Sunteți pe pagina 1din 3

Date :

ThyssenKrupp Elevator STAGE 1 B


( India ) Machine checklist Job No.

Lay-out Drg. No.


PROJECT NAME :
Wing No. / Lift No.

Main Traction Sheave As per GAD Actual at site

S ……..mm S ……..mm
T ……..mm T ……..mm
R ……..mm R ……..mm

R machine beams

Deflector Pulley
S T RCC block

Ropes
m/c room bottom RCC slab

As per GAD Actual at site


CTC
CTC ( E & F ) = CTC = E = ..……..mm,
…...……..mm CTC = F = ..……..mm,

Point
No. Items to be checked. Y N
1 Machine beam grouting as per GAD.
2 Machine beams are in level. ( Tolerance is +/- 2 mm.)
3 Machine beams are supported for more than 150mm at both the ends in RCC block or in rear wall
4 Sockle of machine foundation RCC block is as per GAD. Plastering is done neatly.
5 Tie down bolts are clear in machine holes from all the sides.
6 Position of rubber pads is as per GAD.
7 Position of kick angles is as per GAD. Fixed properly.
8 Main rope cutouts are finished and raised up nearly by 50mm above m/c room floor slab
9 Deflector pulley cab be easily removable in future for maintenance purpose.
10 Main sheave is in plumb. ( Tolerance is +/- 1 mm.)
11 Deflector pulley is in plumb.( Tolerance is +/- 1 mm.)
12 Deflector pulley is parallel to main sheave.
13 Centers of main sheave and deflector pulley is in one line.
14 Car rail center is matching with main sheave center.
CWT rail center is matching with deflector rail center. ( Left to right tolerance is only 1mm )
15
( Front to back tolerance is +/- 3mm.)
16 Standing in front of controller, rotation of the main traction sheave can be seen easily.

Name & signature of Contracor with Name & signature of NI Engineer Name & signature of FQA-in-charge
Date with Date with Date
Doc.No. : 0095OP999901360 Page 25

S-ar putea să vă placă și