TSG Services Rates

SERVICES DIVISION (NTDCL)


CHARGES FOR DIFFERENT TYPES OF SERVICES IMPARTED BY TSG
July, 2019
Sr. Suport Total Total
Man Days Man Day Rates Overhead Fixed Charges (Direct Cost)
No. Staff Fixed Fixed
Charges
Chief Mgr / DM / Asstt. Super Chief Mgr / DM / Asstt. Super Charges Man Day No. of Total Man Day Total Total Test Services Services
Total Man Day
Description of Technical Services Charges
Charges Per
Engineer Addl. Addl. Mgr visory Engineer Addl. Addl. Mgr visory ( 50% of ( 60% of Day Working Charges Test Equip. Charges Charges Charges
CE Mgr Staff CE Mgr Staff Man Days Man Days) Days (Unit Charges) Equipment (Unit Cost)
23500 17400 15200 12300 9500 Charges ) × (No. of Charges × (No. of
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) working days) Per Day working days) (A+B) (Rounded)
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
1
3*8 4*9 5 * 10 6 * 11 7 * 12 (8+9+10+11+12) (13 * 0.5) (13+14) * 0.6 (13+14+15) (16 * 17) A (19 * 17) B (18+20)
1 Thermo Vision Survey of Grid Stations
1.1 Thermo Vision Survey of Grid Station – 500KV 0.1 0.2 1 1 0 2,350 3,480 15,200 12,300 - 33,330 16,665 29,997 79,992 2 159,984 3,699 7,398 167,382 167,400
1.2 Thermo Vision Survey of Grid Station – 220KV 0.1 0.2 1 1 0 2,350 3,480 15,200 12,300 - 33,330 16,665 29,997 79,992 2 159,984 3,699 7,398 167,382 167,400
1.3 Thermo Vision Survey of Grid Station – 132KV / 66KV 0.1 0.2 1 1 0 2,350 3,480 15,200 12,300 - 33,330 16,665 29,997 79,992 1 79,992 3,699 3,699 83,691 83,700
1.4 Thermo Vision Survey of Turbine Generator 0.1 0.2 1 1 0 2,350 3,480 15,200 12,300 - 33,330 16,665 29,997 79,992 1 79,992 3,699 3,699 83,691 83,700
1.5 Thermo Vision Survey of T / Lines (for 25 KM ) 0.1 0.2 1 1 0 2,350 3,480 15,200 12,300 - 33,330 16,665 29,997 79,992 1 79,992 3,699 3,699 83,691 83,700
2 Battery Bank of Grid Station
2.1 AH Capacity Test of (220V/110V/48V) DC Battery Banks 0.1 0.2 1 1 1 2,350 3,480 15,200 12,300 9,500 42,830 21,415 38,547 102,792 1 102,792 2,277 2,277 105,069 105,100
2.2 Impedance Test of (220V/110V/48V) DC Battery Banks 0.1 0.2 1 0 1 2,350 3,480 15,200 - 9,500 30,530 15,265 27,477 73,272 1 73,272 2,277 2,277 75,549 75,500
2.3 Installation of (220V/110V/48V) DC Battery Banks per Day 0.1 0.2 1 0 1 2,350 3,480 15,200 - 9,500 30,530 15,265 27,477 73,272 1 73,272 2,277 2,277 75,549 75,500
3 LCM Test of Surge Arresters (3 Phase) 0.1 0.2 1 0 1 2,350 3,480 15,200 - 9,500 30,530 15,265 27,477 73,272 1 73,272 500 500 73,772 73,800
4 Overhauling of On Load Tap Changer of Transformer
4.1 500/220KV Transformer 0.1 0.2 1 1 0 2,350 3,480 15,200 12,300 - 33,330 16,665 29,997 79,992 3 239,976 500 1,500 241,476 241,500
4.2 220/132KV Transformer 0.1 0.2 1 1 0 2,350 3,480 15,200 12,300 - 33,330 16,665 29,997 79,992 2 159,984 500 1,000 160,984 161,000
4.3 132/11KV Transformer 0.1 0.2 1 1 0 2,350 3,480 15,200 12,300 - 33,330 16,665 29,997 79,992 2 159,984 500 1,000 160,984 161,000
5 Technical Inspection of Grid Stations
5.1 Technical Inspection of Grid Station – 500 / 220KV 0.1 0.2 1 1 1 2,350 3,480 15,200 12,300 9,500 42,830 21,415 38,547 102,792 5 513,960 - - 513,960 514,000
5.2 Technical Inspection of Grid Station – 220 / 132KV 0.1 0.2 1 1 1 2,350 3,480 15,200 12,300 9,500 42,830 21,415 38,547 102,792 4 411,168 - - 411,168 411,200
5.3 Technical Inspection of Grid Station – 132KV / 66KV 0.1 0.2 1 1 1 2,350 3,480 15,200 12,300 9,500 42,830 21,415 38,547 102,792 3 308,376 - - 308,376 308,400
6 Inspection/Trouble shooting of G/S Equip. Per Day 0.1 0.2 1 0 0 2,350 3,480 15,200 - - 21,030 10,515 18,927 50,472 1 50,472 - - 50,472 50,500
7 Witnessing Testing/Technical Studies etc. Per Day 0.1 0.2 1 0 0 2,350 3,480 15,200 - - 21,030 10,515 18,927 50,472 1 50,472 - - 50,472 50,500
8 Technical Inquiries/ Investigations etc. Per Day 0.1 0.2 1 0 0 2,350 3,480 15,200 - - 21,030 10,515 18,927 50,472 1 50,472 - - 50,472 50,500
9 Testing and Commissioning of G/S Equipment
9.1 Testing of 500KV 1 1/2 CB Scheme Transmission Line Bay 0.1 0.2 1 1 2 2,350 3,480 15,200 12,300 19,000 52,330 26,165 47,097 125,592 6 753,552 9,500 57,000 810,552 810,550
9.2 Testing of 220KV 1 1/2 CB Scheme Transmission Line Bay 0.1 0.2 1 1 2 2,350 3,480 15,200 12,300 19,000 52,330 26,165 47,097 125,592 6 753,552 9,500 57,000 810,552 810,550
9.3 Testing of 132KV Transmission Line Bay 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 2 178,224 4,500 9,000 187,224 187,200
10 Testing of Transformer Bays
10.1 Testing of 500 KV Transformer Bay 0.1 0.2 1 1 2 2,350 3,480 15,200 12,300 19,000 52,330 26,165 47,097 125,592 8 1,004,736 9,500 76,000 1,080,736 1,080,750
10.2 Testing of 220 KV Transformer Bay 0.1 0.2 1 1 2 2,350 3,480 15,200 12,300 19,000 52,330 26,165 47,097 125,592 7 879,144 9,500 66,500 945,644 945,650
10.3 Testing of 132 KV Transformer Bay 0.1 0.2 1 1 2 2,350 3,480 15,200 12,300 19,000 52,330 26,165 47,097 125,592 3 376,776 9,500 28,500 405,276 405,300
10.4 132kV Capacitor Bank Bay 0.1 0.2 1 1 3 2,350 3,480 15,200 12,300 28,500 61,830 30,915 55,647 148,392 4 593,568 9,500 38,000 631,568 631,600
11 Testing of Power Transformer
11.1 600MVA Bank or 450 MVA Bank 0.1 0.2 1 1 3 2,350 3,480 15,200 12,300 28,500 61,830 30,915 55,647 148,392 3 445,176 3,350 10,050 455,226 455,200
11.2 250 MVA or 160 MVA 0.1 0.2 1 1 3 2,350 3,480 15,200 12,300 28,500 61,830 30,915 55,647 148,392 2 296,784 3,008 6,016 302,800 302,800
11.3 20/26 MVA or 10/13 MVA 0.1 0.2 0 1 3 2,350 3,480 - 12,300 28,500 46,630 23,315 41,967 111,912 1 111,912 3,008 3,008 114,920 115,000

Page 1 of 3
Sr. Suport Total Total
Man Days Man Day Rates Overhead Fixed Charges (Direct Cost)
No. Staff Fixed Fixed
Charges
Chief Mgr / DM / Asstt. Super Chief Mgr / DM / Asstt. Super Charges Man Day No. of Total Man Day Total Total Test Services Services
Total Man Day
Description of Technical Services Charges
Charges Per
Engineer Addl. Addl. Mgr visory Engineer Addl. Addl. Mgr visory ( 50% of ( 60% of Day Working Charges Test Equip. Charges Charges Charges
CE Mgr Staff CE Mgr Staff Man Days Man Days) Days (Unit Charges) Equipment (Unit Cost)
23500 17400 15200 12300 9500 Charges ) × (No. of Charges × (No. of
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) working days) Per Day working days) (A+B) (Rounded)
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
1
3*8 4*9 5 * 10 6 * 11 7 * 12 (8+9+10+11+12) (13 * 0.5) (13+14) * 0.6 (13+14+15) (16 * 17) A (19 * 17) B (18+20)

12 Testing of Transformer Bushings


12.1 600MVA Bank or 450 MVA Bank 0.1 0.2 0 1 3 2,350 3,480 - 12,300 28,500 46,630 23,315 41,967 111,912 1 111,912 1,520 1,520 113,432 113,400
12.2 250 MVA or 160 MVA 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 1 89,112 1,520 1,520 90,632 90,600
12.3 20/26 MVA or 10/13 MVA 0.1 0.2 0 1 1 2,350 3,480 - 12,300 9,500 27,630 13,815 24,867 66,312 1 66,312 1,520 1,520 67,832 67,800
13 Testing of Bushing CT’s
13.1 600MVA Bank or 450 MVA Bank 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 1 89,112 2,196 2,196 91,308 91,300
13.2 250 MVA or 160 MVA 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 1 89,112 2,196 2,196 91,308 91,300
13.3 20/26 MVA or 10/13 MVA 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 1 89,112 2,196 2,196 91,308 91,300
14 Testing of Transformer Protection Relays
14.1 600MVA Bank or 450 MVA Bank 0.1 0.2 0 1 1 2,350 3,480 - 12,300 9,500 27,630 13,815 24,867 66,312 2 132,624 1,834 3,668 136,292 136,300
14.2 250 MVA or 160 MVA 0.1 0.2 0 1 1 2,350 3,480 - 12,300 9,500 27,630 13,815 24,867 66,312 2 132,624 1,834 3,668 136,292 136,300
14.3 20/26 MVA or 10/13 MVA 0.1 0.2 0 1 1 2,350 3,480 - 12,300 9,500 27,630 13,815 24,867 66,312 1 66,312 1,834 1,834 68,146 68,100
15 Calibration of T/F Temperature Gauges (for 4 - Nos) 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 1 89,112 1,389 1,389 90,501 90,500
16 SFRA Testing Set Charges
16.1 SFRA Testing Charges of 500KV A/F Bank 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 2 178,224 3,000 6,000 184,224 184,200
16.2 SFRA Testing Charges of 220KV A/F 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 1 89,112 3,000 3,000 92,112 92,100
16.3 SFRA Testing Charges of 132KV T/F 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 1 89,112 3,000 3,000 92,112 92,100
17 Testing of Transmission Lines
17.1 Testing of 500 KV Line 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 1 89,112 2,196 2,196 91,308 91,300
17.2 Testing of 220 KV Line 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 1 89,112 2,196 2,196 91,308 91,300
17.3 Testing of 132 KV Line 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 1 89,112 2,196 2,196 91,308 91,300
18 Testing of Transmission Line Protection Relays
18.1 Distance Relays/AR (for 2- Relays ) 0.1 0.2 0 1 1 2,350 3,480 - 12,300 9,500 27,630 13,815 24,867 66,312 1 66,312 1,834 1,834 68,146 68,100
18.2 Over Current & Earth Fault Relays (for 4 - Relays ) 0.1 0.2 0 1 1 2,350 3,480 - 12,300 9,500 27,630 13,815 24,867 66,312 1 66,312 1,834 1,834 68,146 68,100
18.3 Breaker Failure Relays (for 2 - Relays ) 0.1 0.2 0 1 1 2,350 3,480 - 12,300 9,500 27,630 13,815 24,867 66,312 1 66,312 1,834 1,834 68,146 68,100
19 Testing of 500 KV Shunt Reactor
19.1 Testing of 500 KV Shunt Reactor 0.1 0.2 1 1 2 2,350 3,480 15,200 12,300 19,000 52,330 26,165 47,097 125,592 2 251,184 4,506 9,012 260,196 260,200
19.2 Testing of 500 KV Shunt Reactor Bay 0.1 0.2 1 1 3 2,350 3,480 15,200 12,300 28,500 61,830 30,915 55,647 148,392 3 445,176 9,500 28,500 473,676 473,700
20 Testing of SMS CTs and PTs (Set of 3 CTs & 3PTs) 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 1 89,112 2,196 2,196 91,308 91,300
21 Witnessing of Pre-Commissioning Testing of T/F Bays
21.1 Witnessing 500 KV Transformer Bay (Per Day) 0.1 0.2 1 0 0 2,350 3,480 15,200 - - 21,030 10,515 18,927 50,472 1 50,472 - - 50,472 50,500
21.2 Witnessing 220 KV Transformer Bay (Per Day) 0.1 0.2 1 0 0 2,350 3,480 15,200 - - 21,030 10,515 18,927 50,472 1 50,472 - - 50,472 50,500
21.3 Witnessing 132 KV Transformer Bay (Per Day) 0.1 0.2 1 0 0 2,350 3,480 15,200 - - 21,030 10,515 18,927 50,472 1 50,472 - - 50,472 50,500
22 Energy Meter calibration/Accuracy Test (for 2-Meters) 0.1 0.2 1 1 3 2,350 3,480 15,200 12,300 28,500 61,830 30,915 55,647 148,392 1 148,392 4,674 4,674 153,066 153,100
23 Battery Charger
23.1 Battery Charger Calibration (for 2- Nos) 0.1 0.2 0 1 1 2,350 3,480 - 12,300 9,500 27,630 13,815 24,867 66,312 1 66,312 1,655 1,655 67,967 68,000
23.2 Battery Charger Repair (for 1 - No) 0.1 0.2 0 1 1 2,350 3,480 - 12,300 9,500 27,630 13,815 24,867 66,312 1 66,312 1,655 1,655 67,967 68,000
24 SF6 500KV / 220KV Switch Gear Testing Complete 0.1 0.2 0 1 3 2,350 3,480 - 12,300 28,500 46,630 23,315 41,967 111,912 2 223,824 1,841 3,682 227,506 227,500
25 SF6 500KV / 220KV CBs Dew Point and Purity Tests 0.1 0.2 0 1 1 2,350 3,480 - 12,300 9,500 27,630 13,815 24,867 66,312 1 66,312 1,841 1,841 68,153 68,200
26 Testing and Commissioning of 11KV Switchgear
26.1 11 KV In Coming Switchgear Pannel 0.1 0.2 0 1 1 2,350 3,480 - 12,300 9,500 27,630 13,815 24,867 66,312 1 66,312 4,155 4,155 70,467 70,500
26.2 11 KV Out Going Switchgear Pannels (for 2 - Pannels) 0.1 0.2 0 1 1 2,350 3,480 - 12,300 9,500 27,630 13,815 24,867 66,312 1 66,312 4,155 4,155 70,467 70,500
26.3 Installation & Testing of 11 KV Capacitor Bank 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 1 89,112 2,196 2,196 91,308 91,300

Page 2 of 3
Sr. Suport Total Total
Man Days Man Day Rates Overhead Fixed Charges (Direct Cost)
No. Staff Fixed Fixed
Charges
Chief Mgr / DM / Asstt. Super Chief Mgr / DM / Asstt. Super Charges Man Day No. of Total Man Day Total Total Test Services Services
Total Man Day
Description of Technical Services Charges
Charges Per
Engineer Addl. Addl. Mgr visory Engineer Addl. Addl. Mgr visory ( 50% of ( 60% of Day Working Charges Test Equip. Charges Charges Charges
CE Mgr Staff CE Mgr Staff Man Days Man Days) Days (Unit Charges) Equipment (Unit Cost)
23500 17400 15200 12300 9500 Charges ) × (No. of Charges × (No. of
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) working days) Per Day working days) (A+B) (Rounded)
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
1
3*8 4*9 5 * 10 6 * 11 7 * 12 (8+9+10+11+12) (13 * 0.5) (13+14) * 0.6 (13+14+15) (16 * 17) A (19 * 17) B (18+20)

27 Cable Testing (Per Day) 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 1 89,112 2,196 2,196 91,308 91,300
28 Pad Mounted T/F upto 1MVA (for 2 T/Fs) 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 1 89,112 14,195 14,195 103,307 103,300
29 Testing and Commissioning of LT System of Single T/F 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 1 89,112 3,695 3,695 92,807 92,800
30 Earth Mesh Integrity Test
30.1 Earth Mesh Integrity Test of 500/220 KV Grid Station 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 2 178,224 3,000 6,000 184,224 184,200
30.2 Earth Mesh Integrity Test of 220/132 KV Grid Station 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 2 178,224 3,000 6,000 184,224 184,200
30.3 Earth Mesh Integrity Test of 132/66/11 KV Grid Station 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 1 89,112 3,000 3,000 92,112 92,100
31 SF6 Gas Delo Plant Charges (Per Day) 0.1 0.2 0.3 1 1 2,350 3,480 4,560 12,300 9,500 32,190 16,095 28,971 77,256 1 77,256 2,700 2,700 79,956 80,000
32 Live Line Washing Unit Charges (Per Day) 0.1 0.2 0.3 1 6 2,350 3,480 4,560 12,300 57,000 79,690 39,845 71,721 191,256 1 191,256 6,000 6,000 197,256 197,300
33 Hi Pot Testing Charges 0.1 0.2 0 1 1 2,350 3,480 - 12,300 9,500 27,630 13,815 24,867 66,312 1 66,312 2,196 2,196 68,508 68,500
NOTES
1. The above service charges are exclusive of Transport Charges,TA/DA, transit and lodging charges. 4. TA/DA will be charged as per working days
2. Transport charges will be as under : 5. Accomodation / Night stay charges will be charged as per rule.
a) For TSG Vehicle Rs 60/KM (including vehicle depreciation cost , POL, Driver Pay & Allowances etc ). 6. Overall Charges = Fixed Charges + Variable Charges
b) Journey by Air , Rail or rented vehicles will be charged on actual basis. 7. Company Fee @30% of Fixed Charges/Man Hour Charges will be charged for private works in addition to Normal Charges
c) In case of vehicle provided by the client , no transport charges will be claimed. 8. Charges for activities not covered as above list will be computed according to the services rendered.
3. Transit Charges will be charged as per days of travelling. 9. Time spent on any work that was contractor's responsibility will be charged seperately.

Engr. Ijaz Ahmed Khan Engr. Shakeel Ahmed Awan Engr. Muhammad Arif Engr. Anjum Aziz
Addl. Chief Engineer R & T Manager Grids Manager P & M Chief Engineer TSG

Page 3 of 3