TECHNICAL REQUIREMENTS
Model No: PRS 1400 FP2-2-INDOOR
1.0 SCOPE
This document contains the generic requirements of High Power Plants, based on high Complied Power
Frequency Switch Mode Techniques, using switching frequency switch mode Plant compatible with
frequencies of technique, using switching VRLA batteries
20KHz and above, for the use in Indian Telecom Network. The frequencies of>20khz. Only.
Power Plant as per this GR shall be compatible with either VRLA
or both VRLA as well as Conventional Lead Acid batteries. The The power plant compatible
power plant compatible with VRLA batteries only shall be certified with VRLA batteries only
as "SMPS power plants compatible with VRLA battery only". The
Tendering Authority will indicate the type of power plant required
in the Tender.
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
1.1.1 The DC Distribution cabinet does not form part of this GR. Noted -
1.1.2 The system shall be capable of meeting the load requirements of various The system is capable of Complied
telecom equipment and battery bank in Telecom Network. The system meeting the load
should be expandable at rack level itself or by additional racks using the requirements of various
basic FR/FC and/ or FR/BC modules of the same rating. The prescribed telecom equipment and
FR/FC and FR/BC ratings are 25A, 50A, 100A and 200A. These power battery bank in Telecom
plants may be mainly classified in two categories: Network.
FR/FC rating is 25A(upto
150A ultimate capacity)
1.1.2.1 Large capacity Power plants systems: N/ A
These types of power plants are envisage for large or very large telecom
systems. Power plant systems with ultimate capacity of
600A/1000A/1500A and above are envisaged for this application.
Battery back-up for these systems shall be as per Annexure – I letter No.
7-1/2013-NWO-CFA/MSE (Ch.II) Dated: 14.03.2014
Issued by BSNL C.O, New Delhi – 110 001. SMPS power plants based
on 100A basic modules are envisaged for 600A/1000A/1500A and
100A/200A basic modules for above 1500A for these application. All
these power plants use three phase supply.
1.1.3 The power plant system shall consist of a Distribution, Switching, The power plant system Complied
Control, Alarm and Monitoring arrangement (DSCA) and Float consist of a distribution,
Rectifier-cum-Float switching, control, alarm
and monitoring arrangement
(DSCA) and Float Rectifier-
Chargers (FR/FCs) and Float Rectifier-cum-Battery Chargers (FR/BCs) Cum-Float charger
in a rack. It shall employ modular configuration for flexible provision of (FR/FCs) in a rack .it is
DC power. employing modular
configuration for flexible
provision of DC power.
Note: FR/BC is only used for conventional flooded Lead Acid
batteries only. Power plants compatible with VRLA batteries only,
do not require FR/BC modules and as such only FR/FC are used in
such power plants.
1.1.4 The system shall be sufficiently flexible to serve any load from 6.25A The System is sufficiently Complied
onwards, depending on manufacturer's design, rating, number of FR/FC flexible to serve up to full
modules used in a rack and system configuration. load of Power Plant System
(150 Amps) with 6(Six)
FR/FC modules of 25A
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
rating each.
1.1.5 To cater to higher load requirements, same type of FR/FCs mounted in The FR/FCs mounted in same
the same rack or different racks shall be capable of working in rack is capable of working in
parallel load sharing arrangement. parallel load sharing Complied
arrangement to cater for
higher load requirements.
1.2 Functional and Technical Requirements
1.2.1.3 Response time of the Stage II device shall be ≤ 25 nano seconds. Response time of Stage–2 Complied
Protection device is 25 nano
seconds for Line to Neutral
and 100 nano seconds for N
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
to PE.
1.2.2.1.1 Switching frequencies of these power plants shall be 20 KHz and above. Switching frequency of
power plants is above 20KHz
Complied
1.2.2.1.2 The system shall only be based on menu driven The system is based on menu
Microprocessor Controlled Techniques (both DSCA as well as driven micro processer (for
FR/FC, FR/BC module) for control, monitoring & alarms. DSCA shall both DSCA & ER/FC) for
display the Software version and checksum number for DSCA and controlling, monitoring&
FR/FC, FR/BC. Setting of all the parameters shall be through menu- alarms. DSCA displays the Complied
driven microprocessor control only. The failure of Microprocessor or software version and
DSCA shall not affect the setting of individual FR/FC, FR/BC. No checksum number of DSCA
parameter of FR/FC, FR/BC modules shall be disturbed on the failure of and FR/FC. Setting of all the
DSCA. In this condition all the FR/FC FR/BC modules shall take care of
parameter are through menu
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
the load on default settings and share the load collectively. Only the driven micro processor or
setting of new parameters from DSCA shall be affected. In case of DSCA does not affect any
failure of microprocessor of FR/FC, FR/BC module its last settings shall setting of individual FR/FC.
not be affected.
System is compatible with
Ethernet / RS485 for control
The system shall be RS485 / RS232/ Ethernet compatible, if remote and monitoring of power
monitoring is required. It shall be feasible to set any monitoring control plant data. All the
parameter from a remote site through RS 485. All the information information (only user level)
regarding Control and monitoring of Power Plant data shall be accessible is accessible on demand from
on demand from the remote site. The exchange of information and remote site. The exchange of
protocol format shall be as given in the Annexure -1. information & protocol
format is complied as per
Annexure -1 of BSNL
Specification.
1.2.2.2 The DSCA shall be provided for the ultimate capacity of the Power Offered system having :-
Plant. However, it shall preferably be provided either in the first rack or in a) Termination for
a separate rack. The DSCA, in addition to control, monitoring and alarms, Batteries – 3 Nos. is
shall provide for the following: provided through HRC Fuse Complied
Links (3*125A HRC Fuse)
The Common +Ve Bus Bar
a) Termination for the batteries*. IS provided for Battery and
Load.
b) Termination for the exchange load. b) DC distribution for Load
Path is done as follows :
c) Interconnecting arrangement for power equipment.
Load MCB : MCB Single
d) Battery Switching arrangement (Connection to / isolation from Pole(63A *1Nos +
system)** 32A*2Nos+16A*2Nos)
The Load +Ve is terminated
e) Termination for AC input to the rack shall be finger touch proof, on Common +Ve Busbar.
flame retardant, insulated. Use of bus-bars for the purpose is precluded. c) The interconnection
However, for terminating cables of large cross sectional area, especially in arrangement between
high ultimate capacity power plants, copper bars may be provided as Rectifiers (FR/FC
terminal blocks to handle such high currents.
Modules) and Common
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
f) Termination for AC and DC to FR/FC modules. g) Circuit Breakers/ Internal Bus bars is
fuses etc. through Hot Plug – in
arrangement provided in
the Back Plane \
* The capacity and number of batteries shall be as per order. For Assembly of the Rectifier
the purpose of Shelf.
d) Battery Switching
Type Approval, it shall be taken as three batteries. arrangement
(Connection to / isolation
from system) is
** Only CACT approved DC contactor or `MCBs’ (which do not automatically done by
produce spark while cutting in or out) for manual isolation and means of LVD
reconnection of the battery. The manual isolation/reconnection of the Contactors (Single Pole
battery by tripping the contactor through an external switch is not DC Contactor) provided
permitted. in each Battery path for
battery low voltage
disconnection /
Note-1: For AC input supply, AC contactor with AC Coil shall reconnection automatically
preferably be used. AC Contactor with DC coil (if used) shall have its and manual isolation of
own power supply and shall not be fed from Exchange battery. Battery is through Soft
Switch by means of
Menu Driven SPS.
External Switch is not used
Note-2: Battery shall be protected against the short circuit
for the purpose..
from any source, including switching equipment such as contactor, MCB
coil and their control and sensing circuitry. e) Termination of AC input
R,Y & B, Neutral & Earth
to the rack is through
terminated on
Note-3: Solid state switching device may preferably be used. g) Circuit Breaker is provided
Relays, if used, shall be UL or CE compliant. at the input in each
Rectifier (FR/FC Module).
Battery isolation /
reconnection have been
provided using dc
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
1.2.2.2.1 Interlocking of batteries: Necessary interlocking arrangement for Interlocking arrangement for
batteries shall be provided so as to ensure that at-least one battery remains batteries provided through Complied
floated across the load under all working conditions. electronic sensing
arrangement so as to ensure
that at-least one battery
remains floated across the
load under all working
condition.
1.2.2.3 Power Plant compatibility with Engine alternator: The power plant The power plant system Complied
system (including FR/FCs, FR/BCs and DSCA), shall be suitable for (including FR/FCs,and
operation from A.C mains or a DG set (of capacity 1.25 times AC load of DCSA), is suitable for
power plant). operation from AC mains or
a DG set
1.2.2.4 Load Sharing (Parallel operation): FR/FC modules shall be suitable Checked ok, FR/FC modules is
for operating in parallel with one or more modules of similar type, make suitable for operating in parallel Complied,
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
and rating, other output conditions remaining within specified limits. with one or more modules of
similar type, make and rating,
other output conditions
remaining within specified
limits.
1.2.2.4.1 The current sharing shall be within +/- 10% of the average current per The current sharing is within
rectifier module in the system (mounted in the same or different racks),
limit when loaded between Complied
when loaded between 50 to 100% of its rated capacity for all working 50 to 100% of its rated
conditions. capacity for all working
condition
1.2.2.4.2 In the event of failure of DSCA, FR/FC, FR/BC modules’ parameters In the event of failure of
shall not be disturbed. All the FR/FC FR/BC modules shall take care of DSCA, FR/FC, FR/BC Complied,
the load on default settings and share the load collectively. modules’ parameters will not
be disturbed. All the FR/FC
modules will take care of the
load on default settings and
share the load collectively.
1.2.2.5 Battery Monitoring:
1.2.2.5.1 Battery under voltage isolation: There shall be a provision for The Single Pole DC contactor Complied
Automatic isolation/reconnection of each battery from the load. The DC is used for Battery
contactor used for the purpose shall be of single pole only. connection/reconnection.
Cut off:1.85V/cell
(44.4V+0.25V) is Settable
The operate and release voltages for the above conditions shall be as between 1.70V& 1.9V cell.
follows: Reconnect : When the FR/FC
voltage has built-up fully.
Will be settable between
2.15v to 2.3V/cell
Cut-off: 1.85V/cell (44.4V+0.25V) shall be settable between
1.85V and 1.9V/cell)
Reconnect: When the FR/FC voltage has built-up fully. Shall be settable
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
1.2.2.5.2 Battery Health Monitoring in Auto Mode: To keep the battery in To keep the battery in healthy
healthy state, the battery condition shall be continuously monitored. On state, battery condition is Complied,
restoration of AC mains after an interruption, depending on the sensed continuously monitored by
battery condition (depth of discharge), the system shall change over to controller unit & depending
Auto Charge mode to charge the battery at higher voltage of 55.2V till the on the depth of discharge
battery is fully recouped. ,system change over to auto
float to auto charge mode to
change the battery at higher
voltage off 55.2V till the
battery is fully recouped .this
is subject to availability of
mains .the performance
checked & found ok. Meets
the requirements.
1.2.2.5.3 Battery Health Check (Optional): There shall be a provision of Battery Health monitoring Complied,
monitoring the voltage, current, trickle current, conductance and system provided for
temperature (programmable) of the batteries associated with the power monitoring voltage ,current
plant at a set periodicity. There shall also be a provision of monitoring of ,trickle current ,conductance
each cells of the battery bank for voltage and temperature. and temperature
(programmable) of the
batteries associated with the
The provision for conducting a partial discharge (about 20%) test, of a power plant at asset
pre- determined duration and frequency, shall be made available in the periodicity as well as
power plant (Frequency and duration of partial discharge test shall be provision of monitoring of
programmable). During this test, the current and voltage of the battery as each cells of battery bank for
well as each individual cell shall be recorded. It shall also record the voltage and temperature all
conductance and temperature of each cell. other parameter also meet the
requirement.
comparison.
1.2.2.5.5 Battery path Current Limiting Circuit : In Auto Mode the current The current in each battery Complied
in each battery path shall be settable as per the battery capacity so path separately is settable as
that the battery path current is kept at 10 % of battery AH capacity. per the battery capacity so
Tendering Authority will that the battery path current is
kept at 10% ( settable) of
battery ah capacity ( settable)
give the capacity of the battery to be used for this purpose. For the type .However the range of setting
approval the manufacturer shall demonstrate the facility and undertake to is 0 to 50% of battery ah
make provision as per order. capacity
1.2.2.6.2.1 In case output DC voltage exceeds –56V, the over voltage protection Dc over voltage protection Complied
circuit shall operate and shut-off the faulty module. A tolerance of +/- circuit operates at 56.25v
0.25V is permitted in this case. Restoration of the module may be (Settable) and shuts off the
through manual or through DSCA”. faulty modules and
restoration of the module
through a reset feature on the
controller’s front panel.
1.2.2.6.2.2 Shutting-off of faulty FR/FC module shall not affect the operation of Meets the requirement Complied,
other FR/FCs operating in the rack.
1.2.2.6.2.3 Operation of over-voltage shut down shall be suitably indicated on the Operation of over- voltage Complied
module and also extended monitoring/control unit. shut down is suitably
indicated on the module and
also extended to
monitoring /control unit.
1.2.2.6.2.4 The circuit design shall ensure protection against the discharge of the Meets the requirement Complied
Battery through the FR/FC module in any case.
1.2.2.6.2.5 The over voltage protection circuit failure shall not cause any safety The over voltage protection Complied
hazard. circuit failure does not cause
any safety hazard. This
function is part of internal
circuitry of FR/FC Module.
1.2.2.6.3 Fuse / Circuit Breakers: Fuses or circuit breakers shall be provided for Followings are provided- Complied
each FR/FC, FR/BC module as follows: a. Circuit breaker is
provided for each
FR/FC AC Line I/P.
a. Live AC input line (MCB) b. In-built short
circuit protection
b. Negative D.C output (enclosed ultra-fast blow fuse assembly provided at each FR/FC
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
or DC circuit-breaker). module.
c. provided
c. Against failure of Control sensing circuit.
1.2.2.6.3.1 All fuses/circuit breaker used shall be suitably fault rated. Meets the requirement Complied,
1.2.2.6.4 Over Load/Short Circuit: The FR/FC shall be protected for over The FR/FC is protected for Complied
load/short circuit as per clause 1.2.2.10.9.2. over load /short circuit
1.2.2.7 Monitoring Alarms and Indicating Lamps Provided and Meets the Complied,
requirement
1.2.2.7.1 Functional Indications: The following functional indications shall be The function indication for a) Complied,
provided on FR/FC & DSCA : is provided on both DSCA
and FR/FC modules while b
a) Mains available &c are provided on DSCA
b) FR/FC, FR/BC On Auto Float only.
1.2.2.7.3 All the alarms shall be DC operated only. Also all alarm circuits shall be All the alarm is DC operated Complied
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
provided with suitable delay to ensure that they do not operate with only. Also all alarm circuits
transients. is provided with suitable
delay to ensure that they do
not operate with transients.
1.2.2.7.4 All the alarms and protection limits shall be settable through a menu All the alarms and Complied DC higher
driven program. protection limits are voltage protection
settable through a menu limit for modules
driven program. level is preset.
1.2.2.7.5 All the protections/alarms shall be within tolerance of 0.25V in case of All the protections/alarms Complied,
DC voltage and 1% in case of current. For AC voltage it shall be +/- 5V. shall be within tolerance of
0.25V in case of DC
voltage and 1% in case of
current. For AC voltage it
shall be +/- 5V.
1.2.2.7.6 Every Alarm condition shall be accompanied with an Audio alarm, with Meets the requirement Complied
audio cut- off facility.
1.2.2.7.7 Potential free contact two (one for alarm and one redundant) shall be Provided and the requirement Complied
provided for extending the fault alarm to Switch room.
1.2.2.9.1 AC input Supply : The Power Plant using FR/FC modules of 25/50A (a) Single phase Complied
shall operate from single phase AC input & FR/FC module of ( Nominal
100/200A capacity shall operate from three phase/4 wire AC input. The
nominal input frequency is 50Hz, which may vary from 48-52Hz. The 230V),120-300V
input voltage range shall be as given below: AC only
(b) N/A
50A FR/FC module shall operate on single phase with three phase / 4wire
AC input distribution. Power Plant shall cut off below 120V.
1.2.2.9.1.1 For three phase/4 wire FR/FC, FR/BC modules only delta -N/A- -N/A-
connections are permitted. FR/FC, FR/BC modules shall work
satisfactorily for unbalance of +/- 10% of nominal input. Phase current
unbalance, under all working conditions, mentioned in this document,
shall not be more than 10%. Neutral phase current shall not exceed
100mA under all specified input and load conditions.
2015
1.2.2.9.1.3 Neutral path current in case of single phase FR/FC modules in each Natural current is not more Complied
phase of three phase distribution shall not exceed the limit set by than Line current in any
State Electricity Board / Other Regulatory Authority. condition
1.2.2.9.2 DC output Characteristics (Auto Float Charge operation): The The module is capable of Complied
Module shall be capable of operating in “Auto Float-cum- Charge” operating in auto float-cum
mode. It shall be programmed to operate as a float rectifier or a charger, charge mode. It is
depending on the condition of the battery sets being sensed by the DSCA. programmable to operate as a
float rectifier or a charger
,depending as a condition the
battery sets being sensed by
DSCA
1.2.2.9.2.1 Auto Float Mode: The float voltage of each rectifier module shall The float voltage of each Complied
be continuously adjustable and pre-settable at any value in the range of rectifier module will be
-48 to -56V from FR/FC, FR/BC modules or DSCA. There shall also be a continuously adjustable &
provision of setting the float/charge voltages globally from DSCA. There pre-settable at any value in
shall also be a provision so that DSCA may over ride the values set by the range of -48 to -56V
individual module. The prescribed float voltage settings are -52.8V for From DSCA. There is
conventional battery and -54V for VRLA battery respectively. Float provision off setting the
Voltage adjustment may be made globally, and not for individual float /charger voltage
rectifiers”.
globally from DSCA
1.2.2.9.2.2 Auto Charge Mode: In Auto charge mode FR/FC shall supply Complied Complied,
battery & equipment current till terminal voltage reaches set value,
which is normally 2.3V/cell (-55.2V, this value shall be settable between
-48V and -56V) and shall change over to constant voltage mode. It
shall remain in this mode till a change over to float mode signal is
received.
1.2.2.9.2.3 The DC output voltage at the terminals shall be maintained within +/-1% Meets the requirement Complied,
of the half load preset voltage from 25% load to full load condition when
measured over the full specified input range.
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
1.2.2.9.3 Efficiency: The efficiency of the single phase and three phase unit shall be Within the Limit Complied,
as given below:
a) At nominal input, output and full rated load better than 89% better than
90%
b) Other specified Input, output conditions better than 85% better than 87%
and load between 50% to 100%.
1.2.2.9.4 Input Power Factor: The true input Power Factor at nominal input, Within the Limit Complied,
output voltage and rated load shall be better than 0.98 and shall be better
than 0.95 in any other working condition and load between 50% to
100%. Active Power factor correction only shall be employed for the
purpose.
1.2.2.9.5 A resistor shall be provided to discharge the capacitors after the Rectifier Provided and Meets the Complied
modules have stopped operation and output is isolated. requirement
1.2.2.9.6 Electrical Noise: The Rectifier (FR/FC) Modules shall be provided with Provided and Meets the Complied
suitable filter on the output side. requirement
1.2.2.9.6.1 Psophometeric Noise: Psophometeric Noise (e.m.f. weighted at Within the Limit Complied,
800Hz), with a battery of appropriate capacity connected across the
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
output should be within 2mV, while delivering the full rated load at
nominal input (400V AC for three phase supplies and 230V for single
phase supply). For test purposes, this shall be taken as equivalent to
4mV when the battery is not connected, other conditions remaining the
same as per ITU-T Rec. O.41.
1.2.2.9.6.2 The Peak-to-Peak Ripple : Voltage at the output of the rectifier Within the Limit Complied,
module, without battery connected, shall not exceed 300 mV at the
Switching Frequency measured by an Oscilloscope of 50/60 MHz band-
width (Typical).
1.2.2.9.7.1 Soft Start Feature: Slow start circuitry shall be employed such that Within limits and Meets the Complied and
FR/FC module input current and output voltage shall reach their nominal requirement Verified
value within 10 seconds. The maximum instantaneous current during
start up shall not exceed the peak value of the rectifier input current at
full load for the lowest input voltage specified.
1.2.2.9.7.2 Voltage overshoot/Undershoot : The requirements of this clause shall Within limits and Meets the Complied,
requirement
be achieved without a battery connected to the output of The
FR/FC module.
FR/FC modules shall be designed to minimise output voltage
Overshoot/Undershoot such that when they are switched on the DC
output voltage shall be limited to +/-5% of the set voltage & return to
their steady state within 20 ms for any load of 25% to 100%.
1.2.2.9.7.3 The DC output voltage overshoot for a sudden change in AC Within limits and Meets the Complied,
mains from specified lowest to highest and vice-versa shall not cause requirement
shut- down of FR/FC module and the voltage overshoot shall be limited
to +/- 5% of its set voltage and return to steady state within 20 ms.
1.2.2.9.7.4 The modules shall be designed such that a sudden load change of 25 to Within limits and Meets the Complied,
100% shall not result in DC output voltage Overshoot/ Undershoot of requirement
not more than 5% and return to steady state value within 10 ms
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
1.2.2.9.8.1 Total Voltage Harmonic Distortion: The Total line harmonic Within limits and Meets the Complied,
voltage distortion shall not be more than 10% in conformity with requirement
CIGRE's limits.
Note: The above Harmonic Distortion limits are as per communication
received from Central Electricity Authority vide their office letter No.
GO2/Comm.I/1/1-95/962 dated 22.12.92.
1.2.2.9.8.2 Total Current Harmonic Distortion: The total harmonic distortion Within limits and Meets the Complied,
shall be limited as per EN 61000-3-2 Ed.2:2000. The total current requirement
harmonic distortion contributed by the unit at the input shall not exceed
10% for input voltage range 120V-300V for single phase units and
320V to 480V for three phase systems; for load between 50 to 100% of
the rated capacity.
1.2.2.9.9 Current limiting (Voltage Droop): The Current limiting (Voltage Within limits and Meets the Complied,
Droop) shall be provided for Float/Charge operation. The float/charge requirement
current limiting shall be continuously adjustable between 50 to 100% of
rated output current for output voltage range of -44.4 to -56 volts. For test
purposes upper limit of 100% + 5% and lower limit of 50% - 5% shall be
acceptable.
1.2.2.9.9.1 The float and charge current limit adjustment shall be provided: Within limits and Meets the Complied & Verified
requirement
Either on the front panel of the individual FR/FC, FR/BC module
through a menu driven program
or
system.
1.2.2.9.9.2 The FR/FC modules shall be fully protected against short circuit. It Within limits and Meets the Complied,
shall be ensured that short circuit does not lead to any fire hazard. The requirement
unit shall start delivering output automatically when the short circuit is
removed.
1.2.3.1 The conventional lead acid batteries have special requirement of -N/A- -N/A-
periodic Boost charging @ 2.7V/cell. To meet this requirement, the The Power Plant offered is
power plant shall be so configured that in addition to the specification Compatible with VRLA
requirements, detailed in clause 1.1 to 2.2.9.3, shall also have a Batteries only. Hence not
provision of a group of FR/BC(as per battery capacity) for charging Applicable for Conventional
the batteries (one set at a time) @ 2.7V/cell after isolating both the Batteries.
battery and FR/BC group from the load bus. In addition to FR/FCs the
power plant shall have the following additional units.
1.2.3.2 Float Rectifier-Float Charger-Boost charger (FR/BC) : The FR/BC -N/A- -N/A-
module shall be programmable to work as FR/FC or BC.
1.2.3.2.1 When programmed, FR/FC it shall be capable of working as FR/FC -N/A- -N/A-
with other FR/FC and shall comply with all the requirements of FR/FC.
The rated capacity of the FR/BC as FR/FC shall be same as that of
the other FR/FCs. The prescribed Float voltage setting for
conventional batteries is 52.8V.
1.2.3.2.2 It shall also be programmable as a Boost Charger (BC) under -N/A- -N/A-
manual control after isolating it from the float bus.
1.2.3.2.2.1 As a Boost charger its output voltage shall be continuously adjustable -N/A- -N/A-
and pre- settable at constant current up to 100% for voltage range 44.4V
to 56V and up to 50% of the rated capacity at any value in the range
56V to 64.8V.
1.2.3.2.2.2 The Boost voltage shall be maintained within +/-1% of the set value -N/A- -N/A-
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
1.2.3.2.2.3 The Float and Boost current limit adjustment shall be provided on -N/A- -N/A-
the front panel of the FR/BC module.
1.2.3.2.3.1 The current sharing shall be within +/- 10% of the average current per -N/A- -N/A-
FR/BC module (in BC mode) in the system (mounted in the same or
different racks) when loaded between 50 to 100% of its rated capacity
(as BC) for all other working conditions.
1.2.3.2.4 In addition to the Visual indications/display specified for FR/FC the -N/A- -N/A-
following shall also be provided:
1.2.3.2.5 Protection: The module shall also be protected against D. C. Over -N/A- -N/A-
voltage in BC mode.
1.2.3.2.5.1 Shutting-off of faulty FR/BC module in FR/FC mode shall not -N/A- -N/A-
affect the operations of other FR/FC & FR/BC in FR/FC mode and
other BC while working in BC mode.
1.2.3.3.1 Switching Arrangement: The switching arrangement may have -N/A- -N/A-
handled enclosed knife fuse assembly or any other suitable arrangement
in the same or separate rack for the following facilities:
1.2.3.3.1.1 Battery Auto Float Charge/Boost selection arrangement for selecting: -N/A- -N/A-
1.2.3.3.1.1. The above arrangement shall be provided with a suitable -N/A- -N/A-
1 inter-locking arrangement so that one of the batteries is always on Float.
In case interlocking arrangement is not feasible due to the rack size, a
provision of Alarm shall be made in the event of all the batteries are
isolated accidentally.
1.2.3.3.1.1. The capacity and number of batteries shall be as per order. For the -N/A- -N/A-
2 purpose of Type Approval, it shall be taken as three batteries.
1.2.3.3.1.2 FR/BC switching arrangement: This switching arrangement shall be -N/A- -N/A-
provided for connection of FR/BC group to the Float bus for Auto Float
Charge operation or Boost Charge bus for Boost Charging of the battery
after its isolation from the Float Bus.
1.2.3.3.2 Alarms: The following additional alarms shall be provided for Boost -N/A- -N/A-
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
1.2.3.4 Sleep Mode Operation: While calculating the composition of a Sleeping mode is provided in Complied,With
particular power plant, the power plant ultimate capacity/SMPS module FR/FC module and setting is addendum letter from
rating, the sum total of the load current and charging current of the provided in DSCA. BSNL
battery is considered. In actual operation the battery is fully charged, the CGMOA/TSA/Tec
power plant will supply to only exchange load. Under this condition
h-Corr/PPl14-15/92
keeping all the modules “ON” will result in poor over all efficiency.
Hence by selecting to switch off the extra modules will improve the dtd.@ Banoalore-
overall power consumption and also result in higher reliability and life 41 the 27.10.2016
time of the modules. This is feature is popularly known as “SLEEP
MODE”. However, for small size power plant working on single
phase in rural areas, sleep mode operation is not required.
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
PART 2
GENERAL REQUIREMENTS
No. : BSNL/Specification/SMP – 001/01/Rev-1/September.2015
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
Test levels:
Within limit. Meets the
Voltage Rise time (First peak) : 75 nano sec +/- 20%. Oscillation
requirement
Frequencies : 100KHz & 1 MHz +/- 10% Complied,
Repetition rate : at least 40/s for 100KHz and 400/s for
1 MHz Decaying : 50% of the peak value between the
3rd & 6th periods
Burst duration : not less than 2 s
Surge amplitude : 250V(-10% ) to 2.5 KV(+10%)
Wave shape : Damped
Test Procedure: Test set up, test procedure & Measurements shall be
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
Test level:
Within limit. Meets the
Contact discharge Air Complied,
requirement
Leve Test voltage Leve discharge
Test voltage KV
l4 KV 8 4l 1
5
Test Procedure: This test shall be conducted as per IEC 61000-4-2 for
both requirements & unit shall comply of clause 9(1) of IEC 61000-4-2
Test level:
Open–circuit output test voltage (+/-10%) &repetition rate of impulses (+/-
20%)Level On Power supply port, Protection Earth Test
Within limit. Meets the
Complied,
Voltage peak KV Repetition rate KHz requirement
4 4 2.
Rise time of one Pulse - 5 ns +/- 30% 5
Impulse duration - 50 ns +/- 30%
Procedure: This test shall be conducted as per IEC 61000-4-4. Test
results shall be in compliance of clause 9(1) of IEC 61000-4-4
2.1.6 Radiated radio-frequency Electromagnetic field immunity Within limit. Meets the Complied,
limits: requirement
The limits as per IEC 61000-4-3.
Test level:
Frequency range : 80 MHz to 1000 MHz.
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
Test level:
Note: The rated voltage of the MOVs used for the above shall not be less
than 320V.
2.1.8 Radio-Frequency Conducted Susceptibility immunity limits : The Within limit. Meets the
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
Test level:
2.1.9 At the Time of Type approval the testing officer shall ensure that the Within limit. Meets the
Complied & Verified
power plant is in compliance of the clauses 2.1.1 to 2.1.8 given above. requirement
grill to prevent foreign material larger than 5 mm dropping into the rack.
2.4.1.3 The rack shall be designed for easy maintenance and installation. Rack Meets the requirement complied
mounting arrangement shall provide easy access from front, rear and
top for Installation and Maintenance.
2.4.1.4 The individual FR/FC module shall be easily mounted to/removed The FR/FC modules are plug Complied,
from the front side of the rack. The FR/FC module shall be designed to in type. The individual is
slide into the rack on a suitable mechanical arrangement. The associated easily mounted /removed
AC input, DC output connections, Control, alarms & interface cable from the front side of the
connecting the modules shall be connected/disconnected easily rack.
without causing any interruption in the supply and damage to load or
other working module.
2.4.1.5 Proper thermal engineering of hardware design shall be done For the system, using 25A complied
by the manufacturer so as to ensure the uninterrupted use of the FR/FC modules and meeting
equipment. The rack complete with all panels fitted shall be designed the requirement of this GR
to allow cooling by natural convection. For the systems, using 25A, clause
50A, 100A & 200A FR/FC, FR/BC modules force cooling is permitted.
Use of DC Fans only are permitted for the purpose. There shall be an
arrangement for automatic Switching-OFF of fans during AC input
failure. If required, individual modules may be separated by air baffle to
provide effective convection. The manufacturer shall also ensure that
the failure of fan does not cause any fire hazards. The failure of any of
the fans shall draw immediate attention of the maintenance staff.
2.4.1.6 Facility shall be made to connect external AC power at the top/bottom AC power at top of rack and Complied & Verified
of rack and alarm cable & DC output distribution module at the top also alarm cable & DC output
of the rack. Where cables pass through metal panels suitable bushing distribution module at the top
shall be provided to protect cables from damage. Bus-bars, if used, of the rack .Where cable pass
shall be suitably spaced, insulated and bushed(where it passes through through metal panel’s
holes) to prevent any possibility of short circuit between bus-bar and/or suitable grommet strips are
rack. provided to protect cables.
Bus bar ,where used is
25*5mm with suitable
spacing mounted on fixed
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
isolation struts
2.4.1.7 With doors in position, all Visual alarms & meters shall be clearly The Visual alarms & Complied & Verified
visible. In case of hinged door meters & alarm indications are Parameter values are
permitted on door provided, the fixtures on the door do not restrict the displayed in the LCD display
movement of door in any way. panel of Smartpack-S
Controller mounted inside
cabinet.
2.4.1.8 Dimensions: The rack shall only be 19” (482.6mm). Nominal Sub rack is19” Complied & Verified
dimensions of the rack may be as under:
2.4.1.9 SMPS Power Plant System Ultimate Capacity: Complied for Power Plant complied
with Ultimate Capacity 150A
(a) SMPS Power Plant with Single Phase 25A/50A FR/FC Modules with (5+1) configuration (with
single phase A.C Supply. R/Y/B= 2+2+2), housed in a
single rack
(b) SMPS Power Plant with Single Phase 50A FR/FC Modules having
three phase distribution in to three ratings:
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
(c) SMPS Power Plant with Three Phase 100A FR/FC Modules: Power
Plant categorized in to three ratings:
ii. Power Plant with ultimate capacity 1000A (in Single Rack) i.
Power Plant with ultimate capacity 600A (in Single Rack)
iii. Power Plant with ultimate capacity 1500A (can be in two Racks with
Main Rack capacity up to 1000A & Extension Rack capacity up to
500A). (d) SMPS Power Plant with Three Phase 100A or 200A FR/FC
Modules with
capacity more than 1500A.
2.4.2.2 AC input to FR/FC or FR/BC shall be through composite type hot plug-in AC input to FR/FC Module Complied
connectors. DC output shall be through hot plug-in connector on the & DC output is through hot
FR/FC or FR/BC side and through lugged termination on the bus- plug-in arrangement in the
bar/termination end. Control, alarm and monitoring connections shall Back Plane assembly of
only be through polarised connectors. Rectifier Shelf. AC input to
FR/FC & DC output are
connected through connector on
the mother board of the sub rack
.
2.4.2.3 The FR/FC, FR/BC module shall be removable from the front of the rack Modules are removable from Complied
only. All AC input, DC output and alarm/control/monitoring cables the front of the rack.
interconnecting the modules and racks shall be easily disconnected by
plugs or connectors.
2.4.3.3 DSCA shall be provided for the ultimate system capacity as DSCA is provided for Complied
explained in Clauses 2.2.2 and 2.2.3. All AC, DC or control/alarm ultimate capacity. All AC,
cabling/wiring shall be pre-wired for the ultimate capacity so that mere DC or control/alarm
plugging-in of FR/FC, FR/BC module shall add to the DC power cabling /wiring are per-wired
output. It shall be ensured that the modules are not site specific. for the ultimate capacity
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
2.5 Accessibility
2.5.1 All the termination points shall be easily accessible from front, rear or All the termination points are Complied
top. easily accessible from front
or top.
2.5.2 AC and DC terminals shall be separated by physical barriers to AC and DC terminals Complied
ensure safety. are separated B y fire
retardant isolation struts
to ensure safety.
2.5.3 All the terminals except AC earth shall be electrically isolated. Meet the requirement Complied
2.6 Terminations:
2.6.1 AC Terminations
2.6.1.2 The input terminals shall be clearly marked as R, Y, B & N for three The input terminals is clearly Complied
phase and L and N for single phase as applicable. marked R, Y, B, for Input
Line and N & E for Neutral
& Earth.
2.6.1.3 AC input termination shall be suitably protected against the All termination are finger Complied
accidental touch/contact with the working staff for their protection & touch proof “ DANGER”
shall also have clear & prominent "DANGER" marking. AC marking
terminations shall be through standard finger safe lock-in type
connectors conforming to BIS or any other international standard,
with the concurrence of CACT.
2.6.1.4 Screening shall be provided between AC & DC components to Isolation screen has been Complied
prevent accident. provided between AC &DC
component to prevent
accident
2.6.1.5 The AC input connection to the rectifier module shall be by a The ac input connection to Complied
composite type hot plug-in connectors and socket arrangement. the rectifier module are
lockable type with hot plug –
in arrangement
2.6.1.6 Fuses and Circuit-breakers for each FR/FC, FR/BC shall be Circuit breaker for each Complied
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
2.6.2 DC Terminations
2.6.2.1 The male connectors shall be mounted in the FR/FC, FR/BC module The male connectors are Complied
and female connectors be terminated to the cable. mounted in the FR/FC
module and female connector
are mounting to back panel
2.6.2.2 The DC output to Battery and Load shall be through cable/bus-bars up The DC output to battery and Complied
to the rack capacity of 450A ultimate capacity and bus-bar only for load are through cable /bus-
higher capacities or as per users requirement. However for inter-rack bars and meets the
connections, cables of proper rating are permitted. requirement.
2.6.2.3 The provision for interconnection between exchange and FR/FC, The provision for
FR/BC or battery (along with switching arrangement) and interconnection between,
terminations for Exchange, Battery & FR/FCs, FR/BCs shall be terminations for exchange Complied
made. The isolation of any of the battery from the load shall create an Battery are made using tinned
alarm. copper bus bar.
The isolation of any of the
battery from the load creates
an alarm.
2.6.3.4 All DC + ve and – ve leads shall be clearly marked. All DC +VE& -VE leads are Complied
clearly marked
2.6.3 All the AC, DC Control & alarm cabling shall be supplied with the All the AC,DC control & Complied
rack. alarm cabling are supplied
with the rack
2.7.1 Bus-bar Riser height, wherever applicable, shall be 250 mm for Meets the requirement Complied
both exchange and battery. Bus-bar Riser should be used for higher
capacity of exchange load and battery more than 450 Amp. There
shall be no bus-bar in outdoor units.
2.8 Cabling and Wiring All the wires and cable are Complied,
used fire retardant as per IS
All insulated conductors except those within the confines of I554 with amendment
a printed circuit board assembly shall be of the rating enough to 1(June94).all the cables &
withstand the maximum current and voltage during fault and overload. wires are used Rodent &
All the wires and cables used shall be fire retardant as per IS 1554 with reptiles repellant type.
amendment 1 (June 94). All the cables & wires used shall also be
Rodent & reptiles repellent.
2.8.1 All wiring shall be neatly secured in position and adequately Meet the requirement Complied
supported.
Where wires pass through any part of metal panel or cover the hole
through which they pass shall be suitably bushed.
2.12.1.2 Fuses or circuit breakers shall be provided wherever appropriate for the As per BIS specification Complied
protection against failure of control/sensing circuit. Fuses shall
conform to B.I.S specification.
2.12.1.3 Meters: There shall be provision to monitor AC voltage of the system The provision exist to
and DC current as well as voltage with the help of Digital meters to monitor AC voltage DC Complied,
read the voltage and current of the System, any of the Battery or any current /voltage of system all
of the individual FR/FC (at individual FR/FC module also three battery parameter &
permitted). Digital meter’s display/resolution should be such module normally the meter
that it is clearly and unambiguously readable from a distance of 1 mounted at DSA indicated
metre. Normally the meters mounted at DSCA shall indicate the the system voltage , Load
System voltage and current. current& battery current.
a) The equipment shall manufacture in accordance with international management system ISO- Complied,
quality management systems ISO-9001-2000, for which the 9001-2000 and Following the
manufacturer shall be duly accredited. A quality plan describing latest BSNL QA guidelines
the quality assurance system followed by the manufacturer would indicated in quality
be required to be submitted.
b) The equipment shall be manufactured as per the latest BSNL QA
Guidelines indicated in Quality Manuals QM-118 (Quality reliability
in product design), Manuals QM-202 ( Pictorial guidelines for
Visual assessment of quality of printed board assemblies (PBA) and
discrete terminal assemblies), QM-204 (Guidelines for workmanship
standards for repair & modification of printed wiring board
assemblies), QM-205 (Guidelines for standard of workmanship for
printed boards), QM-206 (Guidelines for standard of workmanship for
printed boards assemblies), QM-207 (Guidelines for soft solder and
fluxes for Telecom Equipments) and QM 210 (Guidelines for standard
of workmanship for surface Mounting Devices).
2.12.3 Quality Assurance Tests: Each of the units supplied against the Noted noted
specific order after type approval shall be inspected and tested to
ensure that the requirements of this document have been met. These
tests shall be carried out by QA wing of BSNL.
2.12.4 Finish and painting: The finish of the structure and panels shall The finish of the structure Complied
conform to the latest issue of IS 101 and IS 168. The structure and and panels are confirmed to
panels shall only be powdered coated. The thickness of powder the latest issue of IS 101 & IS
coating shall be between 50 to 70 micrometers. The Colour used shall 168. Satin blue no.177
conform to IS 5 latest issue. Colour scheme shall be as follows:
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
2.12.5.3 A cabling diagram, screen printed or any other better Laminated cabling diagram, Complied,
arrangement ensuring better life expectancy shall be placed in the is provided inside of the front
inside of the front door or any other convenient place for ready door for ready reference of
reference of the maintenance staff. the maintenance staff.
2.13 Name plate
2.14.1 Module Replacement Time: The mean time to replace a faulty Less than 20 minutes Complied
rectifier module shall be less than 20 minutes.
2.14.2 MTBF (Mean Time between Failures): MTBF of the system shall MTBF of the system is more
not be less than 100,000 hours. The MTBF for fans shall be better than 100,000 hours the Complied,
than 70,000 hours at 40 degree C. The concurrence of CACT of QA MTBF for fans is more than
wing of BSNL in this regard is mandatory. The MTBF shall be 70,000 hours at 40 degree
verified as per QM-115. MTBF, predicted and observed values shall Calculation of MTBF is
be furnished along with calculations by the manufacturer. Based on enclosed.
these figures three years maintenance spares shall be specified by
the equipment supplier. The equipment availability shall exceed
99.9%.
2.17.2.2 Voltage Proof Test The circuit has been tested Complied,
with voltage of 1500V/50Hz
is applied for one minute.
- Between earth and
With EMI/RFI capacitors and MOVs/Tranzorbs removed from the interconnected output
circuit a test voltage of 1500V/50Hz is applied for one minute. terminals.
- Between earth and interconnected output terminals. - Between interconnected
input and output
- Between interconnected input and output terminals. terminals.
No Breakdown or abnormal
temperature occurred.
(Test result enclosed)
Alternatively, without removing EMI/RFI capacitors, the lightning
protection circuitry and Tranzorbs etc., but with EMI/RFI discharge
resistors removed:
PART 3
Guidelines for the Purchaser/User
No.: BSNL/Specification/SMP - 001/01/Rev-1/September.2015
ANNEXURE – 1
Protocol or Sequence of Exchange of information between Power plant & Complied
Remote Site Monitoring equipment :
Refer GR.
ANNEXURE – 2
The following items need to be specified while ordering by Tendering Authority BSNL QA Wing shall Verify
depending on the requirements. this Clause to match with
i) Application : AC Input : Single Phase Ordering information of
Three Phase Tendering Authority at the
Rack Height : 1500mm time of Bulk inspection and
2200mm testing.
ii)Category and Ultimate capacity of power plant as per clause 2.2.3 Vi) Complied with only
iii)Rating of the basic module: 25A/50A/100A/200A as per Category.. VRLA battery.
iv) Number of basic modules required at present including redundant units.
v)Power Plant Compatible with VRLA batteries only or with both VRLA and
conventional batteries.
vi) Remote Monitoring requirements: Required / Not Required.
i) Battery Health Check requirements: Required / Not Required.
viii) Capacity of the battery proposed in Ampere Hours.
ix) Number of batteries proposed at present and Ultimate.
Important Notes :
1. Load shall include equipment load, battery load at C/10 rate of charge and
other load (inverter etc.) if any. Noted
2. While choosing the power plant the user shall ensure that the redundancy
requirement has been taken care of.
3. It may be ensured that minimum two Batteries are chosen to meet the load
requirement.
CLAUSE REQUIRMENT OBSERVATION REMARKS
NO
End Of Compliances