Sunteți pe pagina 1din 2

Prepare : CPK Doc No:

ENGINEERING CONSULTANCY
SERVICES
Review : KK REV 1

Approve : KK Sheet 1 of 2
UNLOADING ARM DATASHEET
Date :08.05.19

UNLOADING ARM DATASHEET

PROJECT
Crude Oil Unloading and Pumping Project

OWNER
Vedanta Limited
Cairn Oil & Gas

0 08.05.19 ISSUED FOR APPROVAL CPK KK KK


REV REV DATE PURPOSE PREPD REVWD APPD
Document No
UNLOADING ARM DATASHEET
Rev 1
1 CLIENT CAIRN QUANTITY: 4 Nos
2 PROJECT CRUDE OIL UNLOADING ANG PUMPING PROJECT AREA CLASSIFICATION:
3 CONTACT PERSON
4 CONTACT NO
5 E‐MAIL ADDRESS
6 ADDRESS
6 RFQ/ORDER. NO
8 REFERENCE DOC / SPECIFICATIONS
LOADING ARM DATA
1 LOADING ARM REQUIRED FOR UNLOADING CRUDE OIL FROM TANKERS
ISO CONTAINER ROAD TANKER YES RAIL WAGON DRUM
2 TYPE OF OPERATION
TOP LOADING TOP UNLOADING BOTTOM LOADING BOTTOM UNLOADING YES
3 NPS SIZE OF LOADING ARM 3"
4 MATERIAL OF CONSTRUCTION CS
5 SEAL MATERIAL
EPDM / PTFE
PROCESS PARAMETERS
1 PRODUCT / SERVICE NAME
CRUDE OIL
2 DESIGN TEMPERATURE °C 100
3 OPERATING TEMPERATURE °C 40
4 DESIGN PRESSURE kg/cm²(g) 12.5
5 OPERATING PRESSURE kg/cm²(g) ATM
6 TEST PRESSURE (HYDROTEST) kg/cm²(g) 29.5
7 ALLOWABLE PRESSURE DROP kg/cm²(g) 0.1
8 CORROSION ALLOWANCE mm 3.2
9 DENSITY kg/m³ 846
10 FLOW RATE (Normal / Design) m³/hr 26
11 VISCOSITY cp 3.55
12 HAZARDOUS AREA CLASSIFICATION ZONE 1, CLASS II A, TEMP T3
ACCESSORIES REQUIRED
1 VAPOUR RETURN LINE NO 2 HEAT TRACING NO

3 JACKETING NO
4 BALANCING SYSTEM SPRING BOX (VENDOR TO SUGGEST)
COMPRESSION SPRING PNEUMATIC HYDRAULIC GAS STRUT COUNTER WEIGHT
5 INSULATION NO 10 EMERGENCY RELEASE COUPLING YES
6 HIGH‐LEVEL SENSOR NO 11 DRAIN / VENT VALVE YES
7 GROUNDING UNIT YES 12 SPECIALITY VALVES NO
8 DRY DISCONNECT COUPLING YES 13 INLET FLANGE NPS SIZE 3" CLASS
150#
9a FILLING SENSOR NO FILLING SWITCH NO
9b POSITION SWITCHES YES PARKING SWITCH YES
Special Requirements or Notes:

INSPECTION & TESTING REQUIREMENTS


1 RADIOGRAPHY 100%
2 PENETRANT TEST
3 PAINTING SPECIFICATIONS
4 PMI

5 REMARKS OR SPECIAL COMMENTS