Sunteți pe pagina 1din 2

THIS REPORT MUST BE COMPLETED BY HAND WHILE AT THE VENDOR AND FAXED/

EMAILED FROM THE VENDOR TO APPLUS+ BEFORE YOU DEPART FOR THE DAY.
Client: M/S Hyundai E&C ·
Vendor: M/S Towell Engineering Group

Project Sub-Vendor: -

PO No.: - Location:

Client Reference: Mr. Sangwon Lee Assign. No.: - Report No.:

Client Contact: - SO No.: - Date of Visit: 29.02.2020

Work Order No.: - Vendor Ref.: - Next Visit Date: 01.03.2020

MATERIAL INSPECTED THIS VISIT

PO Item Quantity Description Tag No., Batch No.,


Serial No., Cast, Heat
No. No.
As per Surveillance inspection of Fit-Up, Adhesive application, fit
-
drawing layer and structural application & curing activity of
following production joint at Field and shop
Site Activates:
Unit 85: WF line Fit-up and lamination ongoing for GRE.
Unit 98: WF line Fit-up and lamination ongoing For GRE.
Surveillance inspection of Fit-Up, Adhesive application, fit
layer and structural application & curing activity of
following production joint at Field and shop
Site Activates:
Unit 93: WF line Fit-up and lamination ongoing for GRE.

02 Test Air blowing and walk down done in line for hydro package
pack for following test pack in area 93 Offshore
Test pack no: TP-93-11-U121-105-WF-011 Hydro package
Test pack no: TP-93-11-U121-105-WF-010 Hydro package
Status: Done

02 Test Bolt torqueing done for following test pack prior to Hydro
pack test inspection in area -93 Offshore
Test pack no: TP-93-11-U121-105-WF-011 Hydro package
Test pack no: TP-93-11-U121-105-WF-010 Hydro package
Status: Done

02 Test Hydro test- leak tight test and strength test for following
Pack test pack ongoing in area -98
Test pack no: TP-90-98-01-U122-105-15 Hydro package
Test pack no: TP-90-98-01-U122-105-17 Hydro package
Status: Ongoing

L5-FMT-060 Rev. 03
RESULTS OF Accepted Not Compliant ORDER STATUS: Complete Incomplete
INSPECTION:

SUMMARY / AREAS OF CONCERN:


Fit-up, Adhesive application, Fit layer and Structural layer & Curing of production joint.
Fit-up inspection
Air blowing
Walk down
Hydro test

AREAS OF CONCERN
-In area 85 Supports are not seated properly on pipe rack/ structure due to clamp support located too near to the
joint. Line no- OP and TP line.

TYPE OF VISIT:
Pre-Inspection Meeting Witness Mechanical Tests Witness Pressure Tests
Review all Certificates Dimension & Workmanship
Intermediate Inspection Witness NDT Coating & Painting
Review Radiographs Packing & Marking
Final Inspection Witness Performance Tests Loading
Inspector: Signed:
Page 2 of 2

Velosi Form (12) 03.09.97 V:\forms.msw\Inspect.continuation.dot