Technical Site Survey Report

For 3G Sector implementation

Project: IE4 Sector implementation


Region kandy
Site ID: KYNAW3
Site Name: Hapugasthalawa
Mobitel Project Engineer: Mr.Dumindu Chamikara
Sub company Name ELECOM ENGINEERING(Pvt)Ltd.
Sub Contractor Engineer: Mr.C.D pathirana.
Contact Number of Sub 0711010547
Survey Date: 17/07/2017

hapugasthalawa tssr
1. Current Information
Site Type 2G 900 2G 1800 3G

1.1 Site Basic Information


Survey Item Survey Contents

Site locatin Site address: Dialog Tower, Hapugasthalawa.


information Coordinates Latitude: 7.06278 Longitude: 80.57611 Altitude:
Site Owner Owner : Dialog Operator:
Information Telephone: Mobile phone:
Name kandy
Mobitel region
Telephone:
Equipment room location Equipment installation cabinet:
Roof top Shelter
Greenfield Building
Building Floor No(Excluding Ground Floor): Outdoor Cabinet
Site Other
environment Distance of Manual Transport required, (Flat land, Rocky
checking 1500m Rocky land
land, or Hill), if the distance is >50m
Hand Carry to Rooftops Floors No. N/R N/R
Is there any evidence of flooding near the site? Ie water stained,wall. Yes No
Any Special Delivery System Required? Crane Boomtruck 4WD
The Distance to the Site from Colombo 126km
Access Restriction Yes No Please specify:
Access on 7 Day Yes No If No,Please specify:
Twenty-four hours Yes No If No,Please specify:
Prior appointment for access ( person to be informed before site access )
No Yes Telephone: 777336034

Site access Contact person: Mr.duminda


information Site access key Mobitel Access Key Landlord Key Other Access Key
Parking space available Yes No
Equipment delivery to its position by Hand Lift Crane Other(mention in remarks)
Safe access to all equipment parts & antennas (lifeline systems, fall arrest systems, anchors.)
Yes No
If NO, please specify missing items:
need a 4*4 vehicle to transport equipment to the site(1500m).May need to get a permission from
Remarks Department of wild life conservation and from the land owner to transport equipments.

hapugasthalawa tssr
1.2 Site Existing Information
Meter Cubical Meter Cubical installed Yes NO
SPD Is Meter To ACPDB length > 20m? No `
YES Not installed
AC DC
Voltage: V Voltage: V
Armod cable length from MC to ACPDB Spare breaker Qty:
Armod cable dimension Breaker/Per capacity: A
Additional space for Huawei ACPDB: Rectifier Qty.
Existing Total Breaker Qty:
Power supply Existing Total Breaker capacity: Rectifier 1Type out Put Amperage:
Additional breaker Qty: Rectifier 2 Type out Put Amperage:
Additional Breaker capacity: Battery Type and capacity:
Spare AC outlet Qty for test equipment: Battery Type and capacity:
Three phase Single phase
If more than 1 BTS present, Are the AC power cable laid in the same path? Yes No
If No, please specify the power cable length in path 2:
Avaible ECB Qty (Outdoor): 3 Available ECB Qty (Indoor):
Spare ECB holesQty(Outdoor): 6 Spare ECB holes Qty(Indoor):
ECB
Required ECB Qty (Outdoor): 0 Required ECB Qty (Indoor):
Gap between available ECBs of the tower:

1.2 Site Existing Information


Meter Cubical Meter Cubical installed Yes NO
Tower Type: Self Support tower (SST) Guyed Mast tower (GMT) Pole
Monopole Tower
Tower Tower Leg Qty 3LEGS 4LEGS Tower Leg type: Anguar 'C' Channel
Tower Height: 50
Qty of spare antenna poles : 0
Transmission Equipment type MW Optical transceiver
Remarks No AC power available on the site.site is operated by an Electric generator owned by Dialog.

hapugasthalawa tssr
2. New equipment information
Site Type 2G 900 2G 1800 3G LTE

2.1 Site information


Equipment Type Indoor Outdoor

Enough Space for cabinet? Yes No

Need Site acquisition(Just for outdoor sites)? Yes No

Enough vertical cable space? Yes No

Need Extention Bars for Vertical Ladder Yes No

Enough Space for Extention Bars Yes No


Space Checking
Extension Bars (Provide The Drawing) No Yes Qty:

Enough horizontal cable space for fiber & power Yes No


ECB
Need extention ladder from tower to cabinet? Yes No

Enough Space for Ant?(Include Sectoral ) Yes No

Need additional Ant-mount? No Yes Qty: 3

Enough space for mount ZTE RRU Yes No

Comments

Need aditional ECBs for Tower No Yes Qty:

ECB interconnected ground cable Length(35mm 2) :


CEB supply AC power available? Yes No
AC Phase: 3 Phase 1 Phase
2
MC To ACDB Power Cable Length (4X16mm 25m
): Remarks:

hapugasthalawa tssr
2.3 2G & 3G Solution
UMTS 2100 Qty UMTS 2100 Qty

Node B ZTE 8900 2 Huawei DBS 3800


Configuration PC8910 DBS 3900
W201 BTS 3900
Equipment Base Need Additional Steel Frame? No Yes If Yes,Qty:
Can share existing antennas No Yes System Type :
Antenna Band New Ant. Ant.type Ant. Height Azimuth Tilt(°)
Share with
Cell1 TB 42 155 2
Antenna GSM
2100MHz Cell2 TB 42 275 2
Cell3 TB 42 350 2
Cell4
Clearnce
GPS Location of Installation:
Cable Length to BTS
Cell1 Cell 2 Cell 3 Cell 4
Jumper Length from Antenna To RRU (m) 3 3 3
Jumper, Fiber
RRU Power Cable Length from RRU to Rectifire (m) 70 70 70
etc.
Fiber Length (m) 70 70 70
Feeder length(m) 70 70 70
ACPDB To NODEB Power Cable Length:
SPD Ground Cable Length:
Cable & Pipe
Battery Cabinet Ground Cable Length:
BBU Ground Cable Length:

Remarks

hapugasthalawa tssr
3G Sector implementation Project-MOBITEL
Survey on the Required feeder type, length and connector

GSM DCS 3G
Sectors
Sector 1 Sector 2 Sector 3 Sector 4 Sector 1 Sector 2 Sector 3 Sector 4 Sector 1 Sector 2 Sector 3 Sector 4
Existing
Antenna
Type
Existing
Antenna
Height (m)
Existing
Antenna
Direction
Existing EDT - EDT - EDT - EDT - EDT - EDT - EDT - EDT - EDT - EDT - EDT - EDT -
Antenna Tilt MDT - 0 MDT -0 MDT -0 MDT - MDT - 0 MDT -0 MDT -0 MDT - MDT - 0 MDT -0 MDT -0 MDT -

Remarks:

Note:
Proposed details of the Required feeder type, length and connector

2G 3G
Sectors
Sector 1 Sector 2 Sector 3 Sector 4 Sector 1 Sector 2 Sector 3 Sector 4
Proposed
Antenna TB TB TB TB TB TB
Type
Proposed
Antenna 42 42 42 42 42 42
Height (m)
Proposed
Antenna 155 275 300 155 275 300
Direction
Proposed EDT - 2 EDT - 2 EDT - 2 EDT - EDT - 2 EDT - 2 EDT - 2 EDT -
Antenna Tilt MDT - 0 MDT - 0 MDT - 0 MDT - MDT -0 MDT -0 MDT -0 MDT -
Required
length of 3m 3m 3m 3m 3m 3m
1/2" Jumper
Feeder cable
70 70 70 70 70 70
length
Fiber Cable
70 70 70
Length
Required
length of
70 70 70
RRU Power
Cable

Remarks:

Note:

hapugasthalawa tssr
3. Photos / Sketch List
NO. Necessary photoes must provided: If taken
1 Overall Site View ok
2 Tower View ok
3 Antenna Location ok
4 Existing GSM 900 Antenna Photos (need to check the space to installe antennas) ok
5 Existing GSM 1800 Antenna Photos ok
6 Existing BBU Inside ok
7 Existing Room/Cabinet Inside ok
8 Existing vertical cable ladder ok
9 Existing horizontal cable ladder ok
10 Cable Entry Port Photos ok
11 Material List for 3G Secter installation ok

hapugasthalawa tssr
Overall Site View

Site ID KYNAW3 Site Name Hapugasthalawa Tower Photos

hapugasthalawa tssr
Tower Photos

Site ID KYNAW3 Site Name Hapugasthalawa Tower Photos

hapugasthalawa tssr
Mobitel Project — Phase 7

Site ID KYNAW3 Site Name Hapugasthalawa Panaromic view

0: 45:

90: 135:

180: 225:

270: 315:

hapugasthalawa tssr
Mobitel Project — Phase 7

Site ID KYNAW3 Site Name Hapugasthalawa Ground Panaromic view

0: 45:

90: 135:

180: 225:

270: 315:

hapugasthalawa tssr
Mobitel Project — Phase 7

Site ID KYNAW3 Site Name Hapugadthalawa Proposed Equipment location

sec1 antenna proposed location sec2 antenna proposed location

sec3 antenna proposed location

hapugasthalawa tssr
BTS proposed location

hapugasthalawa tssr
Mobitel Project — Phase 7

Site ID KYNAW3 Site Name Hapugasthalawa Existing cable ladder

Space available on vertical cable ladder

hapugasthalawa tssr
Mobitel Project — Phase 7

Site ID KYNAW3 Site Name Hapugasthalawa Stairs,elevator & other entries

need a 4*4 vehicle to transport equipment(1300m)

hapugasthalawa tssr
Materials list unit qty
TI RRU Power Cable Length 2 *6 70m 3
Fiber Cable length 70m 3
Fiber Clamp Pcs 70
Feeder cable length 70m 6
Feeder clamp Pcs 140
SFP Module Pcs 6
RRU R8880 Pcs 3
ANT Jumper Cable (RF-96514-016) S (Sector1) 3m 4
(Sector2) 3m 4
(Sector3) 3m 4
ANT Jumper Cable L (Sector1) 3m 2
(Sector2) 3m 2
(Sector3) 3m 2
feeder connector pcs 12
1/2" PVC Length (For Fiber Cable) m
CIVIL 19" Rack Pcs
GSM Bracket Pcs 3
Dual Bracket/Face Bracket Pcs
GI flexible 20mm ( Fiber cable length) m
Cu tape length m
CAD weld Pcs
ECBs Pcs
Steel plinth (GF) Nos
Steel Plinth (RT) Nos
Extension Bar m
Cable Ladder with support poles - outdoor m 12

Cable Ladder - Indoor m


TB antenna Pcs 1
Cable Ladder Support Pole - Indoor m
EARTHING Power earth Kit Pcs
MATERIALS Earth Cable 16mm (For RRU) m 15
Earth Cable 25mm (For Cabin ) m 20
Earth Cable 35mm m
Installation Accessories Box 3
CIVIL 1/2" PVC pipe for Ethernet cable parth m
1"PVC pipe for RRU power cable parth m
1 1/4" PVC pipe for Earth cable parth m
1" PVC pipe for Armoured AC power cable parth m
PVC bend sockets for Armoured AC power cable Pcs

hapugasthalawa tssr
75

10
100x50x6mm

102
section
3M Pole with U bolt
Variable
Existing 100mm width
L angle bar 51
33

36
10

M16 BOLTS

3000
285

51
450

122

100X50X6 mm
CHANNEL
210 SECTION
450
2 Nos of M16 "U" Bolts with

102
lock nuts & spring washer

PLAN VIEW OF BRACKET FOR


SINGLE ANGLE TOWER LEG
ELEVATION FOR 3M HIGH
DOUBLE CELLULAR BRACKET

Sub Contractor :- Site Name/ID :- Prepared By :-


KAVINDA
HAPUGASTHALAWA - KYNAW3

Drawing/Site Description:- Checked By :-


Client :- NISHANTHI
PROPOSED BRACKET

Date :- Scale :-
Customer :- 20.07.2017
Proposed Location
for Mobitel Cabinet
20m

A B

Generator
Proposed Horizontal
Room
Cable Ladder

3m
5m
8.4m
4m

12.7m

D C

Airtel
MC Dialog
Mobitel
MC
MC

Solar Panel
20m

2.2m

Gate

Sub Contractor : Customer : Site Name : HAPUGASTHALAWA Prepared By : KAVINDA Site Description :

Site ID : KYNAW3 Checked By : NISHANTHI PROPOSED LOCATION


FOR MOBITEL CABINET
Date : 20.07.2017 Scale : DO NOT SCALE
EXISTING GSM EXISTING GSM EXISTING GSM 50M
DIALOG ANT DIALOG ANT DIALOG ANT
@50m @50m @50m
SEC 3 EXISTING GSM EXISTING GSM EXISTING GSM
AIRTEL ANT AIRTEL ANT AIRTEL ANT
@46m @46m @46m

PROPOSED ANT PROPOSED ANT PROPOSED ANT


@42M 40M
@42M @42M
A B
SEC 1 EXISTING MW
EXISTING MW ANT @36m
ANT @35m

30M
KAVINDA

NISHANTHI

DO NOT SCALE
D C SEC 2 20M

PROPOSED TOWER
LAYOUT

TOWER TOP VIEW @ 42M 10M

KYNAW3

HAPUGASTHALAWA

20.07.2017
0M
LEG A LEG B LEG C LEG D

PROPOSED TOWER LAYOUT