Documente Academic
Documente Profesional
Documente Cultură
Risk factor
Likelihood
Risk
Severity
level
Mobilisation of light vehicles and manpower. People, Equipment, * All personnel shall m
2 4 8 M provided- wearing
Site preparation, access and egress Reputation
distance- controlling
* Collisions.
* Dropped objects.
* Crush/struck by objects.
* Damage of property. * Rigg
* Ensure area
1 2 3 4 5
2 4 6 8 10
3 6 9 12 15
4 8 12 16 20
5 10 15 20 25
Low
Medium
High
RA Reference:
eference
e: April 30th 2020
Risk factor
Likelihood
Risk
Severity
level
* Segregation and control of vehicles and pedestrians will be done as per the procedure/traffic
management plan.
* Assure all the work permits are obtained and approved prior to mobilization.
* All personnel prior to entering the site shall receive safety induction and attend daily tool box
meeting.
* Appropriate and adequate PPE must be worn.
* All personnel shall meet the minimum qualifications required for the job. safety induction to be
provided- wearing full PPE- sanitizing the area- wearing mask and golves- keeping 1 m 2 1 2 L
distance- controlling the body temperature of the employees before starting work and after.
3 1 3 L
* Follow the traffic management plan.
* Site map of monitoring scheme for movement of vehicles at site.
* Make sure that all drivers are aware of site traffic rules and the traffic management plan.
3 1 3 L
• Road diversion are properly planned and communicated to all. provide fire extinguisher,
provide fire blanket , driver to be trained on fire extinguisher
* Ensure area around the lifting operation is barricaded from unauthorized entry.
* Safety signs posted.
• Ensure segregation of pedestrian and vehicles.
* Use barriers between pedestrian & vehicles.
* Demarcation of designated walkways.
* Check the loading capacity of the trucks and ensure that vehicle is not overloaded.
* Overloaded vehicle will not be allowed to access site.
• Maximum 1 cabin is allowed per truck.
* List of drivers and copy of driver's licenses should be provided to Site HSE manager prior to
* Foundations shall be start the job.
placed over PCC using crane.
* Ground floor cabins* shall be lifted from the trailer
Manufacturer’s instructions adhered with the to
help of mobile
at all times. crane placed on the
* Only trained, certified and competent personnel to operate and assist with rigging. No one but
* Daily inspection of the lift associated personnel
lifting equipment and within
crane crane set up competent
by qualified, area. and authorized 4 1 4 L
person.
* Make sure the crane is positioned on solid level ground and the outriggers and spreader
* Lift supervisor shall be available to plates arethe
inspect fully deployed.
lifting shackles, slings, webbing slings, hub lot,
* Weather reports obtained before etc. and during lifting operations.
* Crane
* Conduct operator to monitor
Toolbox Talks priorwindtospeed equipment.
start any work. 4 1 4 L
* Select double insulated tools.
* Avoid manual handling so far as reasonably practicable. 4 1 4 L
* Conduct * Use mechanical
Toolbox handling
Talks prior aids.
to start any work. 4 1 4 L
** Workers
Conduct to be trained
Toolbox Talks forprior
the use of hand
to start tools.
any work. 4 1 4 L
* Perform and* Provide
maintainfull body
good fall arrest system
housekeeping at site(harness).
and inside the cabins. 3 1 3 L
* Handle waste disposal
* Conduct Toolboxproperly
Talks prior as per the legal
to start procedure.
any work. 2 1 2 L
* All people
Likelihood to attend heat stress training (identify symptoms, urine test, safe work practices, Notes
1 - Very Unlikely 2 - Unlikely
3 - Likely
4 - Very Likely 5 - Certain