
Cell:
• Checking the quality of material according to specifications.
+923018494409
• Checking the Installation of Genset, Fuel Tank, ACDB, ATS and all the
Electric power connections.
E-mail addresses • Monitoring the installation of BTS racks, ATs pole, ACDB pole and Cable
zeshanstar007@gmail.com ladder, positioning, leveling and Grounding.

August 04 to August 05
Capital Construction Islamabad
Post: Civil Engineer
Project: Projects of Telenor Phase ll & lll
Responsibilities:

Worked as Civil Engineer at the Projects of Telenor GSM (NOKIA)


Telecommunication and skills in Managing of sites, Calculation of Quantities,
Installation of Tower, Quality control, steel work and all Civil Work.
Since 2004 to Aug 2005.
• Checking the Layout Sketches of New Tower and DG Pad Location
according to Specific Drawings.
• Checking of Orientation, Layout, and Excavation, Alignment, Leveling,
Grounding, Reinforcement & Concreting of New Tower & DG Pad.
• Monitoring the installation of ATs pole, ACDB pole and Cable ladder,
positioning, leveling and Grounding.

Education and Qualification:

B.SC (Bachelor of Engineering in Civil Technology)


University of Engineering Technology Lahore.
Secession 2000 to 2004

D.A.E( Diploma of Associate Engineer in Civil)


Govt.College of technology Rasul.
(Under Punjab Board of Technical Education Lahore)
Session 1997 to 2000
Metric ( Science )
Govt.High School Sooianwala (Gujranwala Board)
Session 1997
NIC#43104-2272009-1
Passport# AR5770091
DOB: 14th April 1981
Additional Skills:
Mailing Adress. Professional skills in Ms Word, Ms Excel, MS Power point.
Have the ability to work independently, work under the stress, Learn Quickly, Plan
Village: Madrissa Chatta and Manage effectively.
P.O. Qadirabad colony Fluent in English And Urdu.
Tehsil: Wazirabad
Disttrict: Gujranwala
Salient Features:

Cell: • Have a special interest & approach in Tower (Cell Phone). Field.
+923018494409
• Command over Construction Management.

E-mail addresses • Target & Result Oriented, Self motivated.


zeshanstar007@gmail.com
• Well Versed in English & Urdu (Spoken & Written).

• Respectable Skill of Supervision & organizing.

• Expert in Handling labour & workers and subcontractors.

• Decisive straightforward, Crises & Troubleshooting managerial skills.

• Co-operative, initiative, courageous & supportive.

S-ar putea să vă placă și