PROPUESTA EN DETALLE
Item
1
2
3
4
INDEXUM
SISTEMA DE PROTECCION, CONTROL, MEDICION, AUTOMATIZACION Y TELECOMUNICACIONES
PROPUESTA EN DETALLE
Descripción Cantidad
Tableros de Protección y Control - 138kV Global
Sistema de automatización - SAS - 138KV Global
Sistema de Telecomunicaciones Global
260,870.53
196,664.54 196,664.54
19%
VALOR VENTA TOTAL (USD) 1,034,576.03
TOTAL PROJECT PCM
Direct Cost 788,248.41 Direct Cost
Indirect Cost 5.00% 39,412.42 Indirect Cost
Total Cost 827,660.83 Total Cost
Gross Margin GM (%) 20.0% 206,915.21 Gross Margin
Sales & Administration S&A (%) 10.0% 103,457.60 Sales & Administration (INDEXUM)
EBIT EBIT (%) 10.0% 103,457.60 EBIT
SALES PRICE 23.8% 1,034,576.03 SALES PRICE
SAS
Direct Cost
Indirect Cost
Total Cost
Gross Margin
Sales & Administration (INDEXUM)
EBIT
SALES PRICE
TEL
Direct Cost
Indirect Cost
Total Cost
Gross Margin
Sales & Administration (INDEXUM)
EBIT
SALES PRICE
SERVICE
Direct Cost
Indirect Cost
Total Cost
Gross Margin
Sales & Administration (INDEXUM)
EBIT
SALES PRICE
LAN-ODF
315,878.27 Direct Cost
5.00% 15,793.91 Indirect Cost 5.00%
331,672.18 Total Cost
GM (%) 20.00% 82,918.05 Gross Margin GM (%) 20.00%
S&A (%) 10.0% 41,459.02 Sales & Administration (INDEXUM) S&A (%) 10.0%
EBIT (%) 10.0% 41,459.02 EBIT EBIT (%) #DIV/0!
23.8% 414,590.23 SALES PRICE #DIV/0!
SSAA
73,292.72 Direct Cost
5.00% 3,664.64 Indirect Cost 5.00%
76,957.36 Total Cost
GM (%) 20.00% 19,239.34 Gross Margin GM (%) 20.00%
S&A (%) 10.0% 9,619.67 Sales & Administration (INDEXUM) S&A (%) 10.0%
EBIT (%) 10.0% 9,619.67 EBIT EBIT (%) #DIV/0!
23.8% 96,196.70 SALES PRICE #DIV/0!
CCTV
249,237.77 Direct Cost
5.00% 12,461.89 Indirect Cost 5.00%
261,699.66 Total Cost
GM (%) 20.00% 65,424.91 Gross Margin GM (%) 20.00%
S&A (%) 10.0% 32,712.46 Sales & Administration (INDEXUM) S&A (%) 10.0%
EBIT (%) 10.0% 32,712.46 EBIT EBIT (%) #DIV/0!
23.8% 327,124.57 SALES PRICE #DIV/0!
SDAI
149,839.65 Direct Cost
5.00% 7,491.98 Indirect Cost 5.00%
157,331.63 Total Cost
GM (%) 20.00% 39,332.91 Gross Margin GM (%) 20.00%
S&A (%) 10.0% 19,666.45 Sales & Administration (INDEXUM) S&A (%) 10.0%
EBIT (%) 10.0% 19,666.45 EBIT EBIT (%) #DIV/0!
23.8% 196,664.54 SALES PRICE #DIV/0!
1,034,576.03
PCM Direct Cost Sales Price
- PROTECTION AND CONTROL 153,113.10 200,960.94
- FAULT REGISTER 36,367.45 47,732.28
- METER 55,300.00 72,581.25
- ALARMS - -
- LAN & GPS - -
- TEST BLOCK 10,020.00 13,151.25
- TRIP SUP 6,440.00 8,452.50
AUXILIARY RELAY 8,005.00 10,506.56
ELECTRICAL MATERIAL 19,796.56 25,982.99
- CABINET & ACC 15,636.16 20,522.46
- INDEXUM - MAN HOUR - -
- THIRD PARTY 5,600.00 7,350.00
- CONTINGENCY 5,600.00 7,350.00
- RISK - -
- 315,878.27 414,590.23
-
SAS Direct Cost Sales Price
CONTROL DEVICE 15,380.00 20,186.25
- POWER SUPPLY 1,000.00 1,312.50
- SOFTWARE 19,250.00 25,265.63
- LAN & GPS 26,200.00 34,387.50
- CABLE 1,134.00 1,488.38
- AUXILIARY RELAY - -
- ELECTRICAL MATERIAL 1,387.50 1,821.09
- CABINET & ACC 3,901.22 5,120.35
FURNITURE - -
INDEXUM - MAN HOUR - -
- THIRD PARTY 2,140.00 2,808.75
- CONT 2,900.00 3,806.25
- RISK - -
- 73,292.72 96,196.70
-
- TEL Direct Cost Sales Price
- POWER LINE CARRIER 133,093.72 174,685.50
FIBER OPTIC 60,000.00 78,750.00
TELEPROTECTION 9,000.10 11,812.63
TELEPHONE SYSTEM 1,300.00 1,706.25
CABLE - -
ELECTRICAL MATERIAL 1,776.60 2,331.79
CABINET & ACC 7,857.28 10,312.68
INDEXUM - MAN HOUR 18,570.08 24,373.22
THIRD PARTY 8,040.00 10,552.50
CONT 9,600.00 12,600.00
RISK - -
249,237.77 327,124.57
1.- SE SURIRAY (AMPLIACION)
SW POE-LAN
ODF1 - SE QUENCORO
95M1 - 95M2
PST PSL
87T+86+50/51 87L+21+67N
NR NR
95P-1 95P-2 95P-1
MF PLP+TP
SEL735 OPU-1 DIMAT
95M1 - 95M2
BCU BCU
NR HMI NR HMI
PPR PPL
87R+86+50/51 87L+21+67N
NR NR
95P-1 95P-2 95P-1 95P-2
PSR PSL
87R+86+50/51 87L+21+67N
NR NR
95P-1 95P-2 95P-1 95P-2
SCADA STATION
HOT
LEVEL 3 KVM EXTENDER MUX - BACKUP
0-9500
SCADA STATION LOOP TELECOM
STAND BY WORK STATION
LEVEL 3
SW IEC104 - LEVEL 3
SW IEC104 - LEVEL 3
GPS
DC/AC CONVERTER
3.- SE QUENCORO REP (AMPLIACION)
HMI
UC-RF
F. RECORDER CENTRAL UNIT
RPV-311
BCU
SCADA STATION SW IEC61850 LEVEL 2 NR
NR
SW IEC61850 LEVEL 2
ROUTER - IEC104
MF MF PLP
SEL735 SEL735 OPU-1 DIMAT
BCU BCU
NR HMI NR HMI TP
TPU-1
PPL PPL
87L+21+67N 87L+21+67N
NR NR
95P-1 95P-2 95P-1 95P-2
PSL PSL
87L+21+67N 87L+21+67N
NR NR
95P-1 95P-2 95P-1 95P-2
SW POE - LAN
ODF1 - SE Onocora
SW IEC104 - LEVEL 3 WS
OPERATION
SW IEC104 - LEVEL 3
GPS WS
OPERATION
WS
PROTECTION
WS
TELECOM
RED LAN LINEA 220KV - SE QUENCORO LINEA 220KV - SE QUENCORO
RED LAN & ODF ONDA PORTADORA TPCM - LINEA 220KV
PLP1 PL1
PLP+TP MF
OPU-1 DIMAT SEL735
BCU
SW IEC61850 LEVEL 2 NR HMI
SW IEC61850 LEVEL 2
95P-1 95P-2
UB-RF
F. RECORDER
RA-331
SW POE-LAN
ODF1 - SE Suriray
ODF2 - Caseta 1
ODF3 - Caseta 3
ODF4 - CCTV
ROUTER - IEC104
ODF1 - SE Suriray
ODF2 - SE Onocora
ODF4 - Caseta 1
ODF5 - Caseta 2
ODF6 - CCTV
MF BCU
SEL735 CONTROL
NR
95M1 - 95M2
AUTOMATIC TRANSFERENCE
HMI CONTROL
NR
87L+21+67N
95P-1 95P-2
87L+21+67N
95P-1 95P-2
UB-RF
87B-50BF F. RECORDER
SIEMENS RA-331
RED LAN LINEA 220KV - SE QUENCORO LINEA 220KV - SE QUENCORO
RED LAN & ODF ONDA PORTADORA TPCM - LINEA 220KV
PLP1 PL3
SW POE-LAN
UPB UB-RF
87B-50BF F. RECORDER
NR RA-331
SW POE-LAN
ODF1 - Caseta 1
ODF2 - CCTV
PLP+TP MF
OPU-1 DIMAT SEL735
BCU
SW IEC61850 LEVEL 2 TP NR HMI
HMI
TPU-1
SW IEC61850 LEVEL 2
ICCP
ICCP - COES
STAND BY
SERVICIOS AUXILIARES SERVICIOS AUXILIARES
CORRIENTE ALTERNA 380/220 VAC CORRIENTE CONTINUA 125VDC
AC1 DC1
BCU
CONTROL
NR
AUTOMATIC TRANSFERENCE
CONTROL
NR
SERVICIOS AUXILIARES
CORRIENTE CONTINUA 125VDC
DC1
SERVICIOS AUXILIARES
CORRIENTE CONTINUA 125VDC
DC1
LINEA 220KV - SE ONOCORA BARRAS 220KV SERVICIOS AUXILIARES
TPCM - LINEA 220KV TP - BARRAS 220KV CORRIENTE ALTERNA 380/220 VAC
PL3 PB1 AC1
MF BCU
SEL735 CONTROL
NR
95M1 - 95M2
PBB
BCU NR
NR HMI
UC-RF
F. RECORDER CENTRAL UNIT
PPL RPV-311
87L+21+67N
NR
95P-1 95P-2
PSL
87L+21+67N
NR
95P-1 95P-2
UPB UB-RF
87B-50BF F. RECORDER
NR RA-331
ACOPLAMIENTO 220KV BARRAS 220KV SERVICIOS AUXILIARES
TPC - ACOPLAMIENTO TPC - BARRAS CORRIENTE ALTERNA 380/220 VAC
PAC PB2 AC1
BCU
PBB CONTROL
NR NR
AUTOMATIC TRANSFERENCE
BCU UC-RF CONTROL
NR HMI F. RECORDER CENTRAL UNIT NR
RPV-311
PPA
50/51+27+59
NR
95P-1 95P-2
UPB
87B-50BF
NR
SERVICIOS AUXILIARES
CORRIENTE CONTINUA 125VDC
DC1
MF BCU
SEL735 CONTROL
NR
95M1 - 95M2
AUTOMATIC TRANSFERENCE
BCU CONTROL
NR HMI NR
HMI
PPL
87L+21+67N
NR
95P-1 95P-2
PSL
87L+21+67N
NR
95P-1 95P-2
UB-RF
F. RECORDER
RA-331
ERVICIOS AUXILIARES SERVICIOS AUXILIARES
NTE ALTERNA 380/220 VAC CORRIENTE CONTINUA 125VDC
DC1
ERVICIOS AUXILIARES SERVICIOS AUXILIARES
NTE ALTERNA 380/220 VAC CORRIENTE CONTINUA 125VDC
DC1
MATIC TRANSFERENCE
ERVICIOS AUXILIARES
IENTE CONTINUA 125VDC
NOTAS IMPORTANTES
(1) 87B.- Se debera ampliar 3 TRMs y un modulo de entradas binarias B90
entradas binarias B90
Direct Cost
Indirect Cost 5.00%
Total Cost
Gross Margin GM (%) 20.0%
Sales & Administration S&A (%) 10.0%
EBIT EBIT (%) 10.0%
SALES PRICE 23.8%
1 1 1 PL1 TPM LINE 138KV - (1CBs Single pole) - (87L+21), (87L+21), MF, FR(UB)
1 1 1 PL2 TPCM LINE 138KV - (1CBs Single pole) - BC, PL1 (87L+21+67N), PL2 (PL87L+21+67N), MF, RF-UB
1 1 1 PT1 TPCM TRANSFORMADOR 220 / 138 KV - (1CBs Three pole) - PPT (87T+50+51), PST ( 50+51), MF-HV
1 1 1 PB1 TP BUSBAR 220 KV - (1CBs Single pole) - (87B - 5 BAYS DISTRIBUITED)
1 1 1
1 1 1
1 1 1
1 1 1
315,878.27
15,793.91
331,672.18
82,918.05
41,459.02
41,459.02
414,590.23
Qy Unit Cost Unit Sales
2 44,555 58,478
4 39,261 51,530
1 47,639 62,526
1 22,087 28,989
PROTECTION AND CONTROL FAULT R. METER
BUSBAR LINE XTR COUPLING OT OEM RF MF
Discount (%)
Taxes (%) 5.00% 5.00% 5.00% 5.00% 5.00% 1.50%
- 24,298.05 - - - 3,176.95 7,900.00
- 19,183.50 - - - 3,176.95 7,900.00
- - 18,543.00 - - 10,806.71 7,900.00
- - - - 9,240.00 6,499.05 -
Direct Cost - 125,330.10 18,543.00 - 9,240.00 36,367.45 55,300.00
Sales Price - 164,495.76 24,337.69 - 12,127.50 47,732.28 72,581.25
Percentage 1 0% 40% 6% 0% 3% 12% 18%
Percentage 2 48% 12% 18%
ALARMS LAN & GPS TEST BLOCK TRIP SUP AUXILIARY RELAY
AL-74 SWITCH GPS 95P 95M TCS AX AFX
10.00%
- - - - 9,900.00 2,900.00 300.00 -
- - - - 9,900.00 2,900.00 300.00 -
- - - - 19,800.00 5,800.00 600.00 -
- - - - 25,987.50 7,612.50 787.50 -
0% 0% 0% 0% 27% 8% 1% 0%
26% 36%
CABLE AUXILIARY RELAY ELECTRICAL MATERIA
PC FO CAR FO PC CU AX AFX BX KEY MCB
SALES
UNIT TOTAL
53,381.16 53,381.16
42,815.54 42,815.54
96,197
Direct Cost
Indirect Cost 5.00%
Total Cost
Gross Margin GM (%) 20.00%
Sales & Administration S&A (%) 10.0%
EBIT EBIT (%) 10.0%
SALES PRICE 23.8%
- - - 2,250.02 - 25.00 -
- - - - - 300.00 -
- - - - - 300.00 -
- - - 9,000.10 - 1,300.00 -
- - - 11,812.63 - 1,706.25 -
0% 0% 0% 4% 0% 1% 0%
24% 4% 1%
CABLE ELECTRICAL MATERIAL CABINET & ACC
PC FO SM MM MCB TBLOCK CABLE EM-ACC CABINET
- - - - - - - -
- - - - - - - -
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
ELECTRICAL MATERIAL CABINET & ACC INDEXUM - MAN HOUR THIRD PARTY
CABLE EM-ACC CABINET CAB-ACC ENG PM FAT SUBC
100% 100% 100%
- - - - - - - -
- - - - - - - -
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
THIRD PARTY CONTINGENCY & RISK PRICES IN USD
OTHER CONT RISK MB #DIV/0!
50% COST SALES
UNIT TOTAL UNIT TOTAL
- - - - - #DIV/0! #DIV/0!
- - - - #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0!
Direct Cost
Indirect Cost
Total Cost
Gross Margin GM (%)
Sales & Administration S&A (%)
EBIT EBIT (%)
SALES PRICE
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
ELECTRICAL MATERIAL CABINET & ACC INDEXUM - MAN HOUR
TBLOCK CABLE EM-ACC CABINET CAB-ACC ENG PM FAT
15.0% 100% 100% 100%
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
THIRD PARTY CONTINGENCY & RISK PRICES IN USD
SUBC OTHER CONT RISK MB #DIV/0!
COST SALES
UNIT TOTAL UNIT
- - - - - - #DIV/0!
- - - - - - #DIV/0!
- - - - - - #DIV/0!
- - - - - - #DIV/0!
- - - - - - #DIV/0!
- - - - - - #DIV/0!
- - - - - - #DIV/0!
- - - - - - #DIV/0!
- - - - - - #DIV/0!
- - - - - - #DIV/0!
- - - - - - #DIV/0!
- - - - - - #DIV/0!
- - - - - - #DIV/0!
- - - - - - #DIV/0!
- - - - - - #DIV/0!
- - - - - - #DIV/0!
- - - - -
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0!
USD
SALES
TOTAL
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Direct Cost
Indirect Cost
Total Cost
Gross Margin GM (%)
Sales & Administration S&A (%)
EBIT EBIT (%)
SALES PRICE
- - - - - - - -
- - - - - - - -
- - - - - - - -
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0!
CABLE ELECTRICAL MATERIAL CABINET & ACC INDEXUM - MAN H
MM MCB TBLOCK CABLE EM-ACC CABINET CAB-ACC ENG
100%
- - - - - - - -
- - - - - - - -
- - - - - - - -
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
INDEXUM - MAN HOUR THIRD PARTY CONTINGENCY & RISK PRICES IN USD
PM FAT SUBC OTHER CONT RISK MB
100% 100% 50% COST
UNIT
- - - - - - -
- - - - - - -
- - - - - -
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
PRICES IN USD
#DIV/0!
COST SALES
TOTAL UNIT TOTAL
- #DIV/0! #DIV/0!
- #DIV/0! #DIV/0!
- #DIV/0!
Direct Cost
Indirect Cost
Total Cost
Gross Margin GM (%)
Sales & Administration S&A (%)
EBIT EBIT (%)
SALES PRICE
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
INDEXUM - MAN HOUR THIRD PARTY CONTINGENCY & RISK PRICES IN USD
PM FAT SUBC OTHER CONT RISK MB
100% 100% COST
UNIT
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - -
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
PRICES IN USD
#DIV/0!
COST SALES
TOTAL UNIT TOTAL
- #DIV/0! #DIV/0!
- #DIV/0! #DIV/0!
- #DIV/0! #DIV/0!
- #DIV/0! #DIV/0!
- #DIV/0! #DIV/0!
- #DIV/0!
Direct Cost
Indirect Cost 5.00%
Total Cost
Gross Margin GM (%) 20.00%
Sales & Administration S&A (%) 10.0%
EBIT EBIT (%) 10.0%
SALES PRICE 23.8%
1 1 1 PM PROJECT MANAGEMENT
1 1 MANAGEMENT STAFF
1 1 PM Project Manager
1 1 PM Assistant Project Manager
1 1 PM Project Controller
1 1 PM Operation Manager
1 1 PM Planner Controller
1 1 PM Planner Procurement
1 1 PM-OTHER Meeting and Travels
1 1 1 IDXM ENGINEERING, FAT, SAT AND STAR UP
1 1 ENGINEERING
1 1 ENG-P&C Protection Engineering
1 1 ENG-P&C Desing Engineering - P&C
1 1 ENG-P&C FAT - SAT Engineering - P&C
1 1 ENG-SAS System Engineering
1 1 ENG-SAS Desing Engineering - SAS
1 1 ENG-SAS FAT - SAT Engineering - SAS
1 1 ENG-TEL Telecom Engineering
1 1 ENG-TEL Desing Engineering - TELECOM
1 1 ENG-TEL FAT - SAT Engineering - TELECOM
1 1 ENG-OTHER Others (SCTR, etc.)
1 1 FACTORY ACCEPTANCE TESTS
1 1 FAT-P&C Protection Engineering
1 1 FAT-P&C Desing Engineering - P&C
1 1 FAT-P&C FAT - SAT Engineering - P&C
1 1 FAT-SAS System Engineering
1 1 FAT-SAS Desing Engineering - SAS
1 1 FAT-SAS FAT - SAT Engineering - SAS
1 1 FAT-TEL Telecom Engineering
1 1 FAT-TEL Desing Engineering - TELECOM
1 1 FAT-TEL FAT - SAT Engineering - TELECOM
1 1 FAT-OTHER Others
1 1 SITE ACCEPTANCE TESTS
1 1 SAT-SUP Site Manager
1 1 SAT-SUP OHS Supervisor
1 1 SAT-P&C Protection Engineering
1 1 SAT-P&C Desing Engineering - P&C
1 1 SAT-P&C FAT - SAT Engineering - P&C 10 días Pruebas END TO END
1 1 SAT-SAS System Engineering
1 1 SAT-SAS Desing Engineering - SAS
1 1 SAT-SAS FAT - SAT Engineering - SAS
1 1 SAT-TEL Telecom Engineering
1 1 SAT-TEL Desing Engineering - TELECOM
1 1 SAT-TEL FAT - SAT Engineering - TELECOM
1 1 SAT-OTHER Hotel and Acomodation
1 1 SAT-OTHER Movility
1 1 CONT Others (SCTR, Seguro de vida, ex. Medco, etc.)
1 1 START UP
1 1 SU-SUP Site Manager
1 1 SU-P&C Protection Engineering
1 0 SU-P&C Desing Engineering - P&C
1 0 SU-P&C FAT - SAT Engineering - P&C
1 1 SU-SAS System Engineering
1 1 SU-SAS Desing Engineering - SAS
1 0 SU-SAS FAT - SAT Engineering - SAS
1 0 SU-TEL Telecom Engineering
1 0 SU-TEL Desing Engineering - TELECOM
1 0 SU-TEL FAT - SAT Engineering - TELECOM
1 1 SU-OTHER Hotel and Acomodation
1 1 SU-OTHER Movility
1 1 CONT Others
1 1 TRAINING
1 1 TR-P&C Protection Engineering
1 0 TR-P&C Desing Engineering - P&C
1 1 TR-P&C FAT - SAT Engineering - P&C
1 1 TR-SAS System Engineering
1 0 TR-SAS Desing Engineering - SAS
1 1 TR-SAS FAT - SAT Engineering - SAS
1 1 TR-TEL Telecom Engineering
1 0 TR-TEL Desing Engineering - TELECOM
1 1 TR-TEL FAT - SAT Engineering - TELECOM
1 1 TR-CCTV FAT - SAT Engineering - TELECOM
1 1 TR-OTHER Others
1 1 1 L220 INSTALLATION
1 1 HUMAN RESOURCES
1 1 IN-SUP Site Manager
1 1 IN-SUP OHS Supervisor
1 1 IN-SUBC Técnico Electricista - Leader
1 1 IN-SUBC Técnico Electricista - Conexionista
1 1 IN-SUBC Técnico Electricista - Ayudante
1 1 ACCOMMODATION
1 1 IN-VIAT Hotel - Personal INDEXUM
1 1 IN-VIAT Hotel - Subcontractor (2 person x room)
1 1 IN-OTHER Camioneta de Emergencia y Seguridad
1 1 IN-OTHER VAN de personal
1 1 IN-OTHER Combustible
1 1 OFFICE AND SERVICES
1 1 IN-OTHER Oficina Contenedor (soles 750 x mes)
1 1 IN-OTHER Letrina y Lavatorio (soles 2500 x mes)
1 1 IN-OTHER Equipos de Señalización y Seguridad (soles 1500 x mes)
1 1 IN-OTHER Utiles de Oficina (Papel, impresiones, etc)
1 1 FIBER OPTICAL ACTIVITIES
1 1 IN-MAT Fusión de cajas de empalme
1 1 IN-MAT Materials
1 1 1 3SERV THIRD PARTY SERVICES
1 1 SERVICES
1 0 ELECMCO Estudio de coordinacion de protecciones
1 0 FO Alquiler de Maleta de prueba
1 0 FO Cartas de Garantia y Fianzas
1 0 PLP Servicios de montaje de sistema de onda portadora
1 0 CCTV Servicios de montaje de sistema de onda portadora
1 0 SDAI Servicios de montaje de sistema de deteccion de incendios
1 0 TRANSP Servicios de transporte
1 1 1
1 1 1
1 1 1
1 1 1
149,839.65
7,491.98 6
157,331.63
39,332.91
19,666.45 285 30
19,666.45 9.5
196,664.54
Qy Unit Price Sales Price
1 12,883 12,883
Qty Duration % Work Day-Hour (USD)
1 285 10% 312.84
15% 87.59
15% 162.68
15% 312.84
15% 175.19
15% 175.19
1 3 100% 300.00
1 102,956 102,956
Qty Duration % Work Day-Hour (USD)
1 33 100% 250.27
100% 162.68
100% 250.27
1 22 100% 250.27
100% 162.68
100% 250.27
1 22 100% 250.27
100% 162.68
100% 250.27
1 1 100% 200.00
1 32 100% 250.27
22 100% 162.68
100% 250.27
1 24 100% 250.27
3 100% 162.68
100% 250.27
1 24 100% 250.27
7 100% 162.68
100% 250.27
1 1 100% 300.00
22 100% 212.73
100% 175.19
1 42 100% 250.27
100% 162.68
1 15 100% 250.27
1 21 100% 250.27
100% 162.68
12 100% 250.27
1 21 100% 250.27
100% 162.68
15 100% 250.27
1 42 100% 50.00
1 42 100% 120.00
1 1 100% 1,000.00
7 100% 212.73
7 100% 250.27
162.68
250.27
1 9 100% 250.27
3 100% 162.68
250.27
250.27
162.68
250.27
1 9 100% 50.00
1 9 100% 120.00
1 1 100% 700.00
5 100% 250.27
162.68
100% 250.27
1 3 100% 250.27
162.68
100% 250.27
100% 250.27
162.68
100% 250.27
100% 250.27
1 1 100% 500.00
1 22,747 22,747
Qty Duration % Work Day-Hour (USD)
10 100% 212.73
10 100% 175.19
15 100% 150.16
1 42 100% 87.59
1 42 100% 50.05
10 100% 50.00
1 42 100% 60.00
10 100% 90.00
10 100% 120.00
1 42 100% 15.00
10 100% 13.11
10 100% 43.71
10 100% 26.22
1 100% 125.00
1 7 100% 1,200.00
1 100% 7,500.00
1 58,078 58,078
Qty Budget (USD)
2,000.00
1 14,250.00
1 30,000.00
10,000.00
5,000.00
10,375.00
0 270.00
MANAGEMENT ENGINEERING FAT
PM PM-OTHER ENG-P&C ENG-SAS ENG-TEL ENG-OTHER FAT-P&C
Discount (%) 0.00% 0.00% 0.00% 0.00%
Taxes (%)
8,915.89 900.00 - - - - -
8,916 - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- 900 - - - - -
- - 8,259 - - - -
- - - - - - -
- - - - - - -
- - - 5,506 - - -
- - - - - - -
- - - - - - -
- - - - 5,506 - -
- - - - - - -
- - - - - - -
- - - - - 200 -
- - - - - - -
- - - - - - 8,009
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
6,006 - - - - - - -
- - - - - - - -
- - - - - - - -
- 6,006 - - - - - -
- - - - - - - -
- - - - - - - -
- - 300 - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - 10,511 - - -
- - - - - - - -
- - - - 3,754 - - -
- - - - - 5,256 - -
- - - - - - - -
- - - - - - - -
- - - - - - 5,256 -
- - - - - - - -
- - - - - - - -
- - - - - - - 2,100
- - - - - - - 5,040
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - 2,252 - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - 450 - - -
- - - - 1,080 - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - 751 -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 500.00 - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 500 - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - 3,679 - - - -
- - - 2,102 - - - -
- - - - - - - -
- - - - - - - -
- - - - - 2,520 - -
- - - - - - - -
- - - - - - - -
- - - - - - 630 -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - 8,400 - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - 1,700.00 -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - 1,000 -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - 700 -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
44,250.00 - - - - - -
- - - - - - -
14,250 - - - - - -
30,000 - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
44,250.00 - - - - 1,700.00 -
58,078.13 - - - - 2,231.25 -
30% 0% 0% 0% 0% 1% 0%
30% 1%
PRICES IN USD
MB 23.81%
COST SALES
UNIT TOTAL UNIT TOTAL
149,840 196,665
Total Hora Total Día Total Mes Total Anual
INDEXUM USD USD USD USD
Project Manager $39.10 312.84 6,882 82,589
Assistant Project Manager $10.95 87.59 1,927 23,125
Project Controller $20.33 162.68 3,579 42,946
Operation Manager $39.10 312.84 6,882 82,589
Site Manager $26.59 212.73 4,680 56,161
OHS Supervisor $21.90 175.19 3,854 46,250
Planner Controller $21.90 175.19 3,854 46,250
Planner Procurement $21.90 175.19 3,854 46,250
Protection Engineering $31.28 250.27 5,506 66,071
Desing Engineering - P&C $20.33 162.68 3,579 42,946
FAT - SAT Engineering - P&C $31.28 250.27 5,506 66,071
System Engineering $31.28 250.27 5,506 66,071
Desing Engineering - SAS $20.33 162.68 3,579 42,946
FAT - SAT Engineering - SAS $31.28 250.27 5,506 66,071
Telecom Engineering $31.28 250.27 5,506 66,071
Desing Engineering - TELECOM $20.33 162.68 3,579 42,946
FAT - SAT Engineering - TELECOM $31.28 250.27 5,506 66,071
Duración > 0
1 1 1 PCM Decision Date Execution Credit Time Star Date End Date
1 0 BUSBAR F 60 45 90 Jun-14 Dec-14
1 1 LINE F 60 45 90 Jun-14 Dec-14
1 1 XTR F 60 45 90 Jun-14 Dec-14
1 0 COUPLING F 60 45 90 Jun-14 Dec-14
1 1 OT OEM F 60 45 90 Jun-14 Dec-14
1 1 RF F 60 45 90 Jun-14 Dec-14
1 1 MF F 60 45 60 Jun-14 Nov-14
1 0 AL-74
1 0 SWITCH
1 0 GPS
1 1 95P L 45 60 30 Jun-14 Oct-14
1 1 95M L 45 60 30 Jun-14 Oct-14
1 1 TCS L 45 60 30 Jun-14 Oct-14
1 1 AX L 45 60 30 Jun-14 Oct-14
1 0 AFX
1 1 BX L 45 60 30 Jun-14 Oct-14
1 1 KEY L 105 0 30 Jun-14 Oct-14
1 1 MCB L 75 30 60 Jun-14 Nov-14
1 1 TBLOCK L 60 45 60 Jun-14 Nov-14
1 1 CABLE L 60 45 30 Jun-14 Oct-14
1 1 EM-ACC L 105 0 30 Jun-14 Oct-14
1 1 CABINET L 60 45 45 Jun-14 Oct-14
1 1 CAB-ACC L 60 45 45 Jun-14 Oct-14
1 0 ENG
1 0 PM
1 0 FAT
1 1 SUBC L 120 15 60 Jun-14 Dec-14
1 0 OTHER L 135 15 60 Jun-14 Dec-14
1 1 CONT L 135 15 60 Jun-14 Dec-14
1 0 RISK
1 1 1 SAS Decision Date Execution Credit Time Star Date End Date
1 1 SERVER F 60 45 90 Jun-14 Dec-14
1 0 RTU F 60 45 90 Jun-14 Dec-14
1 0 WS F 60 45 90 Jun-14 Dec-14
1 1 ACC F 60 45 90 Jun-14 Dec-14
1 1 INV F 60 45 90 Jun-14 Dec-14
1 0 UPS
1 1 SW SCADA F 60 45 60 Jun-14 Nov-14
1 0 SW ICCP
1 0 SW PROT F 60 45 60 Jun-14 Nov-14
1 0 SW METER F 60 45 60 Jun-14 Nov-14
1 0 SW ADIC F 45 60 30 Jun-14 Oct-14
1 1 SWITCH F 45 60 30 Jun-14 Oct-14
1 1 GPS F 45 60 30 Jun-14 Oct-14
1 1 ODF
1 0 ACC LAN
1 1 PC FO
1 0 CAR FO
1 1 PC CU
1 0 AX
1 0 AFX
1 0 BX
1 0 KEY
1 1 MCB L 60 45 45 Jun-14 Oct-14
1 1 TBLOCK L 60 30 0 Jun-14 Aug-14
1 1 CABLE L 60 30 0 Jun-14 Aug-14
1 1 EM-ACC L 120 15 0 Jun-14 Oct-14
1 1 CABINET L 120 15 60 Jun-14 Dec-14
1 1 CAB-ACC L 135 15 60 Jun-14 Dec-14
1 0 DESK L 135 15 60 Jun-14 Dec-14
1 0 ENG
1 0 PM
1 0 FAT
1 1 SUBC L 120 15 60 Jun-14 Dec-14
1 1 OTHER L 135 15 60 Jun-14 Dec-14
1 1 CONT L 135 15 60 Jun-14 Dec-14
1 0 RISK
1 1 1 TEL Decision Date Execution Credit Time Star Date End Date
1 1 PLP F 60 45 90 Jun-14 Dec-14
1 1 COUPLE F 60 45 90 Jun-14 Dec-14
1 1 TO
1 1 COAXIAL F 60 45 90 Jun-14 Dec-14
1 1 ACC-PLP F 60 45 90 Jun-14 Dec-14
1 1 MUX F 60 45 90 Jun-14 Dec-14
1 0 ROUTER
1 0 SWITCH
1 0 ODF
1 0 ACC-FO
1 1 TEL PROT F 60 45 90 Jun-14 Dec-14
1 0 PBAX F 60 45 90 Jun-14 Dec-14
1 1 TEL F 60 45 90 Jun-14 Dec-14
1 0 ACC-TEL
1 0 PC FO
1 0 SM L 45 60 30 Jun-14 Oct-14
1 0 MM
1 1 MCB L 75 30 60 Jun-14 Nov-14
1 1 TBLOCK L 60 45 60 Jun-14 Nov-14
1 1 CABLE L 60 45 30 Jun-14 Oct-14
1 1 EM-ACC L 105 0 30 Jun-14 Oct-14
1 1 CABINET L 60 45 45 Jun-14 Oct-14
1 1 CAB-ACC L 60 45 45 Jun-14 Oct-14
1 1 ENG
1 0 PM
1 1 FAT
1 1 SUBC L 120 15 60 Jun-14 Dec-14
1 1 OTHER L 135 15 60 Jun-14 Dec-14
1 1 CONT L 135 15 60 Jun-14 Dec-14
1 0 RISK
1 1 1 SSAA Decision Date Execution Credit Time Star Date End Date
1 0 ATR F 60 45 90 Jun-14 Dec-14
1 0 BCU F 60 45 90 Jun-14 Dec-14
1 0 MF F 60 45 90 Jun-14 Dec-14
1 0 MF ACC F 60 45 90 Jun-14 Dec-14
1 0 AL-74
1 0 SWITCH
1 0 GPS
1 0 TCS
1 0 AX L 60 45 90 Jun-14 Dec-14
1 0 AFX
1 0 BX
1 0 KEY
1 0 MCB L 60 45 90 Jun-14 Dec-14
1 0 TBLOCK L 60 45 90 Jun-14 Dec-14
1 0 CABLE L 60 45 90 Jun-14 Dec-14
1 0 EM-ACC L 45 60 30 Jun-14 Oct-14
1 0 CABINET L 45 60 30 Jun-14 Oct-14
1 0 CAB-ACC L 75 30 60 Jun-14 Nov-14
1 0 ENG
1 0 PM
1 0 FAT
1 0 SUBC L 60 45 45 Jun-14 Oct-14
1 0 OTHER L 60 45 45 Jun-14 Oct-14
1 0 CONT L 60 45 45 Jun-14 Oct-14
1 0 RISK
1 1 1 LAN-ODF Decision Date Execution Credit Time Star Date End Date
1 0 PROT CONV F 60 45 90 Jun-14 Dec-14
1 0 GPS
1 0 ROUTER F 60 45 90 Jun-14 Dec-14
1 0 FIREWALL F 60 45 90 Jun-14 Dec-14
1 0 SWITCH F 60 45 90 Jun-14 Dec-14
1 0 ODF F 60 45 90 Jun-14 Dec-14
1 0 ACC-FO
1 0 PC FO
1 0 SM
1 0 MM
1 0 MCB L 60 45 90 Jun-14 Dec-14
1 0 TBLOCK L 60 45 90 Jun-14 Dec-14
1 0 CABLE L 60 45 90 Jun-14 Dec-14
1 0 EM-ACC L 60 45 90 Jun-14 Dec-14
1 0 CABINET L 60 45 90 Jun-14 Dec-14
1 0 CAB-ACC L 45 60 30 Jun-14 Oct-14
1 0 ENG
1 0 PM
1 0 FAT
1 0 SUBC L 60 45 30 Jun-14 Oct-14
1 0 OTHER L 105 0 30 Jun-14 Oct-14
1 0 CONT L 60 45 45 Jun-14 Oct-14
1 0 RISK
1 1 1 CCTV Decision Date Execution Credit Time Star Date End Date
1 0 CAM F 60 45 90 Jun-14 Dec-14
1 0 SW F 60 45 90 Jun-14 Dec-14
1 0 SERVER F 60 45 90 Jun-14 Dec-14
1 0 GRAB
1 0 ACC-CCTV F 60 45 90 Jun-14 Dec-14
1 0 MUX
1 0 ROUTER
1 0 SWITCH F 60 45 90 Jun-14 Dec-14
1 0 ODF
1 0 ACC-FO L 60 45 90 Jun-14 Dec-14
1 0 PC FO
1 0 SM
1 0 MM L 60 45 90 Jun-14 Dec-14
1 0 MCB
1 0 TBLOCK L 45 60 30 Jun-14 Oct-14
1 0 CABLE L 45 60 30 Jun-14 Oct-14
1 0 EM-ACC L 45 60 30 Jun-14 Oct-14
1 0 CABINET L 75 30 60 Jun-14 Nov-14
1 0 CAB-ACC L 60 45 60 Jun-14 Nov-14
1 0 ENG
1 0 PM
1 0 FAT
1 0 SUBC
1 0 OTHER L 60 45 60 Jun-14 Nov-14
1 0 CONT L 60 45 60 Jun-14 Nov-14
1 0 RISK
1 1 1 SDAI Decision Date Execution Credit Time Star Date End Date
1 0 SDAI F 60 45 90 Jun-14 Dec-14
1 0 ACC-SDAI
1 0 PC FO
1 0 SM
1 0 MM
1 0 MCB
1 0 TBLOCK
1 0 CABLE L 60 45 90 Jun-14 Dec-14
1 0 EM-ACC
1 0 CABINET
1 0 CAB-ACC
1 0 ENG
1 0 PM
1 0 FAT
1 0 SUBC L 45 60 30 Jun-14 Oct-14
1 0 OTHER L 45 60 30 Jun-14 Oct-14
1 0 CONT L 45 60 30 Jun-14 Oct-14
1 0 RISK
1 1 1 SERVICES Decision Date Execution Credit Time Star Date End Date
1 1 PM L 60 45 90 Jun-14 Dec-14
1 1 PM-OTHER L 60 45 90 Jun-14 Dec-14
1 1 ENG-P&C L 0 45 90 Jun-14 Oct-14
1 1 ENG-SAS L 0 45 90 Jun-14 Oct-14
1 1 ENG-TEL L 0 45 90 Jun-14 Oct-14
1 1 ENG-OTHER L 0 45 90 Jun-14 Oct-14
1 1 FAT-P&C L 60 45 60 Jun-14 Nov-14
1 1 FAT-SAS L 60 45 90 Jun-14 Dec-14
1 1 FAT-TEL L 60 45 90 Jun-14 Dec-14
1 1 FAT-OTHER L 60 45 90 Jun-14 Dec-14
1 0 SAT-SUP L 120 15 0 Jun-14 Oct-14
1 1 SAT-P&C L 120 15 0 Jun-14 Oct-14
1 1 SAT-SAS L 120 15 0 Jun-14 Oct-14
1 1 SAT-TEL L 120 15 0 Jun-14 Oct-14
1 1 SAT-OTHER L 120 15 0 Jun-14 Oct-14
1 0 SU-SUP L 120 15 0 Jun-14 Oct-14
1 0 SU-P&C L 120 15 0 Jun-14 Oct-14
1 1 SU-SAS L 120 15 0 Jun-14 Oct-14
1 0 SU-TEL
1 1 SU-OTHER L 120 15 0 Jun-14 Oct-14
1 0 TR-P&C
1 1 TR-SAS
1 0 TR-TEL
1 0 TR-CCTV L 120 15 0 Jun-14 Oct-14
1 1 TR-OTHER
1 0 IN-SUP L 120 15 0 Jun-14 Oct-14
1 1 IN-SUBC L 120 15 0 Jun-14 Oct-14
1 1 IN-MAT L 120 15 60 Jun-14 Dec-14
1 1 IN-VIAT L 135 15 60 Jun-14 Dec-14
1 1 IN-OTHER L 135 15 60 Jun-14 Dec-14
1 0 ELECMCO
1 1 FO L 135 15 60 Jun-14 Dec-14
1 0 PLP L 135 15 60 Jun-14 Dec-14
1 0 CCTV L 135 15 60 Jun-14 Dec-14
1 0 SDAI L 135 15 60 Jun-14 Dec-14
1 0 TRANSP L 135 15 60 Jun-14 Dec-14
1 1 CONT L 135 15 60 Jun-14 Dec-14
1 0 RISK
1 1 1 HITOS Decition Date Execution Credit Time Star Date End Date
1 1 Advance F 15 0 0 Jun-14 Jun-14
1 1 CIP - Equipos F 60 45 90 Jun-14 Dec-14
1 1 Advance L 15 0 0 Jun-14 Jun-14
1 1 Engineering L 0 30 90 Jun-14 Sep-14
1 1 FAT L 120 15 90 Jun-14 Jan-15
1 1 ERECTION L 120 15 90 Jun-14 Jan-15
1 1 SAT L 30 45 90 Jun-14 Nov-14
1 1 STAR UP L 30 45 90 Jun-14 Nov-14
1 1 1
1 1 1
EXTERNAL PCM 315,878.27 315,878.27 -
442,893 SAS 71,558.72 73,292.72 1,734.00
- 0.0% TEL 164,156.03 249,237.77 85,081.74
442,893 SSAA - - -
- 0.0% LAN-ODF - - -
- 0.0% CCTV - - -
- 0.0% SDAI - - -
442,893 SERV 148,588.84 149,839.65 1,250.81
LOCAL CONTR
Star Date Jun-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14
0 1 2 3 4
Operation USD - - - - 51,126
3.50 - - - - - -
3.50 125,330.10 - - - - -
3.50 18,543.00 - - - - -
3.50 - - - - - -
3.50 9,240.00 - - - - -
3.50 36,367.45 - - - - -
3.50 55,300.00 - - - - -
- - - - - -
- - - - - -
- - - - - -
3.50 8,060.00 - - - - 8,060.00
3.50 1,960.00 - - - - 1,960.00
3.50 6,440.00 - - - - 6,440.00
3.50 2,205.00 - - - - 2,205.00
- - - - - -
3.50 5,800.00 - - - - 5,800.00
3.50 120.00 - - - - 120.00
3.50 4,498.00 - - - - -
3.50 4,273.56 - - - - -
3.50 6,190.00 - - - - 6,190.00
3.50 4,715.00 - - - - 4,715.00
3.50 11,250.00 - - - - 11,250.00
3.50 4,386.16 - - - - 4,386.16
- - - - - -
- - - - - -
- - - - - -
4.50 5,600.00 - - - - -
5.00 - - - - - -
5.00 5,600.00 - - - - -
- - - - - -
Operation USD - - 218 - 1,170
3.50 13,500.00 - - - - -
3.50 - - - - - -
3.50 - - - - - -
3.50 1,880.00 - - - - -
3.50 1,000.00 - - - - -
- - - - - -
3.50 19,250.00 - - - - -
- - - - - -
3.50 - - - - - -
3.50 - - - - - -
3.50 - - - - - -
3.50 19,800.00 - - - - -
3.50 5,800.00 - - - - -
600.00 - - - - -
- - - - - -
1,120.00 - - - - -
- - - - - -
14.00 - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
3.50 530.00 - - - - 530.00
3.00 25.50 - - 25.50 - -
3.00 192.00 - - 192.00 - -
4.50 640.00 - - - - 640.00
4.50 2,700.00 - - - - -
5.00 1,201.22 - - - - -
5.00 - - - - - -
- - - - - -
- - - - - -
- - - - - -
4.50 1,400.00 - - - - -
5.00 740.00 - - - - -
5.00 2,900.00 - - - - -
- - - - - -
Operation USD - - - - 8,937
3.50 46,041.05 - - - - -
3.50 12,781.01 - - - - -
66,511.66 - - - - -
3.50 5,760.00 - - - - -
3.50 2,000.00 - - - - -
3.50 60,000.00 - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
3.50 9,000.10 - - - - -
3.50 - - - - - -
3.50 1,300.00 - - - - -
- - - - - -
- - - - - -
3.50 - - - - - -
- - - - - -
3.50 642.00 - - - - -
3.50 54.60 - - - - -
3.50 400.00 - - - - 400.00
3.50 680.00 - - - - 680.00
3.50 5,400.00 - - - - 5,400.00
3.50 2,457.28 - - - - 2,457.28
7,007.58 - - - - -
- - - - - -
11,562.50 - - - - -
4.50 5,600.00 - - - - -
5.00 2,440.00 - - - - -
5.00 9,600.00 - - - - -
- - - - - -
Operation USD - - - - -
3.50 - - - - - -
3.50 - - - - - -
3.50 - - - - - -
3.50 - - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
3.50 - - - - - -
- - - - - -
- - - - - -
- - - - - -
3.50 - - - - - -
3.50 - - - - - -
3.50 - - - - - -
3.50 - - - - - -
3.50 - - - - - -
3.50 - - - - - -
- - - - - -
- - - - - -
- - - - - -
3.50 - - - - - -
3.50 - - - - - -
3.50 - - - - - -
- - - - - -
Operation USD - - - - -
3.50 - - - - - -
- - - - - -
3.50 - - - - - -
3.50 - - - - - -
3.50 - - - - - -
3.50 - - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
3.50 - - - - - -
3.50 - - - - - -
3.50 - - - - - -
3.50 - - - - - -
3.50 - - - - - -
3.50 - - - - - -
- - - - - -
- - - - - -
- - - - - -
3.50 - - - - - -
3.50 - - - - - -
3.50 - - - - - -
- - - - - -
Operation USD - - - - -
3.50 - - - - - -
3.50 - - - - - -
3.50 - - - - - -
- - - - - -
3.50 - - - - - -
- - - - - -
- - - - - -
3.50 - - - - - -
- - - - - -
3.50 - - - - - -
- - - - - -
- - - - - -
3.50 - - - - - -
- - - - - -
3.50 - - - - - -
3.50 - - - - - -
3.50 - - - - - -
3.50 - - - - - -
3.50 - - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
3.50 - - - - - -
3.50 - - - - - -
- - - - - -
Operation USD - - - - -
3.50 - - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
3.50 - - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
3.50 - - - - - -
3.50 - - - - - -
3.50 - - - - - -
- - - - - -
Operation USD - - - - 60,951
3.50 8,915.89 - - - - -
3.50 900.00 - - - - -
1.50 8,258.93 - - - - 8,258.93
1.50 5,505.95 - - - - 5,505.95
1.50 5,505.95 - - - - 5,505.95
1.50 200.00 - - - - 200.00
3.50 8,008.66 - - - - -
3.50 6,006.49 - - - - -
3.50 6,006.49 - - - - -
3.50 300.00 - - - - -
4.50 - - - - - -
4.50 14,265.42 - - - - 14,265.42
4.50 5,255.68 - - - - 5,255.68
4.50 5,255.68 - - - - 5,255.68
4.50 7,140.00 - - - - 7,140.00
4.50 - - - - - -
4.50 - - - - - -
4.50 2,252.44 - - - - 2,252.44
- - - - - -
4.50 1,530.00 - - - - 1,530.00
- - - - - -
750.81 - - - - -
- - - - - -
4.50 - - - - - -
500.00 - - - - -
4.50 - - - - - -
4.50 5,781.25 - - - - 5,781.25
4.50 8,400.00 - - - - -
5.00 2,520.00 - - - - -
5.00 630.00 - - - - -
- - - - - -
5.00 44,250.00 - - - - -
5.00 - - - - - -
5.00 - - - - - -
5.00 - - - - - -
5.00 - - - - - -
5.00 1,700.00 - - - - -
- - - - - -
Porcentage USD 95,219 - - 95,219 -
20% 88,578.54 - - - - -
80% 354,314.16 - - - - -
20% 95,219.20 95,219.20 - - - -
20% 95,219.20 - - - 95,219.20 -
30% 142,828.80 - - - - -
10% 47,609.60 - - - - -
10% 47,609.60 - - - - -
10% 47,609.60 - - - - -
MONTLY 95,219 - - 95,219 -51,126
ACCUM 95,219 95,219 95,219 190,438 139,312
LOCAL CONTRACT
Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15
5 6 7 8 9 10 11 12
8,772 11,200 - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
4,498.00 - - - - - - -
4,273.56 - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 5,600.00 - - - - - -
- - - - - - - -
- 5,600.00 - - - - - -
- - - - - - - -
- 8,941 - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 2,700.00 - - - - - -
- 1,201.22 - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 1,400.00 - - - - - -
- 740.00 - - - - - -
- 2,900.00 - - - - - -
- - - - - - - -
697 17,640 - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
642.00 - - - - - - -
54.60 - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 5,600.00 - - - - - -
- 2,440.00 - - - - - -
- 9,600.00 - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
8,009 79,629 - - - - - -
- 8,915.89 - - - - - -
- 900.00 - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
8,008.66 - - - - - - -
- 6,006.49 - - - - - -
- 6,006.49 - - - - - -
- 300.00 - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 8,400.00 - - - - - -
- 2,520.00 - - - - - -
- 630.00 - - - - - -
- - - - - - - -
- 44,250.00 - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- 1,700.00 - - - - - -
- - - - - - - -
95,219 - 190,438 - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - 142,828.80 - - - - -
- - 47,609.60 - - - - -
47,609.60 - - - - - - -
47,609.60 - - - - - - -
86,448 -11,200 190,438 - - - - -
225,760 214,560 404,998 404,998 404,998 404,998 404,998 404,998
FOREING CONTRACT
Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14
0 1 2 3 4 5 6
- - - - - 55,300 189,481
- - - - - - -
- - - - - - 125,330.10
- - - - - - 18,543.00
- - - - - - -
- - - - - - 9,240.00
- - - - - - 36,367.45
- - - - - 55,300.00 -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - 25,600 19,250 16,380
- - - - - - 13,500.00
- - - - - - -
- - - - - - -
- - - - - - 1,880.00
- - - - - - 1,000.00
- - - - - - -
- - - - - 19,250.00 -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - 19,800.00 - -
- - - - 5,800.00 - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - 136,882
- - - - - - 46,041.05
- - - - - - 12,781.01
- - - - - - -
- - - - - - 5,760.00
- - - - - - 2,000.00
- - - - - - 60,000.00
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - 9,000.10
- - - - - - -
- - - - - - 1,300.00
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
88,579 - - - - - 354,314
88,578.54 - - - - - -
- - - - - - 354,314.16
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
88,579 - - - - -55,300 164,834
88,579 88,579 88,579 88,579 88,579 33,279 198,112
NG CONTRACT
Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15
7 8 9 10 11 12
- - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -600.00
- - - - - - -
- - - - - - -1,120.00
- - - - - - -
- - - - - - -14.00
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - -
- - - - - - -
- - - - - - -
- - - - - - -66,511.66
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -7,007.58
- - - - - - -
- - - - - - -11,562.50
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -750.81
- - - - - - -
- - - - - - -
- - - - - - -500.00
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - -
198,112 198,112 198,112 198,112 198,112 198,112
PCM 100%
PROTECTION AND CONTROL 48% Protection, con
FAULT R. 12% 60%
METER 18% 50%
ALARMS 0%
40%
LAN & GPS 0%
TEST BLOCK 3%
30%
TRIP SUP 2% 20%
PERCENTAGE
AUXILIARY RELAY 3% 10%
ELECTRICAL MATERIAL 6% 0%
CABINET & ACC 5% L R. ER S S
TRO LT ET RM GP
U A &
INDEXUM - MAN HOUR 0%
C ON FA
M AL N
THIRD PARTY 2% D LA
AN
CONT 2% N
CTIO
RISK 0% E
ROT
P
SAS 100%
HARDWARE 21% Autom
POWER SUPPLY 1% 40%
SOFTWARE 26% 35%
LAN & GPS 36% 30%
CABLE 2% 25%
AUXILIARY RELAY 0% 20%
ELECTRICAL MATERIAL 2% 15%
PERCENTAGE
TELECOM 100%
POWER LINE CARRIER 53%
FIBER OPTIC 24% 60%
TELEPROTECTION 4%
50%
TELEPHONE SYSTEM 1%
CABLE 0% 40%
ELECTRICAL MATERIAL 1% 30%
CABINET & ACC 3%
PERCENTAGE
20%
10%
0%
IER TIC IO
N EM
40%
30%
PERCENTAGE
20%
INDEXUM - MAN HOUR 7%
THIRD PARTY 3% 10%
CONTINGENCY & RISK 4% 0%
RI
ER
P TIC IO
N EM
R O CT YST
CA ER TE S
E
FIB RO NE
LIN LEP HO
ER TE LEP
W TE
PO
SERVICE 100%
MANAGEMENT 7%
ENGINEERING 13% 35%
FAT 14% 30%
SAT 21% 25%
START UP 3%
20%
TRAINING 1%
15%
INSTALLATION 12%
PERCENTAGE
ER S
GP
S K P AY AL C UR RT
Y NT S
ET RM LOC SU EL ERI AC
HO A CO RI
M A & B IP R
AT T& P
AL N ST TR Y
AN D
LA TE AR LM NE IR
X ILI A BI -M TH
AU RIC CA M
EC
T
EXU
EL IN
D
Automatizacion de Subestaciones
E S E AY L RE Y
AR GP BL IA AC
C UR RT RI
SK
CA EL R TU HO PA
W & R TE & I
Y&
FT N RY A ET RN AN D C
SO LA LI IA
M N FU IR N
L BI - M TH GE
X CA CA
AU RI M IT N
EC
T
EXU N
EL IN
D CO
Telecomunicaciones
E L CC Y
IO
N EM BL IA UR RT ISK
N EM BL
E AL AC
C UR RT
Y SK
TIO ST A ERI HO A RI
C C
TE SY AT T& AN D
P
CY
&
RO NE L M INE M HIR N
LEP HO
CA CA
B - T GE
TE EP RI M TIN
TE
L
EC
T
EXU N
EL IN
D CO
Servicios
T T P N ES SK
NG FA SA TU NG RI
R INI ATIO VIC
ST
A
TR
A LL ER Y&
STA TYS ENC
IN AR G
D
P
NTIN
IR CO
TH
DESCRIPTION PCM
ELECTRONICS EQUIPMENT 77%
ELECTRICAL MATERIAL 14%
CABINET & ACCESORIES 5%
THIRD PARTY 2%
INDEXUM - MAN HOUR 0%
CONTINGENCY 2%
RISK 0%
RT
Y NT RI
SK
P A CO
RD
HI
DESCRIPTION SAS
ELECTRONICS EQUIPMENT 84%
CABLE 2%
ELECTRICAL MATERIAL 2%
CABINET & ACCESORIES 5%
THIRD PARTY 3%
INDEXUM - MAN HOUR 0%
CONTINGENCY 4%
RISK
R Y SK
RT RI
PA
D CY&
IR N
TH GE
IT N
N
CO
DESCRIPTION TELECOM
ELECTRONICS EQUIPMENT 82%
CABLE 0%
ELECTRICAL MATERIAL 1%
CABINET & ACCESORIES 3%
THIRD PARTY 3%
INDEXUM - MAN HOUR 7%
CONTINGENCY 4%
Y
RT ISK
RISK
Y SK
A RT RI
P &
IR
D
NCY
H
T GE
TIN
N
CO
DESCRIPTION SERVICES
ELECTRONICS EQUIPMENT 54%
CABLE 3%
ELECTRICAL MATERIAL 1%
CABINET & ACCESORIES 12%
THIRD PARTY 1%
INDEXUM - MAN HOUR 30%
CONTINGENCY 0%
RISK
ES SK
VIC RI
SE
R Y&
TY ENC
G
NTIN
CO