Chief Mgr / DM / Asstt. Super Chief Mgr / DM / Asstt. Super Charges Man Day No. of Total Man Day Total Total Test Services Services
Total Man Day
Description of Technical Services Charges
Charges Per
Engineer Addl. Addl. Mgr visory Engineer Addl. Addl. Mgr visory ( 50% of ( 60% of Day Working Charges Test Equip. Charges Charges Charges
CE Mgr Staff CE Mgr Staff Man Days Man Days) Days (Unit Charges) Equipment (Unit Cost)
23500 17400 15200 12300 9500 Charges ) × (No. of Charges × (No. of
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) working days) Per Day working days) (A+B) (Rounded)
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
1
3*8 4*9 5 * 10 6 * 11 7 * 12 (8+9+10+11+12) (13 * 0.5) (13+14) * 0.6 (13+14+15) (16 * 17) A (19 * 17) B (18+20)
Page 2 of 3
Sr. Suport Total Total
Man Days Man Day Rates Overhead Fixed Charges (Direct Cost)
No. Staff Fixed Fixed
Charges
Chief Mgr / DM / Asstt. Super Chief Mgr / DM / Asstt. Super Charges Man Day No. of Total Man Day Total Total Test Services Services
Total Man Day
Description of Technical Services Charges
Charges Per
Engineer Addl. Addl. Mgr visory Engineer Addl. Addl. Mgr visory ( 50% of ( 60% of Day Working Charges Test Equip. Charges Charges Charges
CE Mgr Staff CE Mgr Staff Man Days Man Days) Days (Unit Charges) Equipment (Unit Cost)
23500 17400 15200 12300 9500 Charges ) × (No. of Charges × (No. of
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) working days) Per Day working days) (A+B) (Rounded)
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
1
3*8 4*9 5 * 10 6 * 11 7 * 12 (8+9+10+11+12) (13 * 0.5) (13+14) * 0.6 (13+14+15) (16 * 17) A (19 * 17) B (18+20)
27 Cable Testing (Per Day) 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 1 89,112 2,196 2,196 91,308 91,300
28 Pad Mounted T/F upto 1MVA (for 2 T/Fs) 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 1 89,112 14,195 14,195 103,307 103,300
29 Testing and Commissioning of LT System of Single T/F 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 1 89,112 3,695 3,695 92,807 92,800
30 Earth Mesh Integrity Test
30.1 Earth Mesh Integrity Test of 500/220 KV Grid Station 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 2 178,224 3,000 6,000 184,224 184,200
30.2 Earth Mesh Integrity Test of 220/132 KV Grid Station 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 2 178,224 3,000 6,000 184,224 184,200
30.3 Earth Mesh Integrity Test of 132/66/11 KV Grid Station 0.1 0.2 0 1 2 2,350 3,480 - 12,300 19,000 37,130 18,565 33,417 89,112 1 89,112 3,000 3,000 92,112 92,100
31 SF6 Gas Delo Plant Charges (Per Day) 0.1 0.2 0.3 1 1 2,350 3,480 4,560 12,300 9,500 32,190 16,095 28,971 77,256 1 77,256 2,700 2,700 79,956 80,000
32 Live Line Washing Unit Charges (Per Day) 0.1 0.2 0.3 1 6 2,350 3,480 4,560 12,300 57,000 79,690 39,845 71,721 191,256 1 191,256 6,000 6,000 197,256 197,300
33 Hi Pot Testing Charges 0.1 0.2 0 1 1 2,350 3,480 - 12,300 9,500 27,630 13,815 24,867 66,312 1 66,312 2,196 2,196 68,508 68,500
NOTES
1. The above service charges are exclusive of Transport Charges,TA/DA, transit and lodging charges. 4. TA/DA will be charged as per working days
2. Transport charges will be as under : 5. Accomodation / Night stay charges will be charged as per rule.
a) For TSG Vehicle Rs 60/KM (including vehicle depreciation cost , POL, Driver Pay & Allowances etc ). 6. Overall Charges = Fixed Charges + Variable Charges
b) Journey by Air , Rail or rented vehicles will be charged on actual basis. 7. Company Fee @30% of Fixed Charges/Man Hour Charges will be charged for private works in addition to Normal Charges
c) In case of vehicle provided by the client , no transport charges will be claimed. 8. Charges for activities not covered as above list will be computed according to the services rendered.
3. Transit Charges will be charged as per days of travelling. 9. Time spent on any work that was contractor's responsibility will be charged seperately.
Engr. Ijaz Ahmed Khan Engr. Shakeel Ahmed Awan Engr. Muhammad Arif Engr. Anjum Aziz
Addl. Chief Engineer R & T Manager Grids Manager P & M Chief Engineer TSG