Main Contractor: Thabat Construction Company Description of works: Erection, installation and finishing works of

prefabricated porta cabin units


Sub-Contractor: Location of works: MS Reference
RA made by: Signature: Date:
RA reviewed by: Signature: Date:

Activities (check all that apply) Risk assessment


(before controls)

Who affected Hazards

Risk factor
Likelihood
Risk

Severity
level

* Interaction with other vehicles. * Segregation and co


* Poor planning.
* Lack of knowledge of site conditions and regulations. * Assure all t
* Unskilled personnel. Covid 19 pendimic * All personnel prior t

Mobilisation of light vehicles and manpower. People, Equipment, * All personnel shall m
2 4 8 M provided- wearing
Site preparation, access and egress Reputation
distance- controlling

* Crane travelling over unprepared or uneven ground.


* Possible damage to ground surface, crane or
property.

* Collisions.
* Dropped objects.
* Crush/struck by objects.
* Damage of property. * Rigg

Traffic Management & Use of heavy Vehicles at People, Equipment, M


3 3 9
site during construction Reputation
* Follow the traffic ma
* Site map of monitorin
Fire * Make sure that all dr
Traffic Management & Use of heavy Vehicles at People, Equipment, M
3 3 9 • Road diversion are p
site during construction Reputation provide fire blanket , d

* Ensure area

* Lack of segregation of people from vehicles.

* Check the loading ca


* Overloaded vehicle w
* Overloaded vehicles. • Maximum 1 cabin is

* Unauthorized drivers, vehicles and or equipment. * List of drivers and c


* Crane positioned incorrectly for required lift.
* Possible damage to crane or property during set up or de- * Ground floor cabins
* Crane operation, causing rig procedure.
damage to property or injury to
Crane Positioning Set up Procedure De- * Only trained, certifie
People, Equipment, * Drop of suspended load personnel.
due to failure of lifting equipment
rig Procedure 4 4 16 H * Daily inspection o
Reputation during operation.
* Ground collapse beneath outriggers causing possible
Lifting and positioning the cabins * Make sure the cra
overturning.
• Lack of supervision. * Lift supervisor shall
* Adverse Weather Conditions.
with drill bits, trip hazards from trailing cables, eye hazards
* Manual Handling: Lifting toovibration,
heavy loads, 4 3 12 M
Floor levelling and finishes Ceiling works from flying particles, Hand-Arm dust poor posture
generation and
during lifting, difficult loads to carry, dropping loads, muscular 4 3 12 M
Windows & Doors fixing Roof works People, Equipment * Usesprains,
of HandbackTools: Cuts, dropped
injuries, objects,
hernia, cuts, struck by
cramps.
Plumbing, drainage and sanitary fittings 4 3 12 M
objects.
* Falling from heights. 4 3 12 M
Housekeeping People * Slip, trip & fall Hazards. 3 3 9 M
Special consideration in summer People Environmental temperatures (hot and humid) 2 4 8 M
Risk factor method * All people to atten
Severity 1 - No potential for injury, illness, or incident.
Risk level 2 - Potential for minor injury, illness, or incident.
3 - Potential for a recordable injury, illness, or incident.
4 - Potential for major incident, or major injury or illness causing short term disability.
5 - Potential for major incident, or major injury or illness causing a fatality or long term disability.

1 2 3 4 5
2 4 6 8 10
3 6 9 12 15
4 8 12 16 20
5 10 15 20 25
Low
Medium
High
RA Reference:

eference
e: April 30th 2020

Controls to be implemented (mitigation Risk assessment


measures) (after controls)

Risk factor
Likelihood
Risk

Severity
level

* Segregation and control of vehicles and pedestrians will be done as per the procedure/traffic
management plan.
* Assure all the work permits are obtained and approved prior to mobilization.
* All personnel prior to entering the site shall receive safety induction and attend daily tool box
meeting.
* Appropriate and adequate PPE must be worn.
* All personnel shall meet the minimum qualifications required for the job. safety induction to be
provided- wearing full PPE- sanitizing the area- wearing mask and golves- keeping 1 m 2 1 2 L
distance- controlling the body temperature of the employees before starting work and after.

* Maintain the site driving speed.


* Adhere to the traffic management plan.
* Secure loads on trucks with chains.
* Rigger & Banks man shall control movements of trailer/ crane.
* Appropriate and adequate PPE must be worn.
* Use of headlight and beacon lights at site.

3 1 3 L
* Follow the traffic management plan.
* Site map of monitoring scheme for movement of vehicles at site.
* Make sure that all drivers are aware of site traffic rules and the traffic management plan.
3 1 3 L
• Road diversion are properly planned and communicated to all. provide fire extinguisher,
provide fire blanket , driver to be trained on fire extinguisher

* Ensure area around the lifting operation is barricaded from unauthorized entry.
* Safety signs posted.
• Ensure segregation of pedestrian and vehicles.
* Use barriers between pedestrian & vehicles.
* Demarcation of designated walkways.

* Check the loading capacity of the trucks and ensure that vehicle is not overloaded.
* Overloaded vehicle will not be allowed to access site.
• Maximum 1 cabin is allowed per truck.

* List of drivers and copy of driver's licenses should be provided to Site HSE manager prior to
* Foundations shall be start the job.
placed over PCC using crane.
* Ground floor cabins* shall be lifted from the trailer
Manufacturer’s instructions adhered with the to
help of mobile
at all times. crane placed on the
* Only trained, certified and competent personnel to operate and assist with rigging. No one but
* Daily inspection of the lift associated personnel
lifting equipment and within
crane crane set up competent
by qualified, area. and authorized 4 1 4 L
person.
* Make sure the crane is positioned on solid level ground and the outriggers and spreader
* Lift supervisor shall be available to plates arethe
inspect fully deployed.
lifting shackles, slings, webbing slings, hub lot,
* Weather reports obtained before etc. and during lifting operations.
* Crane
* Conduct operator to monitor
Toolbox Talks priorwindtospeed equipment.
start any work. 4 1 4 L
* Select double insulated tools.
* Avoid manual handling so far as reasonably practicable. 4 1 4 L
* Conduct * Use mechanical
Toolbox handling
Talks prior aids.
to start any work. 4 1 4 L
** Workers
Conduct to be trained
Toolbox Talks forprior
the use of hand
to start tools.
any work. 4 1 4 L
* Perform and* Provide
maintainfull body
good fall arrest system
housekeeping at site(harness).
and inside the cabins. 3 1 3 L
* Handle waste disposal
* Conduct Toolboxproperly
Talks prior as per the legal
to start procedure.
any work. 2 1 2 L
* All people
Likelihood to attend heat stress training (identify symptoms, urine test, safe work practices, Notes
1 - Very Unlikely 2 - Unlikely
3 - Likely
4 - Very Likely 5 - Certain