Sunteți pe pagina 1din 13

ITTO Guide

Integration Management

Process Description Process Group Inputs Tools & Techniques Outputs

Develop Project Develop a Initiating 1. Business documents 1. Expert judgment 1. Project charter
Charter document that 1. Business case 2. Data gathering 2. Assumption log
formally authorizes 2. Benefits management plan 1. Brainstorming
the existence of a 2. Agreements 2. Focus groups
project and 3. EEF 3. Interviews
provides the PM 4. OPA 3. Interpersonal and team skills
with the authority to 1. Conflict management
apply organizational 2. Facilitation
resources to project 3. Meeting management
activities. 4. Meetings
Develop Project Define, prepare, Planning 1. Project charter 1. Expert judgment 1. Project management plan
Management Plan and coordinate all 2. Outputs from other processes 2. Data gathering
plan components 3. EEF 1. Brainstorming
and consolidate 4. OPA 2. Checklists
them into an 3. Focus groups
integrated project 4. Interviews
management plan. 3. Interpersonal and team skills
1. Conflict management
2. Facilitation
3. Meeting management
4. Meetings

Direct and Manage Lead and perform Executing 1. Project management plan 1. Expert judgment 1. Deliverables
Project Work the work defined in 1. Any component 2. PMIS 2. Work performance data
the project 2. Project documents 3. Meetings 3. Issue log
management plan 1. Change log 4. Change requests
and implementing 2. Lessons learned register 5. Project management plan
approved changes 3. Milestone list updates
to achieve the 4. Project communications 1. Any component
project's objectives 5. Project schedule 6. Project documents updates
6. Requirements traceability 1. Activity list
matrix 2. Assumption log
7. Risk register 3. Lessons learned register
8. Risk report 4. Requirements
3. Approved change requests documentation
4. EEF 5. Risk register
5. OPA 6. Stakeholder register
7. OPA updates

Manage Project Use existing Executing 1. Project management plan 1. Expert judgment 1. Lessons learned register
Knowledge knowledge and 1. Any components 2. Knowledge management 2. Project management plan
creating new 2. Project documents 3. Information management updates
knowledge to 1. Lessons learned register 4. Interpersonal and team skills 1. Any component
achieve the 2. Project team assignments 1. Active listening 3. Organizational process
project's objectives 3. Resource breakdown 2. Facilitation assets updates
and contribute to structure 3. Leadership
organizational 4. Source selection criteria 4. Networking
learning 5. Stakeholder register 5. Political awareness
3. Deliverables
4. EEF
5. OPA
Monitor and Track, review, and Monitoring and 1. Project management plan 1. Expert judgment 1. Work performance reports
Control Project report the overall Controlling 1. Any component 2. Data analysis 2. Change requests
Work progress to meet 2. Project documents 1. Alternatives analysis 3. Project management plan
the performance 1. Assumption log 2. Cost-benefit analysis updates
objectives defined 2. Basis of estimates 3. Earned value analysis 1. Any component
in the project 3. Cost forecasts 4. Root cause analysis 4. Project documents updates
management plan 4. Issue log 5. Trend analysis 1. Cost forecasts
5. Lessons learned register 6. Variance analysis 2. Issue log
6. Milestone list 3. Decision making 3. Lessons learned register
7. Quality reports 4. Meetings 4. Risk register
8. Risk register 5. Schedule forecasts
9. Risk report
10. Schedule forecasts
3. Work performance information
4. Agreements
5. EEF
6. OPA

1
Integration Management

Perform Integrated Review all change Monitoring and 1. Project management plan 1. Expert judgment 1. Approved change requests
Change Control requests; approve Controlling 1. Change management plan 2. Change control tools 2. Project management plan
changes and 2. Configuration management 3. Data analysis updates
manage changes to plan 1. Alternatives analysis 1. Any component
deliverables, project 3. Scope baseline 2. Cost-benefit analysis 3. Project documents updates
documents, and the 4. Schedule baseline 4. Decision making 1. Change log
project 5. Cost baseline 1. Voting
management plan 2. Project documents 2. Autocratic decision
1. Basis of estimates making
2. Requirements traceability 3. Multi criteria decision
matrix analysis
3. Risk report 5. Meetings
3. Work performance reports
4. Change requests
5. EEF
6. OPA

Close Project or Finalize all activities Closing 1. Project charter 1. Expert judgment 1. Project documents updates
Phase for the project, 2. Project management plan 2. Data analysis 1. Lessons learned register
phase, or contract 1. All components 1. Document analysis 2. Final product, service, or
3. Project documents 2. Regression analysis result transition
1. Assumption log 3. Trend analysis 3. Final report
2. Basis of estimates 4. Variance analysis 4. OPA updates
3. Change log 3. Meetings
4. Issue log
5. Lessons learned register
6. Milestone list
7. Project communications
8. Quality control
measurements
9. Quality reports
10. Requirements
documentation
11. Risk register
12. Risk report
4. Accepted deliverables
5. Business documents
1. Business case
2. Benefits management plan
6. Agreements
7. Procurement documentation
8. OPA

2
Scope Management

Process Description Process Group Inputs Tools & Techniques Outputs

Plan Scope Create a scope Planning 1. Project charter 1. Expert judgment 1. Scope management plan
Management management plan 2. Project management plan 2. Data analysis 2. Requirements management plan
that documents how 1. Quality management 1. Alternatives analysis
the project and plan 3. Meetings
product scope will 2. Project life cycle
be defined, description
validated, and 3. Development approach
controlled. 3. EEF
4. OPA

Collect Determine, Planning 1. Project charter 1. Expert judgment 1. Requirements documentation


Requirements document, and 2. Project management plan 2. Data gathering 2. Requirements traceability matrix
manage 1. Scope management plan 1. Brainstorming
stakeholder needs 2. Requirements mgmt plan 2. Interviews
and requirements to 3. Stakeholder engagement 3. Focus groups
meet objectives plan 4. Questionnaires and surveys
3. Project documents 5. Benchmarking
1. Assumption log 3. Data analysis
2. Lessons learned register 1. Document analysis
3. Stakeholder register 4. Decision making
4. Business documents 1. Voting
1. Business case 2. Multicriteria decision analysis
5. Agreements 5. Data representation
6. EEF 1. Affinity diagrams
7. OPA 2. Mind mapping
6. Interpersonal and team skills
1. Nominal group technique
2. Observation/conversation
3. Facilitation
7. Context diagram
8. Prototypes

Define Scope Develop a detailed Planning 1. Project charter 1. Expert judgment 1. Project scope statement
description of the 2. Project mgmt plan 2. Data analysis 2. Project documents updates
project and product 1. Scope mgmt plan 1. Alternatives analysis 1. Assumption log
3. Project documents 3. Decision making 2. Requirements
1. Assumption log 1. Multicriteria decision analysis documentation
2. Requirements 4. Interpersonal and team skills 3. Requirements traceability
documentation 1. Facilitation matrix
3. Risk register 5. Product analysis 4. Stakeholder register
4. EEF
5. OPA

Create WBS Subdivide project Planning 1. Project mgmt plan 1. Expert judgment 1. Scope baseline
deliverables and 1. Scope mgmt plan 2. Decomposition 2. Project documents updates
project work into 2. Project documents 1. Assumption log
smaller, more 1. Project scope statement 2. Requirements
manageable 2. Requirements documentation
components documentation
3. EEF
4. OPA

Validate Scope Formalize Monitoring & 1. Project mgmt plan 1. Inspection 1. Accepted deliverables
acceptance of the Controlling 1. Scope mgmt plan 2. Decision making 2. Work performance information
completed project 2. Requirements mgmt plan 1. Voting 3. Change requests
deliverables 3. Scope baseline 4. Project documents updates
2. Project documents 1. Lessons learned register
1. Lessons learned register 2. Requirements
2. Quality reports documentation
3. Requirements 3. Requirements traceability
documentation matrix
4. Requirements traceability
matrix
3. Verified deliverables
4. Work performance data

Control Scope Monitor the status Monitoring & 1. Project mgmt plan 1. Data analysis 1. Work performance information
of the project and Controlling 1. Scope mgmt plan 1. Variance analysis 2. Change requests
product scope and 2. Requirements mgmt plan 2. Trend analysis 3. Project management plan
manage changes to 3. Change mgmt plan updates
the scope baseline 4. Configuration mgmt plan 1. Scope management plan
5. Scope baseline 2. Scope baseline
6. Performance 3. Schedule baseline
measurement baseline 4. Cost baseline
2. Project documents 5. Performance measurement
1. Lessons learned register baseline
2. Requirements 4. Project documents updates
documentation 1. Lessons learned register
3. Requirements traceability 2. Requirements
matrix documentation
3. Work performance data 3. Requirements traceability
4. OPA matrix

1
Schedule Management

Process Description Process Group Inputs Tools & Techniques Outputs

Plan Schedule Establish the policies, Planning 1. Project charter 1. Expert judgment 1. Schedule management plan
Management procedures, and 2. Project management plan 2. Data analysis
documentation for 1. Scope management plan 3. Meetings
planning, developing, 2. Development approach
managing, executing, and 3. EEF
controlling the project 4. OPA
schedule

Define Activities Identify and document the Planning 1. Project management plan 1. Expert judgment 1. Activity list
specific actions to be 1. Schedule management plan 2. Decomposition 2. Activity attributes
performed to produce the 2. Scope baseline 3. Rolling wave planning 3. Milestone list
project deliverables 2. EEF 4. Meetings 4. Change requests
3. OPA 5. Project management plan updates
1. Schedule baseline
2. Cost baseline

Sequence Identify and document Planning 1. Project management plan 1. Precedence diagramming 1. Project schedule network diagrams
Activities relationships among the 1. Schedule management plan method 2. Project documents updates
project activities 2. Scope baseline 2. Dependency determination and 1. Activity attributes
2. Project documents integration 2. Activity list
1. Activity attributes 3. Leads and lags 3. Assumption log
2. Activity list 4. PMIS 4. Milestone list
3. Assumption log
4. Milestone list
3. EEF
4. OPA

Estimate Activity Estimate the number of Planning 1. Project management plan 1. Expert judgment 1. Duration estimates
Durations work periods needed to 1. Schedule management plan 2. Analogous estimating 2. Basis of estimates
complete individual 2. Scope baseline 3. Parametric estimating 3. Project documents updates
activities with estimated 2. Project documents 4. Three-point estimating 1. Activity attributes
resources 1. Activity attributes 5. Bottom-up estimating 2. Assumption log
2. Activity list 6. Data analysis 3. Lessons learned register
3. Assumption log 1. Alternatives analysis
4. Lessons learned register 2. Reserve analysis
5. Milestone list 7. Decision making
6. Project team assignments 8. Meetings
7. Resource breakdown
structure
8. Resource calendars
9. Resource requirements
10. Risk register
3. EEF
4. OPA

Develop Schedule Analyze activity Planning 1. Project management plan 1. Schedule network analysis 1. Schedule baseline
sequences, durations, 1. Schedule management plan 2. Critical path method 2. Project schedule
resource requirements, 2. Scope baseline 3. Resource optimization 3. Schedule data
and schedule constraints to 2. Project documents 4. Data analysis 4. Project calendars
create a schedule model 1. Activity attributes 1. What-if scenario analysis 5. Change requests
for project execution and 2. Activity list 2. Simulation 6. Project management plan updates
monitoring and controlling 3. Assumption log 5. Leads and lags 1. Schedule management plan
4. Basis of estimates 6. Schedule compression 2. Cost baseline
5. Duration estimates 7. PMIS 7. Project documents updates
6. Lessons learned register 8. Agile release planning 1. Activity attributes
7. Milestone list 2. Assumption log
8. Project schedule network 3. Duration estimates
diagrams 4. Lessons learned register
9. Project team assignments 5. Resource requirements
10. Resource calendars 6. Risk register
11. Resource requirements
12. Risk register
3. Agreements
4. EEF
5. OPA

Control Schedule Monitor the status of the Monitoring & 1. Project management plan 1. Data analysis 1. Work performance information
project to update the Controlling 1. Schedule management plan 1. Earned value analysis 2. Schedule forecasts
project schedule and 2. Schedule baseline 2. Iteration burndown chart 3. Change requests
manage changes to the 3. Scope baseline 3. Performance reviews 4. Project management plan updates
schedule baseline 4. Performance measurement 4. Trend analysis 1. Schedule management plan
baseline 5. Variance analysis 2. Schedule baseline
2. Project documents 6. What-if scenario analysis 3. Cost baseline
1. Lessons learned register 2. Critical path method 4. Performance measurement
2. Project calendars 3. PMIS baseline
3. Project schedule 4. Resource optimization 5. Project documents updates
4. Resource calendars 5. Leads and lags 1. Assumption log
5. Schedule data 6. Schedule comparession 2. Basis of estimates
3. Work performance data 3. Lessons learned register
4. OPA 4. Project schedule
5. Resource calendars
6. Risk register
7. Schedule data

1
Cost Management

Process Description Process Group Inputs Tools & Techniques Outputs

Plan Cost Define how the Planning 1. Project charter 1. Expert judgment 1. Cost management plan
Management project costs will be 2. Project management plan 2. Data analysis
estimated, 1. Schedule management 3. Meetings
budgeted, plan
managed, 2. Risk management plan
monitored, and 3. EEF
controlled 4. OPA

Estimate Costs Develop an Planning 1. Project management plan 1. Expert judgment 1. Cost estimates
approximation of 1. Cost management plan 2. Analogous estimating 2. Basis of estimates
the cost of 2. Quality management plan 3. Parametric estimating 3. Project documents updates
resources needed 3. Scope baseline 4. Bottom-up estimating 1. Assumption log
to complete project 2. Project documents 5. Three-point estimating 2. Lessons learned register
work 1. Lessons learned register 6. Data analysis 3. Risk register
2. Project schedule 1. Alternatives analysis
3. Resource requirements 2. Reserve analysis
4. Risk register 3. Cost of quality
3. EEF 7. PMIS
4. OPA 8. Decision making
1. Voting

Determine Budget Aggregate the Planning 1. Project management plan 1. Expert judgment 1. Cost baseline
estimated costs of 1. Cost management plan 2. Cost aggregation 2. Project funding requirements
individual activities 2. Resource mgmt plan 3. Data analysis 3. Project documents updates
or work packages to 3. Scope baseline 1. Reserve analysis 1. Cost estimates
establish an 2. Project documents 4. Historical information 2. Project schedule
authorized cost 1. Basis of estimates review 3. Risk register
baseline 2. Cost estimates 5. Funding limit reconciliation
3. Project schedule 6. Financing
4. Risk register
3. Business documents
1. Business case
2. Benefits management plan
4. Agreements
5. EEF
6. OPA

Control Costs Monitor the status Monitoring & 1. Project management plan 1. Expert judgment 1. Work performance information
of the project to Controlling 1. Cost management plan 2. Data analysis 2. Cost forecasts
update the project 2. Cost baseline 1. Earned value analysis 3. Change requests
costs and manage 3. Performance measurement 2. Variance analysis 4. Project management plan updates
changes to the cost baseline 3. Trend analysis 1. Cost mgmt plan
baseline 2. Project documents 4. Reserve analysis 2. Cost baseline
1. Lessons learned register 3. To-complete performance 3. Performance measurement
3. Project funding requirements index baseline
4. Work performance data 4. PMIS 5. Project documents updates
5. OPA 1. Assumption log
2. Basis of estimates
3. Cost estimates
4. Lessons learned register
5. Risk register

1
Quality Management

Process Description Process Group Inputs Tools & Techniques Outputs

Plan Quality Identify quality Planning 1. Project charter 1. Expert judgment 1. Quality management plan
Management requirements and/or 2. Project management plan 2. Data gathering 2. Quality metrics
standards for the project 1. Requirements mgmt plan 1. Benchmarking 3. Project management plan
and its deliverables, and 2. Risk mgmt plan 2. Brainstorming updates
document how the project 3. Stakeholder engagement 3. Interviews 1. Risk mgmt plan
will demonstrate plan 3. Data analysis 2. Scope baseline
compliance with quality 4. Scope baseline 1. Cost-benefit analysis 4. Project documents updates
requirements and/or 3. Project documents 2. Cost of quality 1. Lessons learned register
standards 1. Assumption log 4. Decision making 2. Requirements traceability
2. Requirements 1. Multicriteria decision matrix
documentation analysis 3. Risk register
3. Requirements traceability 5. Data representation 4. Stakeholder register
matrix 1. Flowcharts
4. Risk register 2. Logical data model
5. Stakeholder register 3. Matrix diagrams
4. EEF 4. Mind mapping
5. OPA 6. Test and inspection planning
7. Meetings

Manage Quality Translate the quality Executing 1. Project management plan 1. Data gathering 1. Quality reports
management plan into 1. Quality management plan 1. Checklists 2. Test and evaluation documents
executable quality 2. Project documents 2. Data analysis 3. Change requests
activities that incorporate 1. Lessons learned register 1. Alternatives analysis 4. Project management plan
the organization’s quality 2. Quality control 2. Document analysis updates
policies into the project measurements 3. Process analysis 1. Quality management plan
3. Quality metrics 4. Root cause analysis 2. Scope baseline
4. Risk report 3. Decision making 3. Schedule baseline
3. OPA 1. Multicriteria decision 4. Cost baseline
analysis 5. Project documents updates
4. Data representation 1. Issue log
1. Affinity diagrams 2. Lessons learned register
2. Cause-and-effect diagrams 3. Risk register
3. Flowcharts
4. Histograms
5. Matrix diagrams
6. Scatter diagrams
5. Audits
6. Design for X
7. Problem solving
8. Quality improvement methods

Control Quality Monitor and record Monitoring & 1. Project management plan 1. Data gathering 1. Quality control measurements
results from executing the Controlling 1. Quality mgmt plan 1. Checklists 2. Verified deliverables
quality management 2. Project documents 2. Check sheets 3. Work performance information
activities in order to 1. Lessons learned register 3. Statistical sampling 4. Change requests
assess performance and 2. Quality metrics 4. Questionnaires and surveys 5. Project management plan
ensure the project 3. Test and evaluation 2. Data analysis updates
outputs are complete, documents 1. Performance reviews 1. Quality mgmt plan
correct, and meet 3. Approved change requests 2. Root cause analysis 6. Project documents updates
customer expectations 4. Deliverables 3. Inspection 1. Issue log
5. Work performance data 4. Testing/product evaluations 2. Lessons learned register
6. EEF 5. Data representation 3. Risk register
7. OPA 1. Cause-and-effect diagrams 4. Test and evaluation
2. Control charts documents
3. Histogram
4. Scatter diagrams
6. Meetings

1
Resource Management

Process Description Process Group Inputs Tools & Techniques Outputs

Plan Resource Define how to Planning 1. Project charter 1. Expert judgment 1. Resource management plan
Management estimate, acquire, 2. Project mgmt plan 2. Data representation 2. Team charter
manage, and use 1. Quality mgmt plan 1. Hierarchical charts 3. Project documents updates
team and physical 2. Scope baseline 2. Responsibility 1. Assumption log
resources 3. Project documents assignment matrix 2. Risk register
1. Project schedule 3. Text-oriented formats
2. Requirements 3. Organizational theory
documentation 4. Meetings
3. Risk register
4. Stakeholder register
4. EEF
5. OPA

Estimate Activity Estimate team Planning 1. Project management plan 1. Expert judgment 1. Resource requirements
Resources resources and the 1. Resource management 2. Bottom-up estimating 2. Basis of estimates
type and quantities plan 3. Analogous estimating 3. RBS
of materials, 2. Scope baseline 4. Parametric estimating 4. Project docs updates
equipment, and 2. Project documents 5. Data analysis 1. Activity attributes
supplies necessary 1. Activity attributes 1. Alternatives analysis 2. Assumption log
to perform project 2. Activity list 6. PMIS 3. Lessons learned register
work 3. Assumption log 7. Meetings
4. Cost estimates
5. Resource calendars
6. Risk register
3. EEF
4. OPA

Acquire Obtain team Executing 1. Project management plan 1. Decision making 1. Physical resource
Resources members, facilities, 1. Resource mgmt plan 1. Multicriteria decision assignments
equipment, 2. Procurement mgmt plan analysis 2. Project team assignments
materials, supplies, 3. Cost baseline 2. Interpersonal and team skills 3. Resource calendars
and other resources 2. Project documents 1. Negotiation 4. Change requests
necessary to 1. Project schedule 3. Pre-assignment 5. Project mgmt plan updates
complete project 2. Resource calendars 4. Virtual teams 1. Resource mgmt plan
work 3. Resource requirements 2. Cost baseline
4. Stakeholder register 6. Project docs updates
3. EEF 1. Lessons learned register
4. OPA 2. Project schedule
3. RBS
4. Resource requirements
5. Risk register
6. Stakeholder register
7. EEF updates
8. OPA updates

Develop Team Improve Executing 1. Project mgmt plan 1. Colocation 1. Team performance
competencies, team 1. Resource mgmt plan 2. Virtual teams assessments
member interaction, 2. Project documents 3. Communication technology 2. Change requests
and the overall 1. Lessons learned register 4. Interpersonal and team skills 3. Project mgmt plan updates
team environment 2. Project schedule 1. Conflict management 1. Resource mgmt plan
to enhance project 3. Project team 2. Influencing 4. Project docs updates
performance assignments 3. Motivation 1. Lessons learned register
4. Resource calendars 4. Negotiation 2. Project schedule
5. Team charter 5. Team building 3. Project team
3. EEF 5. Recognition and rewards assignments
4. OPA 6. Training 4. Resource calendars
7. Individual and team 5. Team charter
assessments 5. EEF updates
8. Meetings 6. OPA updates

Manage Team Track team member Executing 1. Project management plan 1. Interpersonal and team skills 1. Change requests
performance, 1. Resource mgmt plan 1. Conflict management 2. Project management plan
provide feedback, 2. Project documents 2. Decision making updates
resolve issues, and 1. Issue log 3. Emotional intelligence 1. Resource management
manage team 2. Lessons learned register 4. Influencing plan
changes to optimize 3. Project team 5. Leadership 2. Schedule baseline
project performance assignments 2. PMIS 3. Cost baseline
4. Team charter 3. Project docs updates
3. Work performance reports 1. Issue log
4. Team performance 2. Lessons learned register
assessments 3. Project team
5. EEF assignments
6. OPA 4. EEF updates

1
Resource Management

Control Resources Ensure that the Monitoring & 1. Project management plan 1. Data analysis 1. Work performance
physical resources Controlling 1. Resource mgmt plan 1. Alternatives analysis information
assigned and 2. Project documents 2. Cost-benefit analysis 2. Change requests
allocated to the 1. Issue log 3. Performance reviews 3. Project mgmt plan updates
project are available 2. Lessons learned register 4. Trend analysis 1. Resource mgmt plan
as planned, as well 3. Physical resource 2. Problem solving 2. Schedule baseline
as monitoring the assignments 3. Interpersonal and team skills 3. Cost baseline
planned versus 4. Project schedule 1. Negotiation 4. Project docs updates
actual utilization of 5. RBS 2. Influencing 1. Assumption log
resources and 6. Resource requirements 4. PMIS 2. Issue log
taking corrective 7. Risk register 3. Lessons learned register
action as necessary 3. Work performance data 4. Physical resource
4. Agreements assignments
5. OPA 5. RBS
6. Risk register

2
Communications Management

Process Description Process Group Inputs Tools & Techniques Outputs

Plan Develop an appropriate Planning 1. Project charter 1. Expert judgment 1. Communications


Communications approach and plan for 2. Project mgmt plan 2. Communication management plan
Management project communications 1. Resource mgmt plan requirements analysis 2. Project mgmt plan
activities based on the 2. Stakeholder 3. Communication technology updates
information needs of each engagement plan 4. Communication models 1. Stakeholder
stakeholder or group, 3. Project documents 5. Communication methods engagement plan
available organizational 1. Requirements 6. Interpersonal and team 3. Project docs updates
assets, and the needs of documentation skills 1. Project schedule
the project 2. Stakeholder register 1. Communication styles 2. Stakeholder register
4. EEF assessment
5. OPA 2. Political awareness
3. Cultural awareness
7. Data representation
1. Stakeholder
engagement
assessment matrix
8. Meetings

Manage Ensure timely and Executing 1. Project management plan 1. Communication technology 1. Project communications
Communications appropriate collection, 1. Resource mgmt plan 2. Communication methods 2. Project management
creation, distribution, 2. Communications 3. Communication skills plan updates
storage, retrieval, mgmt plan 1. Communication 1. Communications
management, monitoring, 3. Stakeholder competence management plan
and the ultimate disposition engagement plan 2. Feedback 2. Stakeholder
of project information 2. Project documents 3. Nonverbal engagement plan
1. Change log 4. Presentations 3. Project documents
2. Issue log 4. PMIS updates
3. Lessons learned 5. Project reporting 1. Issue log
register 6. Interpersonal and team 2. Lessons learned
4. Quality report skills register
5. Risk report 1. Active listening 3. Project schedule
6. Stakeholder register 2. Conflict management 4. Risk register
3. Work performance reports 3. Cultural awareness 5. Stakeholder register
4. EEF 4. Meeting management 4. OPA updates
5. OPA 5. Networking
6. Political awareness
7. Meetings
Monitor Ensure the information Monitoring & 1. Project management plan 1. Expert judgment 1. Work performance
Communications needs of the project and its Controlling 1. Resource mgmt plan 2. PMIS information
stakeholders are met 2. Communications 3. Data analysis 2. Change requests
mgmt plan 1. Stakeholder 3. Project management
3. Stakeholder engagement plan updates
engagement plan assessment matrix 1. Communications
2. Project documents 4. Interpersonal and team management plan
1. Issue log skills 2. Stakeholder
2. Lessons learned 1. Observation/ engagement plan
register conversation 4. Project documents
3. Project 5. Meetings updates
communications 1. Issue log
3. Work performance data 2. Lessons learned
4. EEF register
5. OPA 3. Stakeholder register

1
Risk Management

Process Description Process Group Inputs Tools & Techniques Outputs

Plan Risk Define how to Planning 1. Project charter 1. Expert judgment 1. Risk management plan
Management conduct risk 2. Project management plan 2. Data analysis
management 1. All components 1. Stakeholder analysis
activities for a 3. Project documents 3. Meetings
project 1. Stakeholder register
4. EEF
5. OPA

Identify Risks Identify individual Planning 1. Project management plan 1. Expert judgment 1. Risk register
project risks as well 1. Requirements mgmt plan 2. Data gathering 2. Risk report
as sources of 2. Schedule mgmt plan 1. Brainstorming 3. Project documents updates
overall project risk, 3. Cost mgmt plan 2. Checklists 1. Assumption log
and document their 4. Quality mgmt plan 3. Interviews 2. Issue log
characteristics 5. Resource mgmt plan 3. Data analysis 3. Lessons learned register
6. Risk mgmt plan 1. Root cause analysis
7. Scope baseline 2. Assumption and constraint
8. Schedule baseline analysis
9. Cost baseline 3. SWOT analysis
2. Project documents 4. Document analysis
1. Assumption log 4. Interpersonal and team skills
2. Cost estimates 1. Facilitation
3. Duration estimates 5. Prompt lists
4. Issue log 6. Meetings
5. Lessons learned register
6. Requirements
documentation
7. Resource requirements
8. Stakeholder register
3. Agreements
4. Procurement documentation
5. EEF
6. OPA

Perform Prioritize individual Planning 1. Project management plan 1. Expert judgment 1. Project documents updates
Qualitative Risk project risks for 1. Risk mgmt plan 2. Data gathering 1. Assumption log
Analysis further analysis or 2. Project documents 1. Interviews 2. Issue log
action by assessing 1. Assumption log 3. Data analysis 3. Risk register
their probability of 2. Risk register 1. Risk data quality assessment 4. Risk report
occurrence and 3. Stakeholder register 2. Risk probability and impact
impact as well as 3. EEF assessment
other characteristics 4. OPA 3. Assessment of other risk
parameters
4. Interpersonal and team skills
1. Facilitation
5. Risk categorization
6. Data representation
1. Probability and impact matrix
2. Hierarchical charts
7. Meetings

Perform Numerically analyze Planning 1. Project management plan 1. Expert judgment 1. Project documents updates
Quantitative Risk the combined effect 1. Risk mgmt plan 2. Data gathering 1. Risk report
Analysis of identified 2. Scope baseline 1. Interviews
individual project 3. Schedule baseline 3. Interpersonal and team skills
risks and other 4. Cost baseline 1. Facilitation
sources of 2. Project documents 4. Representations of uncertainty
uncertainty on 1. Assumption log 5. Data analysis
overall project 2. Basis of estimates 1. Simulations
objectives. 3. Cost estimates 2. Sensitivity analysis
4. Cost forecasts 3. Decision tree analysis
5. Duration estimates 4. Influence diagrams
6. Milestone list
7. Resource requirements
8. Risk register
9. Risk report
10. Schedule forecasts
3. EEF
4. OPA

1
Risk Management

Plan Risk Develop options, Planning 1. Project management plan 1. Expert judgment 1. Change requests
Responses select strategies, 1. Resource mgmt plan 2. Data gathering 2. Project mgmt plan updates
and agree on 2. Risk mgmt plan 1. Interviews 1. Schedule mgmt plan
actions to address 3. Cost baseline 3. Interpersonal and team skills 2. Cost mgmt plan
overall project risk 2. Project documents 1. Facilitation 3. Quality mgmt plan
exposure, as well 1. Lessons learned register 4. Strategies for threats 4. Resource mgmt plan
as to treat individual 2. Project schedule 5. Strategies for opportunities 5. Procurement mgmt plan
project risks 3. Project team 6. Contingent response strategies 6. Scope baseline
assignments 7. Strategies for overall project risk 7. Schedule baseline
4. Resource calendars 8. Data analysis 8. Cost baseline
5. Risk register 1. Alternatives analysis 3. Project docs updates
6. Risk report 2. Cost-benefit analysis 1. Assumption log
7. Stakeholder register 9. Decision making 2. Cost forecasts
3. EEF 1. Multicriteria decision analysis 3. Lessons learned register
4. OPA 4. Project schedule
5. Project team
assignments
6. Risk register
7. Risk report

Implement Risk Implement agreed- Executing 1. Plan management plan 1. Expert judgment 1. Change requests
Responses upon risk response 1. Risk mgmt plan 2. Interpersonal and team skills 2. Project documents updates
plans 2. Project documents 1. Influencing 1. Issue log
1. Lessons learned register 3. PMIS 2. Lessons learned register
2. Risk register 3. Project team
3. Risk report assignments
3. OPA 4. Risk register
5. Risk report

Monitor Risks Monitor the Monitoring & 1. Project management plan 1. Data analysis 1. Work performance
implementation of Controlling 1. Risk mgmt plan 1. Technical performance information
agreed-upon risk 2. Project documents analysis 2. Change requests
response plans, 1. Issue log 2. Reserve analysis 3. Project management plan
track identified 2. Lessons learned register 2. Audits updates
risks, identify and 3. Risk register 3. Meetings 1. Any component
analyze new risks, 4. Risk report 4. Project documents updates
and evaluate risk 3. Work performance data 1. Assumption log
process 4. Work performance reports 2. Issue log
effectiveness 3. Lessons learned register
throughout the 4. Risk register
project 5. Risk report
5. OPA updates

2
Procurement Management

Process Description Process Group Inputs Tools & Techniques Outputs

Plan Procurement Document project Planning 1. Project charter 1. Expert judgment 1. Procurement management plan
Management procurement 2. Business documents 2. Data gathering 2. Procurement strategy
decisions, 1. Business case 1. Market research 3. Bid documents
specifying the 2. Benefits mgmt plan 3. Data analysis 4. Procurement statement of work
approach and 3. Project management plan 1. Make-or-buy analysis 5. Source selection criteria
identify potential 1. Scope mgmt plan 4. Source selection analysis 6. Make-or-buy decisions
sellers 2. Quality mgmt plan 5. Meetings 7. Independent cost estimates
3. Resource mgmt plan 8. Change requests
4. Scope baseline 9. Project documents updates
4. Project docs 1. Lessons learned register
1. Milestone list 2. Milestone list
2. Project team assignments 3. Requirements
3. Requirements documentation documentation
4. Requirements traceability 4. Requirements traceability
matrix matrix
5. Resource requirements 5. Risk register
6. Risk register 6. Stakeholder register
7. Stakeholder register 10. OPA updates
5. EEF
6. OPA

Conduct Obtain seller Executing 1. Project management plan 1. Expert judgment 1. Selected sellers
Procurements responses, select a 1. Scope, Requirements, 2. Advertising 2. Agreements
seller, and award a Communications, Risk, 3. Bidder conferences 3. Change requests
contract Procurement, & Configuration 4. Data analysis 4. Project management plan
management plans 1. Proposal evaluation updates
2. Cost baseline 5. Interpersonal and team skills 1. Requirements, Quality,
2. Project documents 1. Negotiation Communications, Risk, &
1. Lessons learned register Procurement management
2. Project schedule plans
3. Requirements documentation 2. Scope baseline
4. Risk register 3. Schedule baseline
5. Stakeholder register 4. Cost baseline
3. Procurement documentation 5. Project documents updates
4. Seller proposals 1. Lessons learned register
5. EEF 2. Requirements
6. OPA documentation
3. Requirements traceability
matrix
4. Resource calendars
5. Risk register
6. Stakeholder register
6. OPA updates

Control Manage Monitoring & 1. Project management plan 1. Expert judgment 1. Closed procurements
Procurements procurement Controlling 1. Requirements mgmt plan 2. Claims administration 2. Work performance information
relationships; 2. Risk mgmt plan 3. Data analysis 3. Procurement documentation
monitor contract 3. Procurement mgmt plan 1. Performance reviews updates
performance, and 4. Change mgmt plan 2. Earned value analysis 4. Change requests
make changes and 5. Schedule baseline 3. Trend analysis 5. Project mgmt plan updates
corrections as 2. Project documents 4. Inspection 1. Risk mgmt plan
appropriate; close 1. Assumption log 5. Audits 2. Procurement mgmt plan
out contracts 2. Lessons learned register 3. Schedule baseline
3. Milestone list 4. Cost baseline
4. Quality reports 6. Project docs updates
5. Requirements documentation 1. Lessons learned register
6. Requirements traceability 2. Resource requirements
matrix 3. Requirements traceability
7. Risk register matrix
8. Stakeholder register 4. Risk register
3. Agreements 5. Stakeholder register
4. Procurement documentation 7. OPA updates
5. Approved change requests
6. Work performance data
7. EEF
8. OPA

1
Stakeholders Management

Process Description Process Group Inputs Tools & Techniques Outputs

Identify Identify project Initiating 1. Project charter 1. Expert judgment 1. Stakeholder register
Stakeholders stakeholders regularly 2. Business documents 2. Data gathering 2. Change requests
and analyze and 1. Business case 1. Questionnaires and 3. Project mgmt plan
document relevant 2. Benefits mgmt plan surveys updates
information regarding 3. Project mgmt plan 2. Brainstorming 1. Requirements mgmt
their interests, 1. Communications mgmt 3. Data analysis plan
involvement, plan 1. Stakeholder analysis 2. Communications
interdependencies, 2. Stakeholder engagement 2. Document analysis mgmt plan
influence, and potential plan 4. Data representation 3. Risk mgmt plan
impact on project 4. Project documents 1. Stakeholder mapping/ 4. Stakeholder
success 1. Change log representation engagement plan
2. Issue log 5. Meetings 4. Project docs updates
3. Requirements 1. Assumption log
documentation 2. Issue log
5. Agreements 3. Risk register
6. EEF
7. OPA

Plan Stakeholder Develop approaches to Planning 1. Project charter 1. Expert judgment 1. Stakeholder engagement
Engagement involve project 2. Project mgmt plan 2. Data gathering plan
stakeholders based on 1. Resource mgmt plan 1. Benchmarking
their needs, 2. Communications mgmt 3. Data analysis
expectations, interests, plan 1. Assumption and
and potential impact on 3. Risk mgmt plan constraint analysis
the project 3. Project docs 2. Root cause analysis
1. Assumption log 4. Decision making
2. Change log 1. Prioritization/ranking
3. Issue log 5. Data representation
4. Project schedule 1. Mind mapping
5. Risk register 2. Stakeholder engagement
6. Stakeholder register assessment matrix
4. Agreements 6. Meetings
5. EEF
6. OPA

Manage Communicate and Executing 1. Project management plan 1. Expert judgment 1. Change requests
Stakeholder working with 1. Communications, risk, 2. Communication skills 2. Project mgmt plan
Engagement stakeholders to meet and change management 1. Feedback updates
their needs and plans 3. Interpersonal and team skills 1. Communications
expectations, address 2. Stakeholder engagement 1. Conflict management mgmt plan
issues, and foster plan 2. Cultural awareness 2. Stakeholder
appropriate stakeholder 2. Project documents 3. Negotiation engagement plan
involvement 1. Change log 4. Observation/conversation 3. Project docs updates
2. Issue log 5. Political awareness 1. Change log
3. Lessons learned register 4. Ground rules 2. Issue log
4. Stakeholder register 5. Meetings 3. Lessons learned
3. EEF register
4. OPA 4. Stakeholder register

Monitor Monitor project Monitoring & 1. Project management plan 1. Data analysis 1. Work performance
Stakeholder stakeholder Controlling 1. Resource mgmt plan 1. Alternatives analysis information
Engagement relationships and tailor 2. Communications mgmt 2. Root cause analysis 2. Change requests
strategies for engaging plan 3. Stakeholder analysis 3. Project mgmt plan
stakeholders through 3. Stakeholder engagement 2. Decision making updates
modification of plan 1. Multicriteria decision 1. Resource mgmt plan
engagement strategies 2. Project documents analysis 2. Communications
and plans 1. Issue log 2. Voting mgmt plan
2. Lessons learned register 3. Data representation 3. Stakeholder
3. Project communications 1. Stakeholder engagement engagement plan
4. Risk register assessment matrix 4. Project documents
5. Stakeholder register 4. Communication skills updates
3. Work performance data 1. Feedback 1. Issue log
4. EEF 2. Presentations 2. Lessons learned
5. OPA 5. Interpersonal and team skills register
1. Active listening 3. Risk register
2. Cultural awareness 4. Stakeholder register
3. Leadership
4. Networking
5. Political awareness
6. Meetings

S-ar putea să vă placă și