Sunteți pe pagina 1din 2

10.

RATES FOR LOADING , UNLOADING, STACKING AND


TRANSPORTATION OF MATERIALS FOR THE YEAR 2016-17
Sr.No. Materials Unit Rates for Rates for Rates for Rates for
Loading Unloading Stacking Transportation
carriage of including
materials carriage of
upto a lead materials
of 50 Mtrs. up to a lead
of 50 Mtrs.
(in Rs.) (in Rs.) (in Rs.)
10% Extra over the rates
Boulders Rubbles
1 Cu.M. 32.56 27.14 16.28 for Transportation of
& Masonry stones
metal

As per schedule
2 Metal of all sizes Cu.M. 32.56 27.14 16.28
attached

Moorum Sand
15% Below the rates for
3 Earth & Loose Cu,.M. 27.14 25.48 10.85
Transportation of metal
material

30% Below the rates for


4 Lime Cu.M. 37.99 34.36 12.66
Transportation of metal

All types of
Flooring Tiles such
as Shahabad /
Sikosa/ 1/5 of the rates for
5 Sq.M. 1.64 1.64 1.48
Kota/Marble Transportation of metal
/Granaite/
Vetrified/ Ceramic
etc
1/2 of the rates for
6 Fuel Wood (Babul) M.T. 30.76 27.14 7.04
Transportation of metal
10% Below the rates for
Transportation of metal
7 Cement M.T. 47.19 34.33 21.68 for delivery other than
factory and Railway
station.

Mild Steel bars of 10% Below the rates for


8 M.T. 58.06 47.19 28.94
all sizes. Transportation of metal

258
Sr.No. Materials Unit Rates for Rates for Rates for Rates for
Loading Unloading Stacking Transportation
carriage of including
materials carriage of
upto a lead materials
of 50 Mtrs. up to a lead
of 50 Mtrs.
(in Rs.) (in Rs.) (in Rs.)

30% Below the rates for


9 Timber Cu,M. 34.36 25.34 12.66
Transportation of metal

As per transportation
10 Maxphal Pack Tin M.T. 55.56 50.25 23.81
rate- Note 5(i)
Carting of bulk
As per transportation
10-A Bitumen ---- ---- ----
rate- Note 5(ii)
A) From refinery
Bituminous &
Metal mix (mix 10% Below the rates for
10-B M.T. ---- ---- ----
material) Transportation of metal
transportation
Same as per rates for
11 Bricks Cu.M. 28.94 28.94 19.91
Transportation of metal
Manglore tiles
10% Below the rates for
12 including Ridgeing 1000 Nos 32.56 28.94 24.50
Transportation of metal
and Hipping
Single Allahbad
10% Below the rates for
13 tiles and country 1000 Nos 32.56 28.94 24.50
Transportation of metal
tiles
3/4 of the rates for
14 A.C.sheets M.T. 36.19 28.94 14.48
Transportation of metal
1000 1.5 Times the rates for
15 Bamboos 65.30 47.19 41.76
Nos Transportation of metal

Ballies of all 1/10th time the rates for


16 Rmt. 0.50 0.50 0.50
Diameters Transportation of metal

5% Extra over the rates


17 Gravel Cu.M. 16.28 12.66 9.05 for Transportation of
metal
Same as the rates for
18 Steam Coal M.T. 36.19 27.14 12.66
Transportation of metal
3/4 of the rates for
19 G.I.Sheets M.T. 34.36 27.14 12.66
Transportation of metal
R.C.C.Pipes and As per transportation
20 M.T. 73.48 58.03 27.08
Collers rate- Note 4

259

S-ar putea să vă placă și