PROJECT : ARCHITECTURAL, CIVIL & STR

SCOPE OF WORKS : PIPING OSBL - PRC


LOCATION : TELUK BAYUR - PADANG - SUM
YEAR : 2019
 
 
NO ITEM OF WORKS
 

 
A PRELIMINARIES    
       
1 Mobilization of all personnel,plants,crane and any other required
  equipment and materials to carry out the work and to maintain
  them till job completion.  
2 Provide a Performance Bond for a sum not exceeding
  five percent (5%) of the contract Sum as specified in the
  Contract Document.    
3 Provide two Insurance as follows :
  - Conctractor's all Risks Insurance Policy
  - Workman's compensation
4 To include expense (provision)neccessary to produce a Bank
  Guarantee as a counter for advance payment.
5 Provide and maintain for the use of the contractor of works and client & consultant kind of safety h
and pairs of safety boots, safety glass, welding gloves, masker, full body harness of the assorted siz
  required,
  scaffolding standard, safety net, fire blanket, fire extinguisher
6 Establish and maintain during the entire period of stay at site
  Contractors' all temporary facilities such us office,workshop,
  fabrication area,store,sanitary facilities,etc.
7 Site meetings, Progress Reports and Work Programe
  a) The Concractor shall arrange and attend site meetings at fortnigtly
  or at interval as directed by the Engineer.
  b) The Concractor shall supply and maintain accurate written record
  of daily progress of works an other particulars an information related
  to the works.    
  c) Prepare, maintain, modify as and when required and submit to the
  Engineer for approval a detailed time schedule and progress chart
  as specified.    
8 Demobilization of all personnel,plant and equipment and materials
  upon completion of the works,with the approval from the Engineer.
9 Removal of all contractor's temporary facilities after completion
  of the work and make the complete area clean before leaving
  the site,with the approval from the Engineer.
10 To provide Medical facilities (First Aid) throughout the construction period.
11 Shop Drawing and as built drawing.
       
  SUB TOTAL    
       