1 Signing of contract 0 days Tue 31.07.07 Tue 31.07.07 31.07
2 Nomination of Contractors representative 28 days Thu 30.08.07 Mon 08.10.07
3 Establishment of Site-Office 45 days Tue 20.11.07 Mon 21.01.08
4 Submission of Performance Bank Guarantee (PBG), 5% 42 days Wed 01.08.07 Thu 27.09.07
5 Opening of 100% LC by Employer 41 days Fri 28.09.07 Fri 23.11.07
6 Master PERT Network - Submission 28 days Wed 17.10.07 Fri 23.11.07
7 Billing schedule - submission 60 days Mon 26.11.07 Fri 15.02.08
8 Shipping schedule - submission 90 days Mon 26.11.07 Fri 28.03.08
9 Issue and submission of List of Drawings 44 days Wed 17.10.07 Mon 17.12.07
10 2. Basic Engineering 106 days Mon 06.08.07 Mon 31.12.07
11 2.1 Issue of initial data for basic engineering to PROJECT 44 days Mon 06.08.07 Thu 04.10.07
DESIGN
12 2.2. Issue of technical assignments for long term Equipment 29 days Fri 05.10.07 Wed 14.11.07

13 2.3 Issue and submission of GA and Site plan drawings 30 days Fri 05.10.07 Thu 15.11.07
14 2.4 Issue and submission of P&I Diagram 52 days Fri 05.10.07 Mon 17.12.07
15 2.5 Issue and submission of PFD 52 days Fri 05.10.07 Tue 18.12.07
16 2.6 Issue and submission of SLD (Electrical) 52 days Fri 05.10.07 Tue 18.12.07
17 2.7 Issue and submission of Quality Assurance Plan 46 days Mon 15.10.07 Mon 17.12.07
18 2.8 Issue and submission of Name plate and numbering 45 days Tue 25.09.07 Tue 27.11.07
system
19 2.9 Issue and submission of other drawings 52 days Fri 05.10.07 Mon 17.12.07
20 2.10 Approval of basic engineering 10 days Tue 18.12.07 Mon 31.12.07
21 3. Detailed Engineering, Production and Delivery 361 days? Tue 20.11.07 Tue 07.04.09
22 3.1 Project Work 139 days? Tue 20.11.07 Fri 30.05.08
23 3.1.1 Issue of initial data for detailed engineering to 15 days Tue 20.11.07 Mon 10.12.07
PROJECT DESIGN
24 3.1.2 TS of main technological equipment and power 24 days? Tue 11.12.07 Fri 11.01.08
equipment
25 3.1.4 Foundation drawings of cold box, TEC 44 days Tue 11.12.07 Fri 08.02.08
26 3.1.5 Foundation drawings of main technological 66 days Tue 11.12.07 Tue 11.03.08
equipment
27 3.1.6 Main specifications 60 days Mon 14.01.08 Fri 04.04.08
28 3.1.7 Finalised general layout and external network 86 days? Mon 14.01.08 Mon 12.05.08
29 3.1.8 Approval of Detailed Engineering 14 days Tue 13.05.08 Fri 30.05.08
30 3.2 Engineering, Production and Delivery 361 days? Tue 20.11.07 Tue 07.04.09
31 3.2.1 BP 10 Set of heat exchangers (25T) 309 days? Tue 20.11.07 Fri 23.01.09
32 3.2.1.1 Issue of TS to supplier 0 days Tue 20.11.07 Tue 20.11.07 20.11
33 3.2.1.2 Offer from supplier 16 days? Tue 20.11.07 Tue 11.12.07
34 3.2.1.3 Signing of contract 15 days Tue 01.01.08 Mon 21.01.08
35 3.2.1.4 Production and dispatch 220 days Tue 22.01.08 Mon 24.11.08
36 3.2.1.5 Delivery at site 44 days Tue 25.11.08 Fri 23.01.09
37 3.2.2 BP 20 PPU (20T) 264 days Tue 20.11.07 Fri 21.11.08
38 3.2.2.1 Design 44 days Tue 20.11.07 Fri 18.01.08
39 3.2.2.2 Technological preproduction planning 44 days Mon 21.01.08 Thu 20.03.08
40 3.2.2.3 Production and dispatch 132 days Fri 21.03.08 Mon 22.09.08
41 3.2.2.4 Delivery at site 44 days Tue 23.09.08 Fri 21.11.08
42 3.2.3 BP 21 PPU Valves (5T) 265 days? Tue 20.11.07 Mon 24.11.08
43 3.2.3.1 Issue of TS to supplier 22 days Tue 20.11.07 Wed 19.12.07
44 3.2.3.2 Offer from supplier 22 days Thu 20.12.07 Fri 18.01.08

Task Milestone Rolled Up Critical Task Split Group By Summary


Project: BSP PERT
Critical Task Summary Rolled Up Milestone External Tasks Deadline
Date: Mon 31.12.07
Progress Rolled Up Task Rolled Up Progress Project Summary

Page 1
ID Название задачи Duration Start Finish 7 Qtr 3, 2007 Qtr 4, 2007 Qtr 1, 2008 Qtr 2, 2008 Qtr 3, 2008 Qtr 4, 2008 Qtr 1, 2009 Qtr 2, 2009 Qtr 3, 2009
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
45 3.2.3.3 Signing of contract 10 days Mon 11.02.08 Fri 22.02.08
46 3.2.3.4 Production and dispatch 132 days Mon 24.03.08 Tue 23.09.08
47 3.2.3.5 Delivery at site 44 days? Wed 24.09.08 Mon 24.11.08
48 3.2.4 BP 22 Adsorbents (50T) 235 days Mon 21.01.08 Fri 12.12.08
49 3.2.4.1 Issue of TS to supplier 10 days Mon 21.01.08 Fri 01.02.08
50 3.2.4.2 Offer from supplier 22 days Mon 04.02.08 Tue 04.03.08
51 3.2.4.3 Signing of contract 15 days Wed 05.03.08 Tue 25.03.08
52 3.2.4.4 Production and dispatch 66 days Mon 14.07.08 Mon 13.10.08
53 3.2.4.5 Delivery at site 44 days Tue 14.10.08 Fri 12.12.08
54 3.2.5 BP 23 Basalt grit (104T) 163 days Wed 30.04.08 Fri 12.12.08
55 3.2.5.1 Issue of TS to supplier 15 days Wed 30.04.08 Tue 20.05.08
56 3.2.5.2 Offer from supplier 10 days Mon 26.05.08 Fri 06.06.08
57 3.2.5.3 Signing of contract 15 days Mon 16.06.08 Fri 04.07.08
58 3.2.5.4 Production and dispatch 66 days Mon 14.07.08 Mon 13.10.08
59 3.2.5.5 Delivery at site 44 days Tue 14.10.08 Fri 12.12.08
60 3.2.6 BP 50 Lower Column (4T) 264 days Tue 20.11.07 Fri 21.11.08
61 3.2.6.1 Design 44 days Tue 20.11.07 Fri 18.01.08
62 3.2.6.2 Technological preproduction planning 44 days Mon 21.01.08 Thu 20.03.08
63 3.2.6.3 Production and dispatch 132 days Fri 21.03.08 Mon 22.09.08
64 3.2.6.4 Delivery at site 44 days Tue 23.09.08 Fri 21.11.08
65 3.2.7 BP 51 Set of Lower Column Internals (7T) 235 days? Tue 20.11.07 Mon 13.10.08
66 3.2.7.1 Issue of TS to supplier 10 days Tue 20.11.07 Mon 03.12.07
67 3.2.7.2 Offer from supplier 14 days? Tue 04.12.07 Fri 21.12.07
68 3.2.7.3 Signing of contract 13 days? Mon 24.12.07 Wed 09.01.08
69 3.2.7.4 Production and dispatch 154 days Thu 10.01.08 Tue 12.08.08
70 3.2.7.5 Delivery at site 44 days Wed 13.08.08 Mon 13.10.08
71 3.2.8 BP 60 Upper Column (3T) 270 days Tue 20.11.07 Mon 01.12.08
72 3.2.8.1 Design 38 days Tue 20.11.07 Thu 10.01.08
73 3.2.8.2 Technological preproduction planning 38 days Fri 11.01.08 Tue 04.03.08
74 3.2.8.3 Production and dispatch 154 days Wed 05.03.08 Mon 06.10.08
75 3.2.8.4 Delivery at site 40 days Tue 07.10.08 Mon 01.12.08
76 3.2.9 BP 61 Set of Upper Column Internals (5T) 263 days? Tue 20.11.07 Thu 20.11.08
77 3.2.9.1 Issue of TS to supplier 5 days Tue 20.11.07 Mon 26.11.07
78 3.2.9.2 Offer from supplier 14 days? Tue 27.11.07 Fri 14.12.07
79 3.2.9.3 Signing of contract 13 days? Tue 01.01.08 Thu 17.01.08
80 3.2.9.4 Production and dispatch 176 days Fri 18.01.08 Fri 19.09.08
81 3.2.9.5 Delivery at site 44 days Mon 22.09.08 Thu 20.11.08
82 3.2.10 BP 70 Set of Condensers (1T) 250 days Tue 20.11.07 Mon 03.11.08
83 3.2.10.1 Issue of TS to supplier 10 days Tue 20.11.07 Mon 03.12.07
84 3.2.10.2 Offer from supplier 32 days Tue 04.12.07 Wed 16.01.08
85 3.2.10.3 Signing of contract 10 days Thu 17.01.08 Wed 30.01.08
86 3.2.10.4 Production and dispatch 154 days Thu 31.01.08 Tue 02.09.08
87 3.2.10.5 Delivery at site 44 days Wed 03.09.08 Mon 03.11.08
88 3.2.11 BP 80 Set of Vessels (Filters, Collectors, 278 days Tue 20.11.07 Thu 11.12.08
Separators etc.) (15T)
89 3.2.11.1 Design 40 days Tue 20.11.07 Mon 14.01.08
90 3.2.11.2 Technological preproduction planning 40 days Tue 15.01.08 Mon 10.03.08
91 3.2.11.3 Production and dispatch 154 days Tue 11.03.08 Fri 10.10.08

Task Milestone Rolled Up Critical Task Split Group By Summary


Project: BSP PERT
Critical Task Summary Rolled Up Milestone External Tasks Deadline
Date: Mon 31.12.07
Progress Rolled Up Task Rolled Up Progress Project Summary

Page 2
ID Название задачи Duration Start Finish 7 Qtr 3, 2007 Qtr 4, 2007 Qtr 1, 2008 Qtr 2, 2008 Qtr 3, 2008 Qtr 4, 2008 Qtr 1, 2009 Qtr 2, 2009 Qtr 3, 2009
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
92 3.2.11.4 Delivery at site 44 days Mon 13.10.08 Thu 11.12.08
93 3.2.12 BP 90 Set of assemblies of cold box (53T) 256 days Tue 20.11.07 Tue 11.11.08
94 3.2.12.1 Design 40 days Tue 20.11.07 Mon 14.01.08
95 3.2.12.2 Technological preproduction 40 days Tue 15.01.08 Mon 10.03.08
96 3.2.12.3 Production and dispatch 132 days Tue 11.03.08 Wed 10.09.08
97 3.2.12.4 Delivery at site 44 days Thu 11.09.08 Tue 11.11.08
98 3.2.13 BP 100 Set of Warm Valves (25T) 226 days? Tue 20.11.07 Tue 30.09.08
99 3.2.13.1 Issue of TS to supplier 5 days? Tue 20.11.07 Mon 26.11.07
100 3.2.13.2 Offer from supplier 15 days? Tue 27.11.07 Mon 17.12.07
101 3.2.13.3 Signing of contract 14 days Tue 01.01.08 Fri 18.01.08
102 3.2.13.4 Production and dispatch 132 days Tue 29.01.08 Thu 31.07.08
103 3.2.13.5 Delivery at site 44 days Thu 31.07.08 Tue 30.09.08
104 3.2.14 BP 110 Set of Cold Valves (10T) 230 days? Tue 20.11.07 Mon 06.10.08
105 3.2.14.1 Design 15 days? Tue 20.11.07 Mon 10.12.07
106 3.2.14.3 Technological preproduction 14 days Tue 01.01.08 Fri 18.01.08
107 3.2.14.4 Production and dispatch 132 days Mon 04.02.08 Tue 05.08.08
108 3.2.14.5 Delivery at site 44 days Wed 06.08.08 Mon 06.10.08
109 3.2.15 BP 120 Cryogenic Pumps (6T) 275 days? Tue 20.11.07 Mon 08.12.08
110 3.2.15.1 Issue of TS to supplier 5 days? Tue 20.11.07 Mon 26.11.07
111 3.2.15.2 Offer from supplier 17 days? Tue 27.11.07 Wed 19.12.07
112 3.2.15.3 Signing of contract 25 days Tue 01.01.08 Mon 04.02.08
113 3.2.15.4 Production and dispatch 176 days Tue 05.02.08 Tue 07.10.08
114 3.2.15.5 Delivery at site 44 days Wed 08.10.08 Mon 08.12.08
115 3.2.16 BP 130 Set of housings, supports (64T) 236 days Tue 01.01.08 Tue 25.11.08
116 3.2.16.1 Design 30 days Tue 01.01.08 Mon 11.02.08
117 3.2.16.2 Technological preproduction planning 30 days Tue 12.02.08 Mon 24.03.08
118 3.2.16.3 Production and dispatch 132 days Tue 25.03.08 Wed 24.09.08
119 3.2.16.4 Delivery at site 44 days Thu 25.09.08 Tue 25.11.08
120 3.2.17 BP 140 Turbo Expander - Compressor (4T) 312 days Mon 31.12.07 Tue 10.03.09
121 3.2.17.1 Design 44 days Mon 31.12.07 Thu 28.02.08
122 3.2.17.2 Technological preproduction planning 44 days Mon 03.03.08 Thu 01.05.08
123 3.2.17.3 Production and dispatch 176 days Wed 07.05.08 Wed 07.01.09
124 3.2.17.4 Delivery at site 44 days Thu 08.01.09 Tue 10.03.09
125 3.2.18 BP 141 Receiver (1T) 239 days? Tue 01.01.08 Fri 28.11.08
126 3.2.18.1 Design 5 days? Tue 01.01.08 Mon 07.01.08
127 3.2.18.2 Technological preproduction planning 23 days? Tue 08.01.08 Thu 07.02.08
128 3.2.18.3 Production and dispatch 110 days Tue 29.04.08 Tue 30.09.08
129 3.2.18.4 Delivery at site 44 days Tue 30.09.08 Fri 28.11.08
130 3.2.19 BP 142 Set of coolers (6T) 269 days? Tue 20.11.07 Fri 28.11.08
131 3.2.19.1 Issue of TS to supplier 5 days? Tue 20.11.07 Mon 26.11.07
132 3.2.19.2 Offer from supplier 10 days Tue 27.11.07 Mon 10.12.07
133 3.2.19.3 Signing of contract 11 days? Tue 01.01.08 Tue 15.01.08
134 3.2.19.4 Production and dispatch 172 days Fri 01.02.08 Tue 30.09.08
135 3.2.19.5 Delivery at site 43 days Wed 01.10.08 Fri 28.11.08
136 3.2.20 BP 150 Pure Argon Column (3T) 286 days Tue 20.11.07 Tue 23.12.08
137 3.2.20.4 Design 44 days Tue 20.11.07 Fri 18.01.08
138 3.2.20.5 Technological preproduction planning 44 days Mon 21.01.08 Thu 20.03.08
139 3.2.20.6 Production and dispatch 154 days Fri 21.03.08 Wed 22.10.08

Task Milestone Rolled Up Critical Task Split Group By Summary


Project: BSP PERT
Critical Task Summary Rolled Up Milestone External Tasks Deadline
Date: Mon 31.12.07
Progress Rolled Up Task Rolled Up Progress Project Summary

Page 3
ID Название задачи Duration Start Finish 7 Qtr 3, 2007 Qtr 4, 2007 Qtr 1, 2008 Qtr 2, 2008 Qtr 3, 2008 Qtr 4, 2008 Qtr 1, 2009 Qtr 2, 2009 Qtr 3, 2009
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
140 3.2.20.7 Delivery at site 44 days Thu 23.10.08 Tue 23.12.08
141 3.2.21 BP 160, 161 Set of instruments and equipment 330 days Tue 20.11.07 Mon 23.02.09
for C&I system (5T)
142 3.2.21.1 Issue of preliminary TS to supplier 44 days Tue 20.11.07 Fri 18.01.08
143 3.2.21.2 Issue of finalised TS to supplier 44 days Mon 21.01.08 Thu 20.03.08
144 3.2.21.3 Offer from supplier 22 days Fri 21.03.08 Mon 21.04.08
145 3.2.21.4 Signing of contract 22 days Tue 22.04.08 Wed 21.05.08
146 3.2.21.5 Issue of initial data to PROJECTS DESIGN 22 days Thu 22.05.08 Fri 20.06.08

147 3.2.21.6 Production and dispatch 132 days Mon 23.06.08 Tue 23.12.08
148 3.2.21.7 Delivery at site 44 days Wed 24.12.08 Mon 23.02.09
149 3.2.22 BP 170 Technical Argon Column (4T) 264 days Mon 31.12.07 Thu 01.01.09
150 3.2.22.1 Design 44 days Mon 31.12.07 Thu 28.02.08
151 3.2.22.2 Technological preproduction planning 44 days Fri 29.02.08 Wed 30.04.08
152 3.2.22.3 Production and dispatch 132 days Thu 01.05.08 Fri 31.10.08
153 3.2.22.4 Delivery at site 44 days Mon 03.11.08 Thu 01.01.09
154 3.2.23 BP 171 Set of Technical Argon Column 208 days? Tue 20.11.07 Thu 04.09.08
Internals (6T)
155 3.2.23.1 Issue of TS to supplier 5 days? Tue 20.11.07 Mon 26.11.07
156 3.2.23.2 Offer from supplier 16 days Tue 27.11.07 Tue 18.12.07
157 3.2.23.3 Signing of contract 15 days Tue 01.01.08 Mon 21.01.08
158 3.2.23.4 Production and dispatch 119 days Tue 22.01.08 Fri 04.07.08
159 3.2.23.5 Delivery at site 44 days Mon 07.07.08 Thu 04.09.08
160 3.2.24 BP 180 Equipment for discharge and warming 264 days Mon 17.12.07 Thu 18.12.08
(15T)
161 3.2.24.1 Design 44 days Mon 17.12.07 Thu 14.02.08
162 3.2.24.2 Technological preproduction planning 44 days Fri 15.02.08 Wed 16.04.08
163 3.2.24.3 Production and dispatch 132 days Thu 17.04.08 Fri 17.10.08
164 3.2.24.4 Delivery at site 44 days Mon 20.10.08 Thu 18.12.08
165 3.2.25 BP 190 Set of scrubbers (25T) 306 days? Tue 20.11.07 Tue 20.01.09
166 3.2.25.1 Design 76 days? Tue 20.11.07 Tue 04.03.08
167 3.2.25.2 Technological preproduction planning 32 days? Wed 05.03.08 Thu 17.04.08
168 3.2.25.3 Production and dispatch 154 days Fri 18.04.08 Wed 19.11.08
169 3.2.25.4 Delivery at site 44 days Thu 20.11.08 Tue 20.01.09
170 3.2.26 BP 191 Set of scrubber internals (51T) 308 days? Tue 20.11.07 Thu 22.01.09
171 3.2.26.1 Issue of TS to supplier 5 days? Tue 20.11.07 Mon 26.11.07
172 3.2.26.2 Offer from supplier 16 days Tue 27.11.07 Tue 18.12.07
173 3.2.26.3 Signing of contract 14 days? Tue 01.01.08 Fri 18.01.08
174 3.2.26.4 Production and dispatch 220 days Mon 21.01.08 Fri 21.11.08
175 3.2.26.5 Delivery at site 44 days Mon 24.11.08 Thu 22.01.09
176 3.2.27 BP 192 Set of water Pumps (3T) 309 days? Tue 20.11.07 Fri 23.01.09
177 3.2.27.1 Issue of TS to supplier 5 days? Tue 20.11.07 Mon 26.11.07
178 3.2.27.2 Offer from supplier 16 days Tue 27.11.07 Tue 18.12.07
179 3.2.27.3 Signing of contract 15 days Tue 01.01.08 Mon 21.01.08
180 3.2.27.4 Production and dispatch 220 days Tue 22.01.08 Mon 24.11.08
181 3.2.27.5 Delivery at site 44 days Tue 25.11.08 Fri 23.01.09
182 3.2.28 BP 220-228 Intrashop equipment (24T) 208 days Mon 07.04.08 Wed 21.01.09
183 3.2.28.1 Issue of TS to suppliers 22 days Mon 07.04.08 Tue 06.05.08
184 3.2.28.2 Offers from suppliers 22 days Wed 07.05.08 Thu 05.06.08

Task Milestone Rolled Up Critical Task Split Group By Summary


Project: BSP PERT
Critical Task Summary Rolled Up Milestone External Tasks Deadline
Date: Mon 31.12.07
Progress Rolled Up Task Rolled Up Progress Project Summary

Page 4
ID Название задачи Duration Start Finish 7 Qtr 3, 2007 Qtr 4, 2007 Qtr 1, 2008 Qtr 2, 2008 Qtr 3, 2008 Qtr 4, 2008 Qtr 1, 2009 Qtr 2, 2009 Qtr 3, 2009
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
185 3.2.28.3 Signing of contracts 10 days Fri 06.06.08 Thu 19.06.08
186 3.2.28.4 Production and dispatch 110 days Fri 20.06.08 Thu 20.11.08
187 3.2.28.5 Delivery at site 44 days Fri 21.11.08 Wed 21.01.09
188 3.2.29 BP 230, 231 Perlite and Insulation (280T) 185 days Mon 17.03.08 Fri 28.11.08
189 3.2.29.1 Issue of TS to Supplier 10 days Mon 17.03.08 Mon 31.03.08
190 3.2.29.2 Signing of contract 10 days Mon 31.03.08 Fri 11.04.08
191 3.2.29.4 Production & Dispatch 60 days Mon 21.07.08 Fri 10.10.08
192 3.2.29.3 Delivery at site 35 days Mon 13.10.08 Fri 28.11.08
193 3.2.30 BP 241, 251, 261 Main Air Compressor (MAC), 351 days? Tue 20.11.07 Tue 24.03.09
Motor of MAC, Soft Starter of MAC (100T)
194 3.2.30.1 Issue of TS to supplier 5 days? Tue 20.11.07 Mon 26.11.07
195 3.2.30.2 Offer from supplier 15 days? Tue 27.11.07 Mon 17.12.07
196 3.2.30.3 Signing of contract 5 days Tue 01.01.08 Mon 07.01.08
197 3.2.30.4 Production and dispatch 286 days Tue 08.01.08 Tue 10.02.09
198 3.2.30.5 Delivery at site 30 days Wed 11.02.09 Tue 24.03.09
199 3.2.31 BP 242, 252, 262 Booster Air Compressor 361 days? Tue 20.11.07 Tue 07.04.09
(BAC), Motor of BAC, Soft Starter of BAC (75T)
200 3.2.31.1 Issue of TS to supplier 5 days? Tue 20.11.07 Mon 26.11.07
201 3.2.31.2 Offer from supplier 15 days? Tue 27.11.07 Mon 17.12.07
202 3.2.31.3 Signing of contract 15 days Tue 01.01.08 Mon 21.01.08
203 3.2.31.4 Production and dispatch 286 days Tue 22.01.08 Tue 24.02.09
204 3.2.31.5 Delivery at site 30 days Wed 25.02.09 Tue 07.04.09
205 3.2.32 BP 243, 244, 253, 254, 263, 264 Nitrogen Air 361 days? Tue 20.11.07 Tue 07.04.09
Compressors (NAC), Motors of NAC, Soft Starters of
NAC (60T)
206 3.2.32.1 Issue of TS to supplier 5 days? Tue 20.11.07 Mon 26.11.07
207 3.2.32.2 Offer from supplier 15 days? Tue 27.11.07 Mon 17.12.07
208 3.2.32.3 Signing of contract 15 days Tue 01.01.08 Mon 21.01.08
209 3.2.32.4 Production and dispatch 286 days Tue 22.01.08 Tue 24.02.09
210 3.2.32.5 Delivery at site 30 days Wed 25.02.09 Tue 07.04.09
211 3.2.33 BP 270, 245, 290 Air compressor filters, 332 days? Tue 20.11.07 Wed 25.02.09
Instrumentation compressor, Diesel generator (9T)

212 3.2.33.1 Issue of TS to supplier 12 days? Tue 20.11.07 Wed 05.12.07


213 3.2.33.2 Offer from supplier 22 days Thu 06.12.07 Fri 04.01.08
214 3.2.33.3 Signing of contract 20 days? Thu 07.02.08 Wed 05.03.08
215 3.2.33.4 Production and dispatch 220 days Thu 06.03.08 Wed 07.01.09
216 3.2.33.5 Delivery at site 35 days Thu 08.01.09 Wed 25.02.09
217 3.2.34 BP 280, 281, 282, 283 LIN Storage Tank, LAR 312 days? Tue 20.11.07 Wed 28.01.09
Storage Tank, Atmospheric vaporisers, Storage
system cryogenic pumps (138T)
218 3.2.34.1 Issue of TS to supplier 5 days? Tue 20.11.07 Mon 26.11.07
219 3.2.34.2 Offer from supplier 30 days? Tue 27.11.07 Mon 07.01.08
220 3.2.34.3 Signing of contract 22 days? Tue 08.01.08 Wed 06.02.08
221 3.2.34.4 Production and dispatch 220 days Thu 07.02.08 Wed 10.12.08
222 3.2.34.5 Delivery at site 35 days Thu 11.12.08 Wed 28.01.09
223 3.2.35 BP 301 - 330 Plant Electricals (75T) 205 days? Mon 07.04.08 Fri 16.01.09
224 3.2.35.1 Issue of TS to supplier 5 days? Mon 07.04.08 Fri 11.04.08
225 3.2.35.2 Offer from supplier 30 days? Mon 26.05.08 Fri 04.07.08
226 3.2.35.3 Signing of contract 10 days Mon 07.07.08 Fri 18.07.08

Task Milestone Rolled Up Critical Task Split Group By Summary


Project: BSP PERT
Critical Task Summary Rolled Up Milestone External Tasks Deadline
Date: Mon 31.12.07
Progress Rolled Up Task Rolled Up Progress Project Summary

Page 5
ID Название задачи Duration Start Finish 7 Qtr 3, 2007 Qtr 4, 2007 Qtr 1, 2008 Qtr 2, 2008 Qtr 3, 2008 Qtr 4, 2008 Qtr 1, 2009 Qtr 2, 2009 Qtr 3, 2009
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
227 3.2.35.4 Production and dispatch 90 days Mon 21.07.08 Fri 21.11.08
228 3.2.35.5 Delivery at site 35 days Mon 01.12.08 Fri 16.01.09
229 BSP provides area for storage yard 0 days Tue 01.01.08 Tue 01.01.08 01.01
230 BSP provides electric power for construction and erection 0 days Tue 01.01.08 Tue 01.01.08 01.01
231 BSP provides drinking water for construction and erection 0 days Tue 01.01.08 Tue 01.01.08 01.01
232 4. Civil Works 154 days Fri 29.02.08 Wed 01.10.08
233 4.1.Earth Works 110 days Fri 29.02.08 Thu 31.07.08
234 4.2. Foundations 110 days Thu 01.05.08 Wed 01.10.08
235 5. Main Building Extension 88 days Wed 30.04.08 Fri 29.08.08
236 8. Erection of main equipment 151 days Wed 01.10.08 Thu 30.04.09
237 8.1. Erection of Cold Box 84 days Fri 02.01.09 Wed 29.04.09
238 8.2. Erection of Prepurification Unit 85 days Mon 15.12.08 Fri 10.04.09
239 8.3. Erection of Turbo Expander 15 days Wed 11.03.09 Tue 31.03.09
240 8.4. Erection of Scrubbers 30 days Fri 23.01.09 Thu 05.03.09
241 8.5. Erection of Storage System 30 days Mon 02.02.09 Fri 13.03.09
242 8.6. Erection of Main Air Compressor 22 days Wed 25.03.09 Thu 23.04.09
243 8.7 Erection of Booster air compressor 17 days Wed 08.04.09 Thu 30.04.09
244 8.8 Erection of Nitrogen compressors 15 days Wed 08.04.09 Tue 28.04.09
245 8.9 Erection of Heat Exchanges 15 days Mon 26.01.09 Fri 13.02.09
246 8.10 Erection of Cryogenic Pumps 15 days Tue 09.12.08 Mon 29.12.08
247 8.11 Erection of coolers 15 days Mon 01.12.08 Fri 19.12.08
248 8.12 Erection of water pumps 15 days Mon 26.01.09 Fri 13.02.09
249 8.13 Erection of C&I equipment 30 days Tue 24.02.09 Mon 06.04.09
250 8.14. Erection of Intrashop equipment, piping, electricals 30 days Thu 26.02.09 Wed 08.04.09
251 8.15 Providing of industrial water 0 days Wed 01.10.08 Wed 01.10.08 01.10
252 8.16 Providing HT electric power 0 days Fri 30.01.09 Fri 30.01.09 30.01
253 9. Commissioning and start-up 77 days Mon 13.04.09 Tue 28.07.09
254 9.1. Water flushing 10 days Mon 13.04.09 Fri 24.04.09
255 9.2. Strength test of PPU 10 days Mon 13.04.09 Fri 24.04.09
256 9.3. Running-in of Air Compressor 10 days Fri 24.04.09 Thu 07.05.09
257 9.4. Strength test of Storage system 10 days Mon 13.04.09 Fri 24.04.09
258 9.5. First warm pressurisation 10 days Fri 08.05.09 Thu 21.05.09
259 9.6. Strength of Cold Box 10 days Thu 30.04.09 Wed 13.05.09
260 9.7. Starting of Nitrogen Water Coolers 5 days Mon 18.05.09 Fri 22.05.09
261 9.8. Preliminary regeneration of PPU. 10 days Fri 22.05.09 Thu 04.06.09
262 9.9. Running-in of Booster Air Compressor 10 days Fri 08.05.09 Thu 21.05.09
263 9.10. Strength test of piping 10 days Mon 13.04.09 Fri 24.04.09
264 9.11. Starting of Turbo expander. 9 days Mon 13.04.09 Thu 23.04.09
265 9.12. First cold pressurisation along with storage system 5 days Mon 25.05.09 Fri 29.05.09
266 9.13. Second warm pressurisation of Cold Box along with storage system.5 days Mon 01.06.09 Fri 05.06.09
267 9.14. Second cold pressurisation 6 days Mon 08.06.09 Mon 15.06.09
268 9.16. Third warm pressurisation. Preparation of cold box for isolation 5 days Tue 16.06.09 Mon 22.06.09
269 9.17. Insulation of Cold box. 10 days Tue 23.06.09 Mon 06.07.09
270 9.18. Primary regeneration of PPU 6 days Tue 07.07.09 Tue 14.07.09
271 9.20. Start-up, Commissioning and Stabilization 10 days Wed 15.07.09 Tue 28.07.09
272 10. Products supply to the customer 0 days Thu 30.07.09 Thu 30.07.09 30.07

Task Milestone Rolled Up Critical Task Split Group By Summary


Project: BSP PERT
Critical Task Summary Rolled Up Milestone External Tasks Deadline
Date: Mon 31.12.07