Sunteți pe pagina 1din 1

Roll No- SET-B

Environmental Engineering-II
TE (Civil)
Test -I
Date-10/2/2014 Max. Marks – 30
Time – 9 am to 10.00 am Min. marks -12
Instructions: - 1) All questions are compulsory in Q no. 1.
2) Solve any two questions from Q no.2 to Q no 4
3) Assume suitable data whenever required.
4) Figure to the right indicates full marks.

Q1. Rewrite the statement by filling in the blank with correct option. (5 marks)
1. Pick out the odd one - _________.
a) Screen chamber b) Grit chamber
c) PST d) Septic tank
4. For contributory population of 20000, peak factor is _______.
a) 3.5 b) 2.5
c) 2 d) 2.25
7. Treatment unit used to remove oil and grease is _____________
a) Grit chamber b) Skimming tank
c) Septic tank d) None of these
10. In BOD test, ____________________ is used as titrant
a) Potassium dichromate b) Sulphuric acid
c) Mercuric sulphate d) Sodium Thiosulphate
13. _________ is type of screen chamber
a) Fine screen b) Wide screen
c) Tiny screen d) All of above
Q 2] a) Compare between conservancy system and water carriage system. (7)
b) A stone ware sewer, 30 cm in diameter is laid at a gradient of 1:100. (6)
Using N=0.013. Calculate velocity, discharge and Chezy’s coefficient
when sewer is running full.
Q 3] a) During a BOD test 2 ml waste sample is diluted in BOD bottle. Following (5)
readings are taken:
Initial DO=7.8
Final DO= 4.5
Find i. Standard BOD and ii. Ultimate BOD if k=0.23 /day
c) Discuss steps in design of PSTs. (7)
Q4] Write short notes (Any two) (12)
1. Pumping station.
2. Types of screen chamber
3. BOD test

S-ar putea să vă placă și