Sunteți pe pagina 1din 1

Sakaka Project 405 MW

Block NO. : Checklist - Electrical Installation of string inverter


Checklist No. : 18002-PVB-FQE-CL-INV-
Refrence drawing: 18002-EA-EVD-015-00/18002-ED-ECD-005-05
001-1

INV
INV
INV
INV
INV
INV
INV
INV
INV
INV
INV
INV
INV
INV
INV
Inverter No.

Items to be checked

Cable glands are installed


The AC cable is connected to the correct
Inverter
The correct heat shrink is used, heat is
applied uniformly
AC SIDE

Ground cable is connected and torqued


(8N.P)
L1
The correct torque is
applied(10 N.P) & bolts L2
are marked
L3

All cables are labled

MPPT 1

MPPT 2
The cables(+/-) are MPPT 3
connected to the
correct terminals. MPPT 4

MPPT 5

MPPT 6
DC SIDE

MPPT 1
MPPT 2
Positive and negative
MPPT 3
connecter are installed
correctly (MPPT MPPT 4
1,2,3,4,5,6)
MPPT 5

MPPT 6
cables are labled

Inverters are labled


Remarks:

Sub-contractor EPC QC EPC Client