Setting out-
Timber Pegging Installation, location
Specification
Location of New DuctBank & Valve Box
Offset Pegging (500mmfrom the boundry of the
road or pavement Installation for road and
concrete pavement
Temporary Control level Marking
Road Premix
Exacavate 650mm depth (Backhoe)
Compaction excavated of subgraded surface
(10T Roller)
Stockpile in within the area of BASF (Tipper
Truck
Lay, Spread, Level and Compact using a
backhoe and 10T Roller Innitial :
-100mm thk sub base (Sand)
-250 thk road base (Crusher run)
Lay, Spread, Level and Compact using a
backhoe and 10T Roller Final :
-200mm thk road base (Crusher run)
Spray a layer of bituminous prime coat to the
JSA-PSP REV:1
MasterList UBF Maintenance Sdn Bhd
Road Curb
leveling left and right road side
Mixing concrete using mixer
Pour the concrete along side of the road except
the concrete pavement area
manual installation precast concrete curb and
joint with cement mortar
Paint the road white and black
Concrete Pavement
Excavate 250mm depth and compaction of
excavated subgraded surface (Backhoe and T10
Roller
Stockpile for the disposed soil and tipper truck
used
Lay, Spread, Level and Compact using a
backhoe and 10T Roller :
-100mm thk sub base (Sand)
Place 0.25mm thk polysthene sheet prior
formwork installation
Install formwork bracing and support for:
- the side of concrete pavement
- constrution joint at 6m lenght as per AFC
Drawing
Place 2 layers of BRC A10 with an overlapping a
minimum of 150mm
Rebar spacer placed at the bottom and in
between of BRC Layer
Pouring ready mix concrete (grade 30) using a
45T mobile crane.
Sika joint sealant to be filled along the expansion
and constructio joint
JSA-PSP REV:1
MasterList UBF Maintenance Sdn Bhd
Barrier Gate
Excavated soil
Lay, Level and Compact using a backhoe and
10T Roller :
-150 thk road base (Crusher run)
Lif and install pre-cast footing usig a boom truck
Installed barrier gate
Backfilled the surrouding area
RC Sump
Excavate the soil for the required depth
Lay, Level and Compact using a backhoe and
10T Roller :
-150 thk road base (Crusher run)
50mm thk of lean concrete poured on the
compacted hardcore
Check the level prior RC sump installation
Lift and Install using a crane
Backfill surrouding sump area and compact it
Ecavate pipe trenching (600mm width) from th
new sump. Excavation accrosing existing road is
required
100mm diameter ows pipe layed and backfiled
done with T10 Roller
Patch up road with a a same method used in
makig new road
Duct Bank
Exacavated soil to the required depth
Lay, Level and Compact using a backhoe and
10T Roller :
-150 thk road base (Crusher run)
50mm thk of lean concrete poured on the
compacted hardcore
Installed base formwork ad rebar c/w pipe sleeve
Pour concrete grade 30 by 25T mobile crane
3 days curinng with gunny sack use
Remove sidework and backfill with existing soil
Valve Box
Excavating soil backhoe or manual with required
dept
Lay, Level and Compact using a backhoe and
10T Roller :
-150 thk road base (Crusher run)
50mm thk of lean concrete poured on the
compacted hardcore
Installed base formwork and rebar
Pour concrete grade 30 by 25T mobile crane
JSA-PSP REV:1