PE Pipe - Earthwork and Road Reinstatment Calculation

Demolish of Volume Volume Volume Volume Sub


Length Asphalt
OD Sheating Excavation Bedding Backfilling Base
[m] Surface
[m³] [m³] [m³] [m³]
[m²]

63 yes 346.97 368.829 345.062 82.788 146.536 69.012


75 yes 0.00 0.000 0.00 0.00 0.00 0.00
90 yes 162.61 177.245 168.30 43.04 68.44 33.66
110 yes 1723.35 1,912.919 1,835.37 490.04 721.91 367.07
160 yes 164.85 191.226 187.93 55.11 67.65 37.59
225 yes 1420.49 1,740.100 1,757.86 568.66 556.65 351.57
250 yes 0.00 0.000 0.00 0.00 0.00 0.00
315 yes 0.00 0.000 0.00 0.00 0.00 0.00
4,390.32 4,294.52 1,239.65 1,561.20 858.90
4,391.00 4,295.00 1,240.00 1,562.00 859.00

DI Pipe - Earthwork and Road Reinstatment Calculation


Demolish of Volume Volume Volume Volume Sub
Length Asphalt
DN Sheating Excavation Bedding Backfilling Base
[m] Surface [m³] [m³] [m³] [m³]
[m²]

50 yes 0.00 0.000 0.000 0.000 0.000 0.000


65 yes 0.00 0.000 0.000 0.000 0.000 0.000
80 yes 0.00 0.000 0.00 0.00 0.00 0.00
100 yes 0.00 0.000 0.00 0.00 0.00 0.00
125 yes 0.00 0.000 0.00 0.00 0.00 0.00
150 yes 0.00 0.000 0.00 0.00 0.00 0.00
200 yes 0.00 0.000 0.00 0.00 0.00 0.00
250 yes 20.21 25.263 25.77 8.61 7.73 5.15
300 yes 0.00 0.000 0.00 0.00 0.00 0.00
25.26 25.77 8.61 7.73 5.15
30.00 30.00 10.00 10.00 10.00

* Excavation Depth = Total Depth - Surface Layer thickness (Concrete, Asphalt, Concrete Tiles at pavements,
ment Calculation
Volume Volume Volume
Wearing
Base Layer Binder Layer
Layer
[m³] [m³]
[m³]

46.008 22.130 14.753


0.00 0.00 0.00
22.44 10.63 7.09
244.72 114.78 76.52
25.06 11.47 7.65
234.38 104.41 69.60
0.00 0.00 0.00
0.00 0.00 0.00
572.60 263.42 175.61
573.00 264.00 176.00

ment Calculation
Volume Volume Volume
Wearing
Base Layer Binder Layer
[m³] [m³] Layer
[m³]

0.000 0.000 0.000


0.000 0.000 0.000
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
3.44 1.52 1.01
0.00 0.00 0.00
3.44 1.52 1.01
10.00 10.00 10.00

Concrete Tiles at pavements, Cobblestones)


PE Pipe - Earthwork and Road Reinstatment Calculation
Demolish of Volume Volume Volume Volume Sub
Length Concrete
OD Sheating Excavation Bedding Backfilling Base
[m] Surface
[m³] [m³] [m³] [m³]
[m²]

63 yes 250.76 216.406 249.381 59.832 105.904 49.876


75 yes 0.00 0.000 0.00 0.00 0.00 0.00
90 yes 167.68 149.235 173.55 44.39 70.58 34.71
110 yes 49.70 45.227 52.93 14.13 20.82 10.59
160 yes 0.00 0.000 0.00 0.00 0.00 0.00
225 yes 75.57 77.459 93.52 30.25 29.61 18.70
250 yes 0.00 0.000 0.00 0.00 0.00 0.00
315 yes 0.00 0.000 0.00 0.00 0.00 0.00
488.33 569.38 148.60 226.91 113.88
489.00 570.00 149.00 227.00 114.00

DI Pipe - Earthwork and Road Reinstatment Calculation


Demolish of Volume Volume Volume Volume Sub
Length Concrete Excavation
DN Sheating Bedding Backfilling Base
[m] Surface [m³] [m³] [m³] [m³]
[m²]

50 yes 0.00 0.000 0.000 0.000 0.000 0.000


65 yes 0.00 0.000 0.000 0.000 0.000 0.000
80 yes 0.00 0.000 0.00 0.00 0.00 0.00
100 yes 0.00 0.000 0.00 0.00 0.00 0.00
125 yes 0.00 0.000 0.00 0.00 0.00 0.00
150 yes 0.00 0.000 0.00 0.00 0.00 0.00
200 yes 0.00 0.000 0.00 0.00 0.00 0.00
250 yes 0.00 0.000 0.00 0.00 0.00 0.00
300 yes 0.00 0.000 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00

* Excavation Depth = Total Depth - Surface Layer thickness (Concrete, Asphalt, Concrete Tiles at pavements,
nt Calculation
Volume Volume
Base Layer Concrete
[m³] [m³]

33.251 21.641
0.00 0.00
23.14 14.92
7.06 4.52
0.00 0.00
12.47 7.75
0.00 0.00
0.00 0.00
75.92 48.83
76.00 49.00

nt Calculation
Volume Volume
Base Layer Concrete
[m³] [m³]

0.000 0.000
0.000 0.000
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

Concrete Tiles at pavements, Cobblestones)


PE Pipe - Earthwork and Road Reinstatment Calculation
Dismantling
Volume
Area Volume Volume Volume Sub
OD Sheating Length Concrete Excavation Bedding 0/4 Backfilling Base 0/63
[m] 0/63
Tiles [m³] [m³] [m³]
[m²] [m³]

63 yes 0.00 0.000 0.000 0.000 0.000 0.000


75 yes 0.00 0.000 0.00 0.00 0.00 0.00
90 yes 169.97 117.279 175.92 44.99 71.54 35.18
110 yes 107.87 76.588 114.88 30.67 45.19 22.98
160 yes 0.00 0.000 0.00 0.00 0.00 0.00
225 yes 0.00 0.000 0.00 0.00 0.00 0.00
250 yes 0.00 0.000 0.00 0.00 0.00 0.00
315 yes 0.00 0.000 0.00 0.00 0.00 0.00
193.87 290.80 75.67 116.73 58.16
194.00 291.00 76.00 117.00 59.00

DI Pipe - Earthwork and Road Reinstatment Calculation


Dismantling
Volume
Area Volume Volume Volume Sub
Length Backfilling
DN Sheating Concrete Excavation Bedding 0/4 Base 0/63
[m] 0/63
Tiles [m³] [m³] [m³]
[m³]
[m²]

50 yes 0.00 0.000 0.000 0.000 0.000 0.000


65 yes 0.00 0.000 0.000 0.000 0.000 0.000
80 yes 0.00 0.000 0.00 0.00 0.00 0.00
100 yes 0.00 0.000 0.00 0.00 0.00 0.00
125 yes 0.00 0.000 0.00 0.00 0.00 0.00
150 yes 0.00 0.000 0.00 0.00 0.00 0.00
200 yes 0.00 0.000 0.00 0.00 0.00 0.00
250 yes 0.00 0.000 0.00 0.00 0.00 0.00
300 yes 0.00 0.000 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00

* Excavation Depth = Total Depth - Surface Layer thickness (Concrete, Asphalt, Concrete Tiles at pavements,
** No overlapping because no cutting is necessary
alculation

Volume
Base Layer
0/32
[m³]

0.000
0.00
23.46
15.32
0.00
0.00
0.00
0.00
38.77
39.00

alculation

Volume
Base Layer
0/32
[m³]

0.000
0.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Concrete Tiles at pavements, Cobblestones)


PE Pipe - Earthwork and Road Reinstatment Calculation
Dismantling
Volume
Area Volume Volume Volume Sub
OD Sheating Length Cobblestone Excavation Bedding 0/4 Backfilling Base 0/63
[m] 0/63
s [m³] [m³] [m³]
[m²] [m³]

63 yes 0.00 0.000 0.000 0.000 0.000 0.000


75 yes 0.00 0.000 0.00 0.00 0.00 0.00
90 yes 0.00 0.000 0.00 0.00 0.00 0.00
110 yes 0.00 0.000 0.00 0.00 0.00 0.00
160 yes 0.00 0.000 0.00 0.00 0.00 0.00
225 yes 0.00 0.000 0.00 0.00 0.00 0.00
250 yes 0.00 0.000 0.00 0.00 0.00 0.00
315 yes 0.00 0.000 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00

DI Pipe - Earthwork and Road Reinstatment Calculation


Dismantling
Volume
Area Volume Volume Volume Sub
Length Backfilling
DN Sheating Cobblestone Excavation Bedding 0/4 Base 0/63
[m] 0/63
s [m³] [m³] [m³]
[m³]
[m²]

50 yes 0.00 0.000 0.000 0.000 0.000 0.000


65 yes 0.00 0.000 0.000 0.000 0.000 0.000
80 yes 0.00 0.000 0.00 0.00 0.00 0.00
100 yes 0.00 0.000 0.00 0.00 0.00 0.00
125 yes 0.00 0.000 0.00 0.00 0.00 0.00
150 yes 0.00 0.000 0.00 0.00 0.00 0.00
200 yes 0.00 0.000 0.00 0.00 0.00 0.00
250 yes 0.00 0.000 0.00 0.00 0.00 0.00
300 yes 0.00 0.000 0.00 0.00 0.00 0.00
400 yes 0.00 0.000 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00

* Excavation Depth = Total Depth - Surface Layer thickness (Concrete, Asphalt, Concrete Tiles at pavements,
** No overlapping because no cutting is necessary
Calculation

Volume
Base Layer
0/32
[m³]

0.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Calculation

Volume
Base Layer
0/32
[m³]

0.000
0.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

alt, Concrete Tiles at pavements, Cobblestones)


PE Pipe - Earthwork and Road Reinstatment Calculation
Volume Volume Volume Volume Sub Volume
Length
OD Sheating Excavation Bedding Backfilling Base Base Layer
[m]
[m³] [m³] [m³] [m³] [m³]

63 yes 986.93 981.502 235.484 416.811 196.300 130.867


75 yes 0.00 0.00 0.00 0.00 0.00 0.00
90 yes 124.15 128.50 32.86 52.25 25.70 17.13
110 yes 1449.61 1,543.83 412.20 607.24 308.77 205.84
160 yes 0.00 0.00 0.00 0.00 0.00 0.00
225 yes 536.84 664.34 214.91 210.37 132.87 88.58
250 yes 0.00 0.00 0.00 0.00 0.00 0.00
315 yes 0.00 0.00 0.00 0.00 0.00 0.00
3,318.17 895.46 1,286.68 663.63 442.42
3,319.00 896.00 1,287.00 664.00 443.00

DI Pipe - Earthwork and Road Reinstatment Calculation


Volume Volume Volume Volume Sub Volume
DN Sheating Length Excavation Bedding Backfilling Base Base Layer
[m] [m³] [m³] [m³] [m³] [m³]

50 yes 0.00 0.000 0.000 0.000 0.000 0.000


65 yes 0.00 0.000 0.000 0.000 0.000 0.000
80 yes 0.00 0.00 0.00 0.00 0.00 0.00
100 yes 0.00 0.00 0.00 0.00 0.00 0.00
125 yes 0.00 0.00 0.00 0.00 0.00 0.00
150 yes 0.00 0.00 0.00 0.00 0.00 0.00
200 yes 0.00 0.00 0.00 0.00 0.00 0.00
250 yes 0.00 0.00 0.00 0.00 0.00 0.00
300 yes 0.00 0.00 0.00 0.00 0.00 0.00
400 yes 94.02 141.03 54.00 28.21 28.21 18.80
141.03 54.00 28.21 28.21 18.80
150.00 60.00 30.00 30.00 20.00

* Excavation Depth = Total Depth - Surface Layer thickness (Concrete, Asphalt, Concrete Tiles at pavements,
alt, Concrete Tiles at pavements, Cobblestones)
Demolish of Asphalt Demolish of Dismantling Area Dismantling Area Volume
Surface Concrete Surface Concrete Tiles Cobblestones Excavation
[m²] [m²] [m²] [m²] [m³]

4,421.00 489.00 194.00 0.00 8,655.00


Volume Volume Volume Sub Volume Base Volume Binder
Volume Wearing Layer
Bedding Backfilling Base Layer Layer
[m³]
[m³] [m³] [m³] [m³] [m³]

2,431.00 3,233.00 1,736.00 1,161.00 274.00 186.00