SAUDI ARAMCO ID/PIEU -3- July-2018 - REV. 2018.04.00 (Standards Cutoff -April 30, 2018) Rev. 2018.04.

00 30-Apr-18
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
MV Cablebus Torque Testing SATR-P-3234 3-Jul-18 ELECT
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

A. TEST PROCEDURE AND CHECKLIST

Inspection shall be performed by the project approved Quality Control Schedule Q


A1 Inspector and witness point shall be coordinated with the Contractor and Att. IV
Company. Sec. 7.3

Inspect the cable bus for proper installation and freedom from surface 16-SAMSS-520
A2
defects. Sec. 9.1

Schedule Q
A3 Check the torque wrench for calibration validity
Att. IV, Sec. 7.1

16-SAMSS-520
A4 Conductors shall not be spliced.
Sec. 8.2.1.3

Cablebus sections shall be bolted utilizing splice plates with a minimum of 16-SAMSS-520
A5
four (4) bolts (two for each bus section). Sec. 8.7.1

The lock washers shall be either dished (conical) spring washers or split 16-SAMSS-520
A6
lock-washers. Sec. 8.7.1

The Vendor shall provide the recommended torque values for all fastening 16-SAMSS-520
A7
hardware. Sec. 8.7.1

Chech compression applied connectors for correct cable match and SAES-P-104
A8
identification. (NETA ATS, 2009 Sec. 7.3.2.1.4) Sec.3.2

Check that the required infor mations are marked on the compression SAES-P-104
A9
lugs. Sec.6.1

Check the bolt and hole size of termination lugs for correctness. SAES-P-104
A10
( NFPA 70, NEC 110.14) Sec.3.2

Adjust the torque wrench setting according to the busduct manufacturer 16-SAMSS-520
A11
recommended torque values. Sec. 9.2

Tinned copper two hole compression connectors shall be used to 16-SAMSS-520


A12
terminate the cables directly to equipment terminal studs or bus. Sec. 8.7.4

Tighten the bolt with the pre-adjusted torque wrench until click sound is 16-SAMSS-520
A13
heard. Sec. 9.2

16-SAMSS-520
A14 Record torque value.
Sec. 9.2

16-SAMSS-520
A15 Record the joint resistance value.
Sec. 9.2

16-SAMSS-520
A16 Permanently mark all fasteners that have been torqued.
Sec. 9.2

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU -3- July-2018 - REV. 2018.04.00 (Standards Cutoff -April 30, 2018) Rev. 2018.04.00 30-Apr-18
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
MV Cablebus Torque Testing SATR-P-3234 3-Jul-18 ELECT
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

B. TEST EQUIPMENT AND MATERIALS CRITERIA

1. Calibrated Torque Wrench

2. Digital Ohm Meter

3. The test equipment calibration cycle shall not exceed six (6) months.
Schedule Q, Att. IV, Sec. 7.1

C. TEST RESULTS

Retest
Joint No. Size of Bolts & Grade Torque Value Resistance Pass Fail Remarks
Date

Note:

1. Sketch joint connections with number.

2. Values of resistance higher than 200 micro ohms and deviations greater than +-20 percent must be investigated before passing.

D. CONCLUSIONS

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

Test results are acceptable and in accordance with Saudi Aramco Schedule Q
D1
Engineering Standards and contractual requirements. Sec. 1.3

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU -3- July-2018 - REV. 2018.04.00 (Standards Cutoff -April 30, 2018) Rev. 2018.04.00 30-Apr-18
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
MV Cablebus Torque Testing SATR-P-3234 3-Jul-18 ELECT
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
REMARKS:

REFERENCE DOCUMENTS:
1. Schedule G -- Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), Contract Specific
2. Schedule Q -- Quality Requirements (Pro Forma Contract), Contract Specific
3. SAES-P-104 -- Wiring Methods and Materials, 01 Janaury 2018
4. 16-SAMSS-520 -- Cablebus, 19 October 2008
5. NETA ATS -- Acceptance Testing Specifications for Electrical Equipment and Systems, 2009
6. NFPA 70 -- National Electrical Code (NEC), 2014 Edition

Contractor / Third-Party Saudi Aramco


Technician Performing Test* PMT Representative
Test Performed Successfully and Results are Acceptable: T&I Witnessed QC Record Reviewed Work Verified
Name, Title, Department,
Name, Initials and Date:
Company, Initials and Date:

QC Inspector PID Representative


Witnessed Test Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use

S-ar putea să vă placă și