ONE
Two
2.1 Authorized permission No. for 1,22 km Road construction en route Intersection west of
School number 118, Khoroo 8, Khan-Uul District to hilltop for permanent operational use;
2.2 The construction was made in accordance with the Drawing and deemed possible to be used for
Road purposes for Khan-Uul district governor office and put to permanent operational use (production,
service, residential) on 20 November, 2015;
2.3 Commission requires:
Contractor to:
Transferring the original Commission Act to Put Into Operational Use and other relevant documents to
Archive and document copies to the user entity within 14 days.
Client to:
A) In accordance with user rules of construction, the Client shall diversify the private documents;
B) In accordance with user rules of construction, the Client shall maintain the construction in
continuous basis to ensure normal use.
2.4 Commission act contains 3 pages, meeting minutes contain 3 pages, commission assignment
achievement list contains 6 pages, construction documents, document lists are attached.
1,22 km Road construction en route Intersection west of School number 118, Khoroo 8, Khan-Uul
District to hilltop
COMMISSION:
Translation from Mongolian
Members:
1,22 km Road construction en route Intersection west of School number 118, Khoroo 8, Khan-Uul
District to hilltop
Subcontractor: [Stamp]
Director at “New Plan” LLC /Signature/ Dorjdagva J.
[Stamp]
Engineer at “Optic link” LLC /Signature/ Otgonbayar D.
Client:
Deputy Director at City Road Authority /Signature/ Bum-Erdene B.