Documente Academic
Documente Profesional
Documente Cultură
L F G H I J KEY TO INSTRUMENTATION
THTR
High End SolaSpot 1000 12
1000
Elation Artiste Picasso 16
0 0
CHAUVET R2 WASH 21
BLACK FLAT BORDER
T
ETC S4-50° LED Tungsten 5
T
6 5 4 3 2 1 GROUND ROW
311 312 313 314 315 316 EXACT PLACEMENT TBD ONSITE
BLACK FLAT LEG BLACK FLAT LEG
ETC S4-19°LED Lustr 9
L
BLACK FLAT BORDER
L
1 1
ETC S4-36° LED Lustr 26
L
ETC S4-50 LED Lustr 6
L
ETC S4 Fresnel Lustr 8
BLACK FLAT LEG BLACK FLAT LEG
Stormy Strobe 2
GENERAL NOTES
- Please have ample R119, R132, and blackwrap
3 3 available at focus call.
583 4 HEADER CHRISTMAS UNION HALL BILLY 4 587 - Instruments hung on 18" centers unless otherwise
noted herein.
HANGING LIGHTS LIGHTS KABUKI LAMP
961 962
BLACK FLAT LEG BLACK FLAT LEG
4 LX = Electric
TD = Tech. Direct.
UNIT #
5
LD = Lighting Dsgnr
671 CHANNEL #
SNOW ROLLER
LINE SET #7
582 3 3 586
PL PL
BLACK FLAT LEG BLACK FLAT LEG
5 5
http://www.mikewoodld.com
DS MLs & STROBES DS MLs & STROBES mike@mikewoodld.com
813-716-1909 Cell / 646-694-8656 Studio
PLACEMENT TBD PLACEMENT TBD
CL
3161 Broadway #2C - New York, NY 10027
This drawing contains a visual concept and construction suggestions.
BEHIND SUBS BEHIND SUBS The lighting designer and design assistants/associates are not qualified
to determine or guarantee the structural integrity or appropriateness of
any construction or rigging methods, and assume no liability or
responsibility for the improper engineering, construction, or use of any
and all designs contained on this document and elsewhere throughout
the production. Always consult a licensed structural engineer before any
rigging or construction takes place. All applicable local and national fire
and life safety codes must be follwed at all times.
581 1 631 2 2 632 1 585
MR16 BIRDIES
MOUNT TO DECK REVISION HISTORY
PER TD NO. REVISION DATE BY
A01 Document Prep 02 APR 19 JLC
R02 R02 R02 R02 R02 R02 R02 R02 R02 R02 R02 R02
A02 ROUGHS 18 APR 19 MW
12 11 10 9 8 7 6 5 4 3 2 1 B01 SHOP PREP 19 APR 19 MW
601 601 601 601 602 602 602 602 603 603 603 603 B02 SHOP PREP v2 21 APR 19 MW
FOOTLIGHTS B03 SET ELECTRICS 23 APR 19 JLC
FOOTLIGHTS >C01< LOAD IN PRINT 28 APR 19 JLC
HS LADDER - R HS LADDER - L
6 6
BILLY ELLIOT
PRODUCTION STAFF
FOOTLIGHTS FOOTLIGHTS DIRECTOR . . . . . . . . . . . . . . . . . . BRANDT BLOCKER
LIGHTING DESIGNER . . . . . . . . . . . . . . .MIKE WOOD
ASSOC LIGHTING DSGNRS . . . .DALTON HAMILTON
JESS CREAGER
DWG NUMBER
801 802 SCALE 1/4" = 1'0"
3/8"
4
UNLESS OTHERWISE NOTED
PG SIZE ARCH D
OF 5
LIGHT PLOT
A B C D E F G H I J DECK & PRACTICALS