Sunteți pe pagina 1din 11

COC1

Install and configuring computer system

Leading to computer system servicing n,,

ELC724331 Install and configure computer systems


ELC724332 Set-up computer networks
ELC724333 set-up computer server
ELC724334 Maintain and repair caomputers system and networking

UNIT COMPETENCY: INSTALLING AND CONIGURE COMPUTER SYSTEMS

UNIT CODE: ELC724331

MODEL TITLE: INSTALLING AND CONFIGURING COMPUTER SYSTEMS

MODULE DESCRIPTOR: This module covers the out comes required in installing and
configuring desktop and workstation computers systems.it
consist of competencies to assemble computer hardware.

Installing operating system and drivers for peripherals /devices

And install application software as well as to conduct testing and


w documentation.
NOMINAL DURATION: 40 HOURS

SUMMARY OR LEARNING OUTCOMES:

Upon completion of this module, the trainee/student must be able to:

LO1. Assemble computer hardware


LO2. Installing operating system ad drivers rof peripherals/device
LO3. Installing application software
LO4. Conduct testing and documents

 LO1. ASSEMBLE COMPUTER HARDWARE

ASSESSMENT CRITERIA:
1. Unit assembly is planned and prepared to ensure OH& policies and procedure are followed in
accordance with system requirements
2. Materials necessary to complete the network are identified and obtained in accordance with
established procedure and checked against system requirements
3. Tools, equipment and testing devices needed to carry out the installing work are obtained in
accordance with established procedure and checked for correct operating and safety
4. Computer hardware is assembled in accordance with established procedures and systems
requirements
5. Basic input-output system (BIOS) configuration is performed in accordance with hardware
requirements
6. 5s and 3Rs are followed according to environmental policies

CONTENT:

- types of computers
- parts of computers
-Description and purpose of firmware
-operation and function of basic input-output system(BIOS)
-safety handling of computer parts
electro-static devices (ESD)
effects of contaminants in computer parts
bending of boards
-System design
power supply and requirements
system specifications
-CPU core design and specifications
-memory specifications
-peripheral ports specifications
Enclosures and form factors
monitors, mouse and keyboard
-computer assembly procedure
*parts and peripheral mounting
*mother board settings and configurations
*controls and peripherals ports orientation
*air flow and ventilations
*desktop PC interface/hook up procedures
*power ON self-and BIOS configuration procedures
*5s and 3Rs environmental policies

CONDITIONS:
The student/trainees must be provide with following:
tools and test instruments
*screwdrivers set
Philips and flat
T-series
Hex
*headlamp
*anti-static wrist strap
*long nose pliers
*multi-tester
* table mat
Desktop PC parts and peripherals
*processor, mother board and memory
*video card
*network interface card
*hard disk and optical drive
*enclosure with power supply
*keyboard, mouse and speaker
*monitor
*test speaker (internal)

-Access to power points

METHODOLOGIES

*lecture
*discussion
*demonstration
*film viewing
*hand on practice

ASSESSMENT METHODIS

*written exam
*practical exam/demonstration
*observation in workplace

LO2 INSTALL OPERATING SYSTEMAND DRIVERS FOR PERIPHERALS/DEVICE

ASSESSMENT CRITERIA

1. Portable bootable devices are created in accordance with software manufacturer instruction
2. Customized installers are prepared in accordance with software utilization guide and end user
agreement

3. Installation of portable application are carried out in accordance with software user guide in
software license

4. Operating system (OS) is installed in accordance with established installation procedures and to
comply with end-user requirements

5. Peripherals/devices drivers are installed and configured in accordance with manufacturer’s


instruction and/or OS installation procedures.

6. OS and drivers updates/patches are accessed and installed in accordance with manufacturer’s
recommendation’s and requirements

7. On-going checks of the quality of the network are undertaken in accordance with established
procedure

CONTENT:

 Preparations of installation
o Slip-streaming
o Preparing bootable portable and optical devices
 Disk management
o Disk for matting
o Disk partitioning
 Computer operating system
o MAC OS X
o LINUX
 OS installation procedures
o Desktop OS
 Single boot
 Dual boot
o Network OS
 Single boot
 Dual boot
o 64-bit OS
 Installation of devices/drivers
 Update procedures
o OS
o Devices drivers
CONDITIONS:
The students/trainees must be provided with following
 Portable devices
o Flash drive
o External optical drive
 Computer
o 32-bit Desktop computer
o 64-bit desktop computer
 Computer peripherals/devices
o Printer
o Scanner
o Network interface card (NIC)

METHODOLOGIES:

 Lecture
 Discussion
 Demonstration
 Viewing multimedia
 Hands on practice

ASSESSMENT METHODS:

 Written exam
 Practical exam/demonstration
 Observation in work place

LO3. INSTALL THE COMPUTER APPLICATION SOFTWARE

ASSESSMENT CRITERIA:

1. Application software are installed based on software installation guides, end-user requirements
and software license agreement
2. Variation to application software installation is carried out in accordance to customer/client
requirements
3. Software updates are accessed and installed in accordance with manufacturer’s
recommendations and requirements

CONTENTS:
 Installation of applications
o Productivity tools
o Utilities
 Anti-virus
 Diagnostic/repair
 Virtualization software
 Applications software license agreements

 Software update procedures

o Applications
o Utilities

CONDITIONS:

The student/trainees must be provided with the following

 Portable devices
o Flash drive
o External optical drive
 Computer
o 32-bit desktop
o 64-bit desktop
o Laptop
o Network interface card (INC)
 Appropriate installer for software applications/programs

METHODIES:

 Lecture
 Discussion
 Demonstration
 Film viewing
 Hands on practice

ASSESSMENT METHODS:

 Written exam
 Practical exam/demonstration
 Observation in work place

LO4. CONDUCT TESTING AND DOCUMENTS

ASSESSMENT CRITERIA

1. Devices/system and/or installation is tasted to determine whether it conforms to requirements


2. Stress test is conducted to ensure reliability of requirements in accordance with manufacturer’s
instruction and system requirements
3. Documentation in relation to the test is forwarded to appropriate persoonel and/or authority in
accordance with requirements

CONTENT:

 Purpose and importance of stress test

 Stress test procedure

o CPU
o Memory
o Hard disk
o Documentation procedures

CONDITIONS:

The student/trainees must be provided with the following

 Portable devices
o Flash drive
o External optical drive
 Computer
o 32-bit desktop
o 64-bit desktop
o Laptop
o Network interface card (INC)
 Appropriate installer for software applications/programs

METHODIES:

 Lecture
 Discussion
 Demonstration
 Film viewing
 Hands on practice

ASSESSMENT METHODS:

 Written exam
 Practical exam/demonstration
 Observation in work place
CSS:COC2 – SETUP COMPUTER NETWORKS

STEPS and INSTRUCTIONS

1. Create 1 cross-over cable , 1 straight through cable and patch panel cable.

A). I consumed lots of time on this simple task due to the dullness of the crimping tools. Bring your own
id you can.

B). obviously you’ll have to know the wiring standards of T568A and T568B to create the cables.

C). Every patch panel is different, so before taking the exam, visit the assessment center and check the
patch panel type and color coding. The one I used had no color coding.

D). You must have every cable checked when finished at once by the assessor on order to move on

2. Connect all the devices together using the cables .

2desktop

1switch

1patch panel

1accesspoint

1laptop which will be connected wirelessly after configuring the router and access point.

3).Once all devices are connected, get the mac addresses of the pc, server and laptop for the purpose
assigning them IP addresses using DHCP reservations.

Note the mac addresses down together with the corresponding unit to avoid confusion. To get the MAC
address, open command prompt and type “getmac” or ”ipconfig”

A. Here, although the devices are all configured to get IP addresses using DHCP , you will be
instructed to select an IP addresses specifically that is why DHCP reservations should be
configured.
B. For example create DHCP pool of 192.18.1.100 to 192.168.1.200
C. For the pool, the IP192.168.1.114 should be assigned to the pc
D. 192.168.1.117 should be assigned to the server
E. 192.168.1.115 should be assigned to the laptop

4) configure the router using your web browser to access it’s interface

A. in order to access the router’s interface look for its IP address at the back of the devices, if it’s not
there you can ask the assessor, if the router address s indicated on the back of the device but you are
unable to access it using that address, reset first the router by pressing the power button for 10 to 20
seconds. Usually the password to access the interface indicated also on the device. Ask the assessor if
otherwise.

B). create the DHCP pool as instructed the ranges will be given by the assessor.

C). Change the SSID and configure wireless security using WPA2.

D). configure DHCP reservation

E). check your work by pinging the connected devices, if task is accomplished, move on the access point.

5). Configure the access point.

A). same steps as the router, you just have to change its SSID and IP configuration that corresponds with
the IP subnet you are using.

6). Now, connect the laptop to the access point.

7). Test interconnectivity of all devices by using the “PING” command. Make sure the devices got the
correct IP addresses reserved to them.

8). Create folders on all devices, share the folders and make sure everyone has read/write permissions.

9).show your work the assessor, he will give you instruction to test your work

COC3

SET UP COMPUTER SERVER

A set-up static IP address for client/server

-client

-server

B, install and configure DNS (Domain controller)

-create user two (2) account user 1&2

C) Install and configure DNS service

D) Install and configure DHCP services


E) Install and configure file-server GROPU POLICIES OBJECT (GPO)

-Folder redirection
F) Install and configure remote services-GPO

-remote desktop

-client so server

-server to client

G) install and configure printer server

-Display printer

H) connect laptop to WAP

-Ping server

-Test print user account

I) Test print format

-name

-qualification

-Assessment center

-date

-time

COC4

Maintaining computer systems and networks

*Creating system restore poini


*Creating system back-up image

* Using the create restore point to rest restore the system

*Using the create back-image

*disk defragmentation

*Disk clean up

*scanning for viruses

*oral questioning

S-ar putea să vă placă și