Sunteți pe pagina 1din 3

 

  
   

 

You are hereby appointed as an employee of Heavy Industries Taxila Education City (HITEC) with effect
from 20, September 2010. In connection with a Contract/Agreement and its client. The following terms
and conditions shall govern your employment.

 
    

1.‘ Your contract shall commence from the date you assume your assignment, which in any case
should not be later that October 2010.
2.‘ You are on a probation period of 6 months, after that a panel of experts will analyze your
performance and accordingly decision be made.
3.‘ For the probation period it is a work from home post, during that period you will get your
projects through email and project time starts as you receive your project. A deadline date will
be mentioned in the email.
4.‘ You need to complete the project before deadline.
5.‘ Frequent physical visits be made from either side according to circumstances.
6.‘ When you submit your project you need to explain its functionality in detail, either in writing or
by physical communication.
7.‘ You are responsible for safety of any content regarding project whether physical or in softcopy
given to you.
8.‘ You will get your salary before 6th of each month.

  

Your salary, Inclusive of all cost of living allowances and other statutory allowances, enhancement,
benefits, perquisites and mandatory increments shall be the sum of Rs 8000/- per month Only for
probation period, breakdown of which is as under.

That the emolument shall be paid after any deductions required under any tax or applicable
legislation(s). you shall be personally responsible and liable for all personal income or other taxes
associated with your employment.

1.‘ åy assigning extra duties you are entitled for extra income.
2.‘ There are some projects for commercial purpose, if you take them and complete them in time,
they payment of whole project will be made to you, that is minimum Rs 20,000.

cP ag e
HEAVY INDUSTRIES TAXILA EDUCATION CITY
  ! "!# $ !% ! 
Salary Slip
Employee No 1489 &% #
Name IRFAN MUHAMMAD
Location HITEC ʹ IT Department åasic Pay: 5500
DOJ(M/D/Y) 20 Sep 2010 30% Coord. Alice
Pay Scale HPS ʹ II 25% HRA 1375
Category I 10% MA 550
åank A/c No ________ 10% CA 550
Annual Increment 10%
Misc
Rounding off 25

' % # () *+++


$ !% #!$  ,

Cable Arr Jul Aug 10


Allied Charges Other Arrear
Hostel Charges Hostel Wardon
Income Tax HCC
Ladies Club Security Refund: 20000
LWOP/Adj Misc
Langer
50% Probation Sub Total å 0
HRA ʹ (3 Month) Sub Total A 8000
Flood Donation Sub Total C 0
Misc
 # *+++
' % # () 0 -.-



As in your case leave means no work on the project for the number of days. You are entitled for 45 Days
Casual Leave. The no of days you take as leave , the dead line of the project will go onwards that number
of days. You have to take leave in written from your IT ʹ Manager.

& 
 

You shall be entitled to gratuity to 30 days basic salary for every completed year of service on separation
on any ground, other than misconduct.

.    

1.‘ You shall be required to furnish two references of persons not related to you. Your confirmation
shall be subject to our receiving satisfactory antecedent verification.
2.‘ You shall be required to perform duties as assigned by you IT Manager.

ÄP ag e
HEAVY INDUSTRIES TAXILA EDUCATION CITY
3.‘ Your contract responsibilities or duties may be changed from time to time by the company the
company, as it may deem necessary.
4.‘ During the period of job your services are liable to be transferred to any department of HITEC.

    /.

Your contract can be terminated by the company in any of the following events:

1.‘ If in organization͛s opinion, which shall be final and binding in this matter, you are found guilty
of dishonesty, misconduct, disorderly behavior, negligence, indiscipline, insubordination,
absence from duty without permission, or having acted in a manner adversely prejudicial to the
interests of the company, or of any conduct which violates one or more terms of this letter,
your services shall be liable to be terminated forthwith without any notice before completion of
the contractual assignment.

Please sign the copy of this letter as token of acceptance to the terms and conditions as mentioned
above.

011 2!
Head of IT Department
Senior Software Engineer
HITEC

I agree to the terms and conditions stated above & sign a duplicate copy in token of my acceptance.

Date: 20 Sep 2010 Signature

Name:

ÿP ag e
HEAVY INDUSTRIES TAXILA EDUCATION CITY

S-ar putea să vă placă și